# Sustainable Group/Terraphase Engineering JV LLC

Canonical: https://abierto.us/vendors/sustainable-group-terraphase-engineering-jv-llc-m8awzelqg948

- UEI: M8AWZELQG948
- CAGE: 6RGQ4
- Location: Moraga, CA
- Awards in window: 15 (36 transactions), $16,468,986 obligated, January 17, 2024 to August 28, 2026

## Awarding agencies

- U.S. Coast Guard: 15 awards, $16,468,986

## Industries

- 236220 Commercial and Institutional Building Construction: $16,468,986

## Competition

- Full and Open Competition After Exclusion of Sources: 15 awards

## Largest awards

- 70Z08826FPETA0001 (delivery order): $5,668,338, Ceu Oakland. Shi Abatement Exterior Siding Housing 305, 306, 331, 416 & 410 (Lead). https://www.usaspending.gov/award/CONT_AWD_70Z08826FPETA0001_7008_70Z08818DPQQ21300_7008/
- 70Z08824FTRAP0002 (delivery order): $3,642,092, Ceu Oakland. Shi Abatement Exterior Siding Housing 413 and 418 (Lead) at U.S. Coast Guard Tracen Petaluma, Ca. https://www.usaspending.gov/award/CONT_AWD_70Z08824FTRAP0002_7008_70Z08818DPQQ21300_7008/
- 70Z08824FOAKL0015 (delivery order): $3,442,257, Ceu Oakland. Replace Aton in Southern California (San Pedro Bay & San Diego Bay) for Ant La/Lb & CG Ant San Diego, Ca. https://www.usaspending.gov/award/CONT_AWD_70Z08824FOAKL0015_7008_70Z08818DPQQ21300_7008/
- 70Z08825FPETA0004 (delivery order): $1,605,181, Ceu Oakland. Maintenance and Repair (M&r) Roadway and Drainage U.S. Coast Guard Station Petaluma, California. https://www.usaspending.gov/award/CONT_AWD_70Z08825FPETA0004_7008_70Z08818DPQQ21300_7008/
- 70Z08826FOAKL0007 (delivery order): $1,028,215, Ceu Oakland. Replace Fuel Tanks, Sta Cape Disappointment for the Demolition, Removal, Recycling, and Disposal of Existing Fuel Tanks and Associated Mechanical Equipment and Piping, Followed by the Installation of New Aboveground Fuel Storage Tank(S). https://www.usaspending.gov/award/CONT_AWD_70Z08826FOAKL0007_7008_70Z08818DPQQ21300_7008/
- 70Z08823FPETA0004 (delivery order): $356,668, Ceu Oakland. Safe House Initiative 301, 308 309, 431, 403 at Tracen Petaluma, Ca.. https://www.usaspending.gov/award/CONT_AWD_70Z08823FPETA0004_7008_70Z08818DPQQ21300_7008/
- 70Z08823FOAKL0004 (delivery order): $284,953, Ceu Oakland. Casrep: Amend - Replace Roofs and Repair Exterior at Station Bodega Bay, Ca and Demolish Gasoline Fueling System at Station Bodega Bay, Ca.. https://www.usaspending.gov/award/CONT_AWD_70Z08823FOAKL0004_7008_70Z08818DPQQ21300_7008/
- 70Z08826FPETA0002 (delivery order): $195,379, Ceu Oakland. Replace Roofs at 414 & 417 at BLDG 414 & 417 at Tracen Petaluma, Ca. https://www.usaspending.gov/award/CONT_AWD_70Z08826FPETA0002_7008_70Z08818DPQQ21300_7008/
- 70Z08822FESDV0004 (delivery order): $168,805, Ceu Oakland. Reconfigure Medical Clinic & Replace Windows, Sector Humboldt Bay, Mckinleyville, Ca. PSN # 6846255. https://www.usaspending.gov/award/CONT_AWD_70Z08822FESDV0004_7008_70Z08818DPQQ21300_7008/
- 70Z08823FOAKL0002 (delivery order): $125,024, Ceu Oakland. Removal Actions at USCG Burrows Island, Anacortes, Wa; PSN-20584866. https://www.usaspending.gov/award/CONT_AWD_70Z08823FOAKL0002_7008_70Z08818DPQQ21300_7008/
- 70Z08822FESDV0040 (delivery order): $0, Ceu Oakland. M&R for Bathrooms & Berthing Mace Hall, at USCG Training Center Petaluma, Ca - Project No. 11742501. https://www.usaspending.gov/award/CONT_AWD_70Z08822FESDV0040_7008_70Z08818DPQQ21300_7008/
- 70Z08823FSANF0001 (delivery order): $0, Ceu Oakland. Repair Slope Stability at Yerba Buena Island, Sector San Francisco, Ca; PSN-14398541. https://www.usaspending.gov/award/CONT_AWD_70Z08823FSANF0001_7008_70Z08818DPQQ21300_7008/
- 70Z08818DPQQ21300: $0, Ceu Oakland. Purpose of This Modification: Bilateral Modification Issued Under the Sole-Source Authority of 10 U.S.C. 3204(A)(1) / FAR 6.302-1 to Extend the Final Optional Ordering Period of the D11/D13 Rmacc II Contracts by Two (2) Years, Changing the Expiration Date from June 27, 2026, to June 27, 2028. This Action Also Increases the Contract'S Cumulative Ceiling by $50,000,000.00, Raising the Total Contract Maximum from $275,000,000.00 to $325,000,000.00, and Incorporates Updated Attachment a Clauses (To Include FAR 52.222-90) Applicable to All Future Task Orders. All Other Terms, Conditions, and Pricing Remain Unchanged.. https://www.usaspending.gov/award/CONT_IDV_70Z08818DPQQ21300_7008/
- 70Z08820FPQQ19300 (delivery order): -$21,454, Ceu Oakland. Closeout of Commercial and Institutional Building Construction.. https://www.usaspending.gov/award/CONT_AWD_70Z08820FPQQ19300_7008_70Z08818DPQQ21300_7008/
- 70Z08822FESDV0001 (delivery order): -$26,473, Ceu Oakland. Emergency Repair to Electrical Compnenets at Marine Village Family Housing, Alameda, Ca.. https://www.usaspending.gov/award/CONT_AWD_70Z08822FESDV0001_7008_70Z08818DPQQ21300_7008/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://abierto.us/vendors/sustainable-group-terraphase-engineering-jv-llc-m8awzelqg948.
