# Terry Service, Inc.

Canonical: https://abierto.us/vendors/terry-service-inc-ry6qbrmcj658

- UEI: RY6QBRMCJ658
- CAGE: 0S6W0
- Location: Ridgeland, MS
- Awards in window: 14 (15 transactions), $2,327,657 obligated, January 24, 2025 to July 24, 2026

## Awarding agencies

- Department of the Army: 9 awards, $1,899,672
- Federal Prison System / Bureau of Prisons: 4 awards, $419,885
- Agricultural Research Service: 1 awards, $8,100

## Industries

- 332410 Power Boiler and Heat Exchanger Manufacturing: $1,890,223
- 238220 Plumbing, Heating, and Air-Conditioning Contractors: $450,033
- 811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance: -$12,600

## Competition

- Competed Under SAP: 8 awards
- Not Competed Under SAP: 6 awards

## Solicitations won

- FCC Yazoo City - Air Cooled Condensors Replacement (23Z3AJ2), $236,975. https://abierto.us/opportunities/23z3aj2
- Chiller Service Maintenance FY26 W/ 4 Option Years (1232SA26Q0287). https://abierto.us/opportunities/1232sa26q0287
- ADDITIONAL ABSORPER SUPPLIES FOR MAT SINKING UNIT (W912EE25PA078). https://abierto.us/opportunities/w912ee25pa078
- Absorption Chiller Tubes Replacement (W912EE25P0031), $176,371. https://abierto.us/opportunities/w912ee25p0031
- Mat Sinking Unit Hot Water Replacement (W912EE25PA023), $499,823. https://abierto.us/opportunities/w912ee25pa023

## Largest awards

- W912EE25PA023 (purchase order): $499,823, W07V Endist Vicksburg. The USACE Mat Sinking Unit Requires a Replacement Hot Water Boiler on Power Barge 5014.. https://www.usaspending.gov/award/CONT_AWD_W912EE25PA023_9700_-NONE-_-NONE-/
- W912EE25PA078 (purchase order): $451,823, W07V Endist Vicksburg. The Mat Sinking Unit Requires the Replacement of Additional Tubes in the Absorber and Condenser Sections of Its Absorption Chiller on Power Barge 5014.. https://www.usaspending.gov/award/CONT_AWD_W912EE25PA078_9700_-NONE-_-NONE-/
- W912EE26PA028 (purchase order): $270,701, W07V Endist Vicksburg. Boiler Tube Replacement for Power Barge 5014. https://www.usaspending.gov/award/CONT_AWD_W912EE26PA028_9700_-NONE-_-NONE-/
- W912EE25PA049 (purchase order): $259,364, W07V Endist Vicksburg. The Mat Sinking Unit Requires the Replacement of Its Remaining Absorption Chiller Tubes and Additional Lithium Bromide to the System to Bring the Unit Into Proper Working Condition in Preparation for the 2025 Mat Sinking Season.. https://www.usaspending.gov/award/CONT_AWD_W912EE25PA049_9700_-NONE-_-NONE-/
- 15B31526P00000132 (purchase order): $236,975, FCC Yazoo City. Installation of One (1) 20-TON and Two (2) 30-TON Dual-Circuit Air-Cooled Condensers, Including Labor, Equipment, Materials, Electrical Wiring, and a Concrete Pad.. https://www.usaspending.gov/award/CONT_AWD_15B31526P00000132_1540_-NONE-_-NONE-/
- W912EE26PA030 (purchase order): $232,142, W07V Endist Vicksburg. The Mat Sinking Unit Requires the Replacement of Its Remaining Absorption Chiller Tubes and Additional Lithium Bromide to the System to Bring the Unit Into Proper Working Condition in Preparation for the 2025 Mat Sinking Season.. https://www.usaspending.gov/award/CONT_AWD_W912EE26PA030_9700_-NONE-_-NONE-/
- W912EE25P0031 (purchase order): $176,371, W07V Endist Vicksburg. Absorption Chiller Tube Replacement. https://www.usaspending.gov/award/CONT_AWD_W912EE25P0031_9700_-NONE-_-NONE-/
- 15B31525P00000136 (purchase order): $140,750, FCC Yazoo City. Installation of Air Cooled Condensers Located in Food Service at FCC Yazoo City Camp Project # 23Z3AJ2 Buy # 1197007. https://www.usaspending.gov/award/CONT_AWD_15B31525P00000136_1540_-NONE-_-NONE-/
- 15B31525P00000097 (purchase order): $24,300, FCC Yazoo City. Replace Cooling Tower Fan Assembly Model# 33758-2RWS Located at the Medium-Usp at FCC Yazoo City Lead Time Is 3-4 Weeks Project 23Z3AJ2. https://www.usaspending.gov/award/CONT_AWD_15B31525P00000097_1540_-NONE-_-NONE-/
- W912EE22P0028 (purchase order): $22,048, W07V Endist Vicksburg. Option Year 3 Services for Annual Repairs and Maintenance for the Carrier Absorption Chiller Located on USACE Mvk'S Power Barge 5014.. https://www.usaspending.gov/award/CONT_AWD_W912EE22P0028_9700_-NONE-_-NONE-/
- 15B31525P00000069 (purchase order): $17,860, FCC Yazoo City. Low I Unicor Chill Water Coil Replacement (Parts & Labor) Project # 25Z3AD8. https://www.usaspending.gov/award/CONT_AWD_15B31525P00000069_1540_-NONE-_-NONE-/
- 1232SA26P0189 (purchase order): $8,100, USDA ARS Afm Apd. Chiller Service Maintenance FY26 W/ 4 Option Years at Building #80. https://www.usaspending.gov/award/CONT_AWD_1232SA26P0189_12H2_-NONE-_-NONE-/
- W912EE25P0004 (purchase order): -$3,600, W07V Endist Vicksburg. Closed - Boiler Tube Repairs. https://www.usaspending.gov/award/CONT_AWD_W912EE25P0004_9700_-NONE-_-NONE-/
- W912EE25P0003 (purchase order): -$9,000, W07V Endist Vicksburg. Boiler Repairs #2. https://www.usaspending.gov/award/CONT_AWD_W912EE25P0003_9700_-NONE-_-NONE-/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://abierto.us/vendors/terry-service-inc-ry6qbrmcj658.
