# Texas Research Institute , Austin, Inc.

Canonical: https://abierto.us/vendors/texas-research-institute-austin-inc-lm1nwmdnnq18

- UEI: LM1NWMDNNQ18
- CAGE: 0FT48
- Location: Austin, TX
- Awards in window: 47 (96 transactions), $17,521,516 obligated, January 14, 2025 to August 6, 2026

## Awarding agencies

- Department of the Navy: 19 awards, $12,654,591
- Department of the Army: 5 awards, $2,037,429
- Department of the Air Force: 12 awards, $1,364,163
- National Aeronautics and Space Administration: 6 awards, $1,003,138
- Defense Threat Reduction Agency: 1 awards, $199,997
- Missile Defense Agency: 2 awards, $162,199
- Defense Microelectronics Activity: 1 awards, $99,999
- Defense Health Agency: 1 awards, $0

## Industries

- 541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology): $10,766,776
- 541713 Research and Development in Nanotechnology: $6,754,740

## Competition

- Full and Open Competition After Exclusion of Sources: 43 awards
- Full and Open Competition: 3 awards
- Not Available for Competition: 1 awards

## Largest awards

- N0002426C3006 (definitive contract): $1,995,498, NAVSEA HQ. Base. https://www.usaspending.gov/award/CONT_AWD_N0002426C3006_9700_-NONE-_-NONE-/
- N0002426C3077 (definitive contract): $1,399,896, NAVSEA HQ. Base. https://www.usaspending.gov/award/CONT_AWD_N0002426C3077_9700_-NONE-_-NONE-/
- N0002425CS061 (definitive contract): $1,399,723, NAVSEA HQ. Base for SBIR Phase II Topic N121-063, Ablative Material to Efficiently Repair and Restore the Operational Capabilities of MK 41 Vertical Launch System (Vls) Ablative Materials.. https://www.usaspending.gov/award/CONT_AWD_N0002425CS061_9700_-NONE-_-NONE-/
- W911QY26CA029 (definitive contract): $1,397,124, W6QK ACC-APG Natick. Small Business Innovation Research Phase II Effort for the Development of Hybrid Class 3 Polymer Based Breathable Barrier Materials. https://www.usaspending.gov/award/CONT_AWD_W911QY26CA029_9700_-NONE-_-NONE-/
- N0002425CS011 (definitive contract): $1,359,242, NAVSEA HQ. Base Award for SBIR Phase II Topic #N231-051.. https://www.usaspending.gov/award/CONT_AWD_N0002425CS011_9700_-NONE-_-NONE-/
- N0002426C3024 (definitive contract): $1,334,142, NAVSEA HQ. Base. https://www.usaspending.gov/award/CONT_AWD_N0002426C3024_9700_-NONE-_-NONE-/
- FA865022C5026 (definitive contract): $1,150,000, FA8650 USAF AFMC AFRL PZL Afrl/Pzl. Non-Destructive Evaluation of Thick Scarf Repaired Composites and Related As-Manufactured Structures. https://www.usaspending.gov/award/CONT_AWD_FA865022C5026_9700_-NONE-_-NONE-/
- N6833525C0475 (definitive contract): $999,995, NAVAIR Warfare CTR Aircraft Div. SBIR Phase II. https://www.usaspending.gov/award/CONT_AWD_N6833525C0475_9700_-NONE-_-NONE-/
- N6833526C0233 (definitive contract): $998,793, NAVAIR Warfare CTR Aircraft Div. 873authority. https://www.usaspending.gov/award/CONT_AWD_N6833526C0233_9700_-NONE-_-NONE-/
- N6833523C0009 (definitive contract): $995,402, NAVAIR Warfare CTR Aircraft Div. Nce for Clins 0001 and 0002. https://www.usaspending.gov/award/CONT_AWD_N6833523C0009_9700_-NONE-_-NONE-/
- 80NSSC26C0020 (definitive contract): $846,760, NASA Shared Services Center. SBIR Phase II. https://www.usaspending.gov/award/CONT_AWD_80NSSC26C0020_8000_-NONE-_-NONE-/
- N0002424CS064 (definitive contract): $591,986, NAVSEA HQ. Removal of FAR Clauses 52.222-21 and 52.222-26 Pursuant to Executive Order 11246.. https://www.usaspending.gov/award/CONT_AWD_N0002424CS064_9700_-NONE-_-NONE-/
- N6833523C0410 (definitive contract): $499,997, NAVSEA HQ. Remove FAR Clauses 52.222-21 and 52.222-26. https://www.usaspending.gov/award/CONT_AWD_N6833523C0410_9700_-NONE-_-NONE-/
- W5170125C0094 (definitive contract): $249,950, W27P USA Acq SPT CTR. SBIR Topic A244-054, Additive Manufacturing for High-Density Materials.. https://www.usaspending.gov/award/CONT_AWD_W5170125C0094_9700_-NONE-_-NONE-/
- N0002425CS188 (definitive contract): $239,991, NAVSEA HQ. New Award for SBIR PH I Topic #N251-027. https://www.usaspending.gov/award/CONT_AWD_N0002425CS188_9700_-NONE-_-NONE-/
- N6833525C0361 (definitive contract): $239,988, NAVAIR Warfare CTR Aircraft Div. Research and Development.. https://www.usaspending.gov/award/CONT_AWD_N6833525C0361_9700_-NONE-_-NONE-/
- W911SR25C0024 (definitive contract): $204,000, W6QK ACC-APG. Low Cost Non Toxic, Compact Solution Utilizing Phase Change Materials for Tailorable Thermal Regulation Within Closed Circuit Self Contained Breathing Apparatuses to Reduce Thermal Burden to the Warfighter.. https://www.usaspending.gov/award/CONT_AWD_W911SR25C0024_9700_-NONE-_-NONE-/
- HDTRA225PE015 (purchase order): $199,997, Defense Threat Reduction Agency. High/Ultra Performance Concrete Standoff Detection and Diagnosis. https://www.usaspending.gov/award/CONT_AWD_HDTRA225PE015_9700_-NONE-_-NONE-/
- W911QY25P0026 (purchase order): $197,282, W6QK ACC-APG Natick. Development of Hybrid Class 3 Polymer Based Breathable Barrier Materials.. https://www.usaspending.gov/award/CONT_AWD_W911QY25P0026_9700_-NONE-_-NONE-/
- HQ086026CE036 (definitive contract): $179,997, Missile Defense Agency (Mda). Nitrogen Leak Detection and Measurement Technology. https://www.usaspending.gov/award/CONT_AWD_HQ086026CE036_9700_-NONE-_-NONE-/
- N6833525C0212 (definitive contract): $174,994, NAVAIR Warfare CTR Aircraft Div. Research and Development. https://www.usaspending.gov/award/CONT_AWD_N6833525C0212_9700_-NONE-_-NONE-/
- N0002425CS092 (definitive contract): $174,986, NAVSEA HQ. SBIR Phase I. https://www.usaspending.gov/award/CONT_AWD_N0002425CS092_9700_-NONE-_-NONE-/
- 80NSSC25C0373 (definitive contract): $156,378, NASA Shared Services Center. SBIR Phase I 80nssc25c0373 Phase Reflectors as an IN-SITU Passive Unpowered Wireless Structural Health Monitor for Lunar Excavation Vehicles. https://www.usaspending.gov/award/CONT_AWD_80NSSC25C0373_8000_-NONE-_-NONE-/
- N6833526C1013 (definitive contract): $149,966, NAVAIR Warfare CTR Aircraft Div. Tri NAVAIR STTR Phase III Topic# Af21a-Tcso2. https://www.usaspending.gov/award/CONT_AWD_N6833526C1013_9700_-NONE-_-NONE-/
- FA865225C0004 (definitive contract): $139,995, FA8652 AFRL HQ Afrl/Pk. Inspection of Bonded Composite Structures Through Fairing Materials. https://www.usaspending.gov/award/CONT_AWD_FA865225C0004_9700_-NONE-_-NONE-/
- HQ072725CE004 (definitive contract): $99,999, Defense Microelectronics Activity. SBIR Phase I - Modeling, Optimization, and Monitoring of Thick Sic Epitaxy Processes Open Topic. https://www.usaspending.gov/award/CONT_AWD_HQ072725CE004_9700_-NONE-_-NONE-/
- N6833524C0368 (definitive contract): $99,992, NAVAIR Warfare CTR Aircraft Div. Exercise an Option. https://www.usaspending.gov/award/CONT_AWD_N6833524C0368_9700_-NONE-_-NONE-/
- FA239426CB010 (definitive contract): $75,000, FA2394 USAF AFMC AFRL PZL AFRL RXKM. Mast (Model-Based Advanced Sensing for Transformation). https://www.usaspending.gov/award/CONT_AWD_FA239426CB010_9700_-NONE-_-NONE-/
- 80NSSC18C0142 (definitive contract): $0, NASA Shared Services Center. The Primary Objective of This Effort Is to Design and Build a Practical Millimeter Wave Imaging System Capable of Effectively Addressing a Myriad of Nondestructive Inspection Issues Related to Complex Composites and Structures During Manufacturing and Use. the Design of This Imaging System Will Be Founded on a Long History and Extensive Experience by the Proposing Team Facilitating and Ensuring a Successful Outcome. the System Is Expected to Be Designed To: I)operate in the Frequency Range of 30-40 Ghz: Ii)have High-Spatial and Range Resolutions in the Few Millimeter Range Rendering the System a 3D Imager Iii)produce and Render Images in Real-Time, Iv)provide High System Dynamic Range for High Detection Sensitivity V)small and Portable for IN-SPACE Applications, Vi)modular in Design to Accommodate Large Structures in Terrestrial Inspection Applications While Also Suitable for IN-SPACE Applications by Personnel with Varied Technical Skill-Sets Namely, Technicians, Engineers and Astronauts. the Proposed Work in This Phase II to Develop, Built and Test a Practical Prototype Imaging System Builds on the Phase I Design Work. Potential NASA. https://www.usaspending.gov/award/CONT_AWD_80NSSC18C0142_8000_-NONE-_-NONE-/
- 80NSSC22CA150 (definitive contract): $0, NASA Shared Services Center. EO14042 FY22 SBIR Phase II Persistently Antimicrobial Polyurethanes for Improved Pressure Garment Bladders. https://www.usaspending.gov/award/CONT_AWD_80NSSC22CA150_8000_-NONE-_-NONE-/
- 80NSSC22CA185 (definitive contract): $0, NASA Shared Services Center. Millimeter-Wave Camera. https://www.usaspending.gov/award/CONT_AWD_80NSSC22CA185_8000_-NONE-_-NONE-/
- 80NSSC23CA159 (definitive contract): $0, NASA Shared Services Center. SBIR Phase II Accelerated Creep Test Methodologies for Space Habitat Softgood Structural Materials. https://www.usaspending.gov/award/CONT_AWD_80NSSC23CA159_8000_-NONE-_-NONE-/
- FA239423CB023 (definitive contract): $0, FA2394 USAF AFMC AFRL PZL AFRL RXKM. Machine Learning and Artificial Intelligence for Assisted Data Analysis of IN-FIELD Data from Complex Composite Structures. https://www.usaspending.gov/award/CONT_AWD_FA239423CB023_9700_-NONE-_-NONE-/
- FA810023C0006 (definitive contract): $0, FA8100 AFSC Pziec. Bolt Hole Eddy Current (Bhec) Signal Indication Interpretation, Small Business Innovation Research (Sbir) Direct to Phase Ii, Topic AF231-D019. https://www.usaspending.gov/award/CONT_AWD_FA810023C0006_9700_-NONE-_-NONE-/
- FA864924P1004 (purchase order): $0, FA8649 USAF SBIR STTR Cntrctng AFRL. F2D-13599, Nondestructive Inspection for Airworthiness Approvals for Cold Spray Repairs. https://www.usaspending.gov/award/CONT_AWD_FA864924P1004_9700_-NONE-_-NONE-/
- FA865022C5007 (definitive contract): $0, FA8650 USAF AFMC AFRL PZL Afrl/Pzl. Nondestructive Instrument to Determine Composite Surface Activation State. https://www.usaspending.gov/award/CONT_AWD_FA865022C5007_9700_-NONE-_-NONE-/
- FA865022C5033 (definitive contract): $0, FA8650 USAF AFMC AFRL PZL Afrl/Pzl. Spatial Registration of Ndi/E Sensors for Confined or Restricted Access Spaces. https://www.usaspending.gov/award/CONT_AWD_FA865022C5033_9700_-NONE-_-NONE-/
- FA865023C5002 (definitive contract): $0, FA8650 USAF AFMC AFRL PZL Afrl/Pzl. Abrasion Coatings. https://www.usaspending.gov/award/CONT_AWD_FA865023C5002_9700_-NONE-_-NONE-/
- FA865023C5010 (definitive contract): $0, FA8650 USAF AFMC AFRL PZL Afrl/Pzl. High Temperature Paste Adhesives and Sealants. https://www.usaspending.gov/award/CONT_AWD_FA865023C5010_9700_-NONE-_-NONE-/
- FA865023C5012 (definitive contract): $0, FA8650 USAF AFMC AFRL PZL Afrl/Pzl. Rapid Non-Contact Reprocessing of Impact Resistant. https://www.usaspending.gov/award/CONT_AWD_FA865023C5012_9700_-NONE-_-NONE-/
- HT942524C0020 (definitive contract): $0, Army Med Res Acq Activity. Type IV Medical Oxygen Storage Cylinder. https://www.usaspending.gov/award/CONT_AWD_HT942524C0020_9700_-NONE-_-NONE-/
- N0002424CT033 (definitive contract): $0, NAVSEA HQ. Base. https://www.usaspending.gov/award/CONT_AWD_N0002424CT033_9700_-NONE-_-NONE-/
- N6833521C0483 (definitive contract): $0, NAVSEA HQ. Modification to Provide a Nce to Clins 0005 & 0006 for SBIR Phase II Topic #N192-111.. https://www.usaspending.gov/award/CONT_AWD_N6833521C0483_9700_-NONE-_-NONE-/
- N6833522C0169 (definitive contract): $0, NAVSEA HQ. Research and Development. https://www.usaspending.gov/award/CONT_AWD_N6833522C0169_9700_-NONE-_-NONE-/
- FA865020C5204 (definitive contract): -$832, FA8650 USAF AFMC AFRL PZL Afrl/Pzl. Automated Defect Analysis of Fastened PMC Structure. https://www.usaspending.gov/award/CONT_AWD_FA865020C5204_9700_-NONE-_-NONE-/
- W911QX19C0006 (definitive contract): -$10,928, W6QK ACC-APG Adelphi. Funding De-Obligation Modification. https://www.usaspending.gov/award/CONT_AWD_W911QX19C0006_9700_-NONE-_-NONE-/
- HQ014719C7155 (definitive contract): -$17,798, Missile Defense Agency (Mda). Sbir/Sttr Phase II R & D. https://www.usaspending.gov/award/CONT_AWD_HQ014719C7155_9700_-NONE-_-NONE-/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://abierto.us/vendors/texas-research-institute-austin-inc-lm1nwmdnnq18.
