# Stone Ridge Construction, Inc.

Canonical: https://abierto.us/vendors/stone-ridge-construction-inc-jy11mp8cnkd1

- UEI: JY11MP8CNKD1
- CAGE: 6S4J5
- Location: Kingston, ID
- Awards in window: 34 (46 transactions), $7,830,052 obligated, February 14, 2024 to August 12, 2026

## Awarding agencies

- Forest Service: 34 awards, $7,830,052

## Industries

- 237310 Highway, Street, and Bridge Construction: $7,830,052
- 115310 Support Activities for Forestry: $0

## Competition

- Full and Open Competition After Exclusion of Sources: 32 awards
- Competed Under SAP: 2 awards

## Largest awards

- 1240LU26F0003 (delivery order): $1,044,541, Usda-Fs, Csa Intermountain 9. Stormin' Norman Road Construction and Reconstruction Task Order - TS Which Is a Good Neighbor Authority Timber Sale Within the Kootenai Wildfire Crisis Strategy Area.. https://www.usaspending.gov/award/CONT_AWD_1240LU26F0003_12C2_1240LU25D0001_12C2/
- 1240LU26F0040 (delivery order): $682,320, Usda-Fs, Csa Intermountain 9. Topr for Moose Creek Fish Barrier on the Flathead National Forest Construct Cast-In-Place Concrete Fish Barrier. https://www.usaspending.gov/award/CONT_AWD_1240LU26F0040_12C2_1240LU25D0001_12C2/
- 1240LU24F0039 (delivery order): $647,266, Usda-Fs, Csa Intermountain 9. Gaoa Trail Construction and Bridge Contruction on the Ross Creek Trail of the Three Rivers Ranger District.. https://www.usaspending.gov/award/CONT_AWD_1240LU24F0039_12C2_12034319D0031_12C2/
- 1240LU25F0040 (delivery order): $576,038, Usda-Fs, Csa Intermountain 9. Ruby Creek Bridges Replacement on the Wisdom Ranger District of the BDNF This Project Replaces Two Structurally Deficient and Load Posted Bridges. the Crossings Are Located NFSR 624 at Milepost 4.4 and Milepost 5.4, Respectively. All Terms, Conditi. https://www.usaspending.gov/award/CONT_AWD_1240LU25F0040_12C2_1240LU25D0001_12C2/
- 1240LU24F0065 (delivery order): $532,127, Usda-Fs, Csa Intermountain 9. Lost Creek Aop Culvert Replacement 5.77 and 5.99.. https://www.usaspending.gov/award/CONT_AWD_1240LU24F0065_12C2_12034319D0031_12C2/
- 1240LU25F0033 (delivery order): $465,165, Usda-Fs, Csa Intermountain 9. Bil Project: Stark-Cromwell Culvert Replacements. Replacement of Three Deteriorating Undersized Culverts with Structures That Allow for Aquatic Organism Passage (Aop). Structures Included: 2 Bottomless Arch Culverts, 1 Large Round Corrugated Metal Pi. https://www.usaspending.gov/award/CONT_AWD_1240LU25F0033_12C2_1240LU25D0001_12C2/
- 1240LU24F0080 (delivery order): $441,975, Usda-Fs, Csa Intermountain 9. 2 New Aops on Clemmer Gulch. Replacement of Two Under-Sized Culverts on Telegraph Road 495 (Mp 4.78 & 5.4) to Aops. Items Awarded Described Below: M.P 4.78 - Base M.P 4.78 - Option Item 1 M.P 4.78 - Option Item 2 M.P 5.35 - Base Price. https://www.usaspending.gov/award/CONT_AWD_1240LU24F0080_12C2_12034319D0031_12C2/
- 1240LU26F0077 (delivery order): $439,243, Usda-Fs, Csa Intermountain 9. Hiawatha Access Road Reconditioning and Surfacing Project. Task Order to R1 Roads & Bridge Matoc 1240LU24R0011. https://www.usaspending.gov/award/CONT_AWD_1240LU26F0077_12C2_1240LU25D0001_12C2/
- 1240LU26F0061 (delivery order): $382,605, Usda-Fs, Csa Intermountain 9. Replace Aging Treated Timber Bridge with New Concrete Bridge. https://www.usaspending.gov/award/CONT_AWD_1240LU26F0061_12C2_1240LU25D0001_12C2/
- 1240LU26F0064 (delivery order): $305,888, Usda-Fs, Csa Intermountain 9. This Project Replaces an Aging Timber Bridge on NFSR 187 at Mile Post 1.9 with a New Steel Girder Bridge Founded on Reinforced Concrete Grade Beam. Iija. https://www.usaspending.gov/award/CONT_AWD_1240LU26F0064_12C2_1240LU25D0001_12C2/
- 1240LU26F0094 (delivery order): $268,939, Usda-Fs, Csa Intermountain 9. Emergency Road Repairs to NFSR 889 and NFSR 236, Lolo Nf.. https://www.usaspending.gov/award/CONT_AWD_1240LU26F0094_12C2_1240LU25D0001_12C2/
- 1240LU25F0062 (delivery order): $228,160, Usda-Fs, Csa Intermountain 9. Flathead NF Gaoa FNF 38-35.235 SF Logan Creek Culvert. https://www.usaspending.gov/award/CONT_AWD_1240LU25F0062_12C2_1240LU25D0001_12C2/
- 1240LU24F0036 (delivery order): $219,921, Usda-Fs, Csa Intermountain 9. Construction of an Aquatic Organism Passage (Aop) in Beartrap Creek, Located in Lewis and Clark County, Montana, on the Lincoln Ranger District.. https://www.usaspending.gov/award/CONT_AWD_1240LU24F0036_12C2_12034319D0031_12C2/
- 1240LU26F0051 (delivery order): $217,305, Usda-Fs, Csa Intermountain 9. Welch-Gillispie Reconstruction. https://www.usaspending.gov/award/CONT_AWD_1240LU26F0051_12C2_1240LU25D0001_12C2/
- 1240LU24F0043 (delivery order): $194,489, Usda-Fs, Csa Intermountain 9. Marshall Woods Decommissioning. https://www.usaspending.gov/award/CONT_AWD_1240LU24F0043_12C2_12034319D0031_12C2/
- 1240LU26F0036 (delivery order): $170,181, Usda-Fs, Csa Intermountain 9. Task Order Under R1 Road & Bridge Matoc for St. Joe Road Repairs and Maintenance Base Item Work Includes Selective Clearing (Roadside Brush Cutting), Road Reconditioning, Cleaning Ditches, Cleaning Culverts, Installing and Maintaining Drain Dip. https://www.usaspending.gov/award/CONT_AWD_1240LU26F0036_12C2_1240LU25D0001_12C2/
- 12363N25F4140 (bpa call): $144,222, Usda-Fs, Stewardship Contracting Branch. Washout Road Repair. https://www.usaspending.gov/award/CONT_AWD_12363N25F4140_12C2_12363N23A4557_12C2/
- 1240LU24F0067 (delivery order): $142,618, Usda-Fs, Csa Intermountain 9. Red Meadow & Moose Creek Culvert Replacements. https://www.usaspending.gov/award/CONT_AWD_1240LU24F0067_12C2_12034319D0031_12C2/
- 1240LU24F0047 (delivery order): $126,280, Usda-Fs, Csa Intermountain 9. Furnish and Apply Dust Palliative to Route of Hiawatha Travel Routes. https://www.usaspending.gov/award/CONT_AWD_1240LU24F0047_12C2_12034319D0031_12C2/
- 1240LU25F0039 (delivery order): $116,714, Usda-Fs, Csa Intermountain 9. Miller Peak Baer. https://www.usaspending.gov/award/CONT_AWD_1240LU25F0039_12C2_1240LU25D0001_12C2/
- 1240LU24F0090 (delivery order): $113,390, Usda-Fs, Csa Intermountain 9. 2024 Matoc Task Order for Central Zone Road Maintenance. https://www.usaspending.gov/award/CONT_AWD_1240LU24F0090_12C2_12034319D0031_12C2/
- 1240LU24F0085 (delivery order): $110,705, Usda-Fs, Csa Intermountain 9. During Excavation of the Septic Tank, the Lines Were Discovered to Be Needing Replaced as Soon as Possible. During Excavation, a Temporary Repair Was Placed Between the Tank and the Lines. Due to the Amount of Excavation Needed for the Lines, Asphalt. https://www.usaspending.gov/award/CONT_AWD_1240LU24F0085_12C2_12034319D0031_12C2/
- 1240LU25F0001 (delivery order): $109,885, Usda-Fs, Csa Intermountain 9. Brush Creek Curve Widening. https://www.usaspending.gov/award/CONT_AWD_1240LU25F0001_12C2_1240LU25D0001_12C2/
- 1282B122F0053 (delivery order): $104,589, USDA Forest Service-Spoc Im. The Purpose of This Modification Is to Direct: 1. Clean-Up of Raveling Failed Cut Slopes 13+50 32+00. 2. Placement of Riprap at a Fill Failure. 3. Roadway Reconditioning of 1.7 Miles from County Bridge to Beginning of New Project Prior to Placemen. https://www.usaspending.gov/award/CONT_AWD_1282B122F0053_12C2_12034319D0031_12C2/
- 1240BD26F0016 (delivery order): $45,000, Usda-Fs, Csa Northwest 2. Road Maintenance, Bonners Ferry Brushing. https://www.usaspending.gov/award/CONT_AWD_1240BD26F0016_12C2_1240LQ25D0041_12C2/
- 1240LQ26F0019 (delivery order): $500, Usda-Fs, Csa Intermountain 5. Efficient Contract Vehicle to Accomplish Road Maintenance in Region 1 Guarantee Minimum. https://www.usaspending.gov/award/CONT_AWD_1240LQ26F0019_12C2_1240LQ25D0041_12C2/
- 1240LU22F0132 (delivery order): $0, Usda-Fs, Csa Intermountain 9. Little Joe Bridge. https://www.usaspending.gov/award/CONT_AWD_1240LU22F0132_12C2_12034319D0031_12C2/
- 1240LU23F0065 (delivery order): $0, Usda-Fs, Csa Intermountain 9. Road Maintenance and Construction. https://www.usaspending.gov/award/CONT_AWD_1240LU23F0065_12C2_12034319D0031_12C2/
- 1282B123F0146 (delivery order): $0, USDA Forest Service-Spoc Im. Remove Temporary Bridge and Install with a New Steel Bridge. https://www.usaspending.gov/award/CONT_AWD_1282B123F0146_12C2_12034319D0031_12C2/
- 12034319D0031: $0, Usda-Fs, Csa Intermountain 9. Modification 0008 Hereby Exercises a 6-Month Extension on Final Option Period. New Performance Period Is September 20, 2024 to March 19, 2025. All Other Terms and Conditions Remain the Same.. https://www.usaspending.gov/award/CONT_IDV_12034319D0031_12C2/
- 1240LQ25D0041: $0, Usda-Fs, Csa Intermountain 5. Region 1 Road Maintenance and Forest Maintenance/Support Services. https://www.usaspending.gov/award/CONT_IDV_1240LQ25D0041_12C2/
- 1240LU25D0001: $0, Usda-Fs, Csa Intermountain 9. Usfs, Region 1, Road and Bridge Construction Matoc. https://www.usaspending.gov/award/CONT_IDV_1240LU25D0001_12C2/
- 1284LL23D0006: $0, Usda-Fs, Csa Intermountain 1. The Purpose of This Modification Is to Incorporate the Mandatory Contract Clause FAR 52.222 90, Addressing Dei Discrimination by Federal Contractors, as Required by Executive Order 14398.. https://www.usaspending.gov/award/CONT_IDV_1284LL23D0006_12C2/
- 1240LU22F0081 (delivery order): -$12, Usda-Fs, Csa Intermountain 9. The Intent of This Item Is to Recondition and Install BMPS on the Roads in the Thorne Creek Fire Area. the Location Is Accessible May - October. the Work Associated with This Project Includes But Is Not Limited to Constructing Road Drainage Structure. https://www.usaspending.gov/award/CONT_AWD_1240LU22F0081_12C2_12034319D0031_12C2/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://abierto.us/vendors/stone-ridge-construction-inc-jy11mp8cnkd1.
