# Spees-Hernandez JV LLC

Canonical: https://abierto.us/vendors/spees-hernandez-jv-llc-pdm8hjk3knb3

- UEI: PDM8HJK3KNB3
- CAGE: 85FA6
- Location: Seattle, WA
- Awards in window: 8 (40 transactions), -$15,940,326 obligated, January 10, 2024 to July 17, 2026

## Awarding agencies

- U.S. Fish and Wildlife Service: 1 awards, $0
- Department of Veterans Affairs: 7 awards, -$15,940,326

## Industries

- 332311 Prefabricated Metal Building and Component Manufacturing: $857,829
- 238910 Site Preparation Contractors: $258,154
- 238990 All Other Specialty Trade Contractors: $21,548
- 236220 Commercial and Institutional Building Construction: -$17,077,857

## Competition

- Full and Open Competition After Exclusion of Sources: 7 awards
- Competed Under SAP: 1 awards

## Largest awards

- 36C24821C0021 (definitive contract): $857,829, 248-Network Contract Office 8. Site Preparation and Install Temp Kitchen. Modification P00004 Is Rea Due to Severe Weather.. https://www.usaspending.gov/award/CONT_AWD_36C24821C0021_3600_-NONE-_-NONE-/
- 36C24622C0033 (definitive contract): $748,225, 246-Network Contracting Office 6. Expand D Wing Building 1 Construction. https://www.usaspending.gov/award/CONT_AWD_36C24622C0033_3600_-NONE-_-NONE-/
- 36C77622C0047 (definitive contract): $439,801, Pcac. Electronic Health Record Modernization - Infrastructure Upgrades - Design-Build. https://www.usaspending.gov/award/CONT_AWD_36C77622C0047_3600_-NONE-_-NONE-/
- 36C10F21C0001 (definitive contract): $258,154, Office of Construction & Facilities MGMT. A00081 (SA-A00081) Lower Sump Pump Electric. https://www.usaspending.gov/award/CONT_AWD_36C10F21C0001_3600_-NONE-_-NONE-/
- 36C25621C0063 (definitive contract): $41,377, 256-Network Contract Office 16. Usp 800 Pharmacy Remodel Nola. https://www.usaspending.gov/award/CONT_AWD_36C25621C0063_3600_-NONE-_-NONE-/
- 36C24624P0630 (purchase order): $21,548, 246-Network Contracting Office 6. Repair Ramsey Street Fence. https://www.usaspending.gov/award/CONT_AWD_36C24624P0630_3600_-NONE-_-NONE-/
- 140F0822D0114: $0, Fws, Gaoa. Mod 3: the Purpose of This Modification Is to Ensure Compliance with Updated Federal Guidance and to Eliminate Non-Statutory Sustainability Requirements, as Well as Enhance the Representational and Certification Clauses Within the Contract.. https://www.usaspending.gov/award/CONT_IDV_140F0822D0114_1448/
- 36C77622C0038 (definitive contract): -$18,307,260, Pcac. The Purpose of This Project Is to Upgrade the Ehrm Infrastructure at Menlo Park Vamc Through Design Build Construction Services.. https://www.usaspending.gov/award/CONT_AWD_36C77622C0038_3600_-NONE-_-NONE-/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://abierto.us/vendors/spees-hernandez-jv-llc-pdm8hjk3knb3.
