# Southwest Research Institute

Canonical: https://abierto.us/vendors/southwest-research-institute-pb11v1kh3kv4

- UEI: PB11V1KH3KV4
- CAGE: 26401
- Location: San Antonio, TX
- Awards in window: 397 (1,297 transactions), $610,771,048 obligated, January 1, 2024 to September 8, 2026

## Awarding agencies

- National Aeronautics and Space Administration: 35 awards, $247,592,687
- Department of the Air Force: 92 awards, $176,485,639
- Defense Threat Reduction Agency: 18 awards, $64,671,655
- Department of the Navy: 49 awards, $35,460,010
- Defense Advanced Research Projects Agency: 2 awards, $29,563,384
- Department of Energy: 8 awards, $26,941,902
- Nuclear Regulatory Commission: 88 awards, $9,921,872
- Defense Logistics Agency: 10 awards, $8,379,194
- Department of the Army: 17 awards, $6,931,610
- Environmental Protection Agency: 17 awards, $2,243,144
- Immediate Office of the Secretary of Transportation: 3 awards, $1,337,895
- Bureau of Engraving and Printing: 2 awards, $868,542
- Federal Railroad Administration: 3 awards, $330,857
- Federal Highway Administration: 1 awards, $258,903
- National Highway Traffic Safety Administration: 13 awards, $232,459

## Industries

- 541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology): $258,717,683
- 541330 Engineering Services: $122,753,370
- 336414 Guided Missile and Space Vehicle Manufacturing: $121,144,085
- 334111 Electronic Computer Manufacturing: $26,829,059
- 541710 Professional, Scientific, and Technical Services: $24,748,942
- 541611 Administrative Management and General Management Consulting Services: $15,185,083
- 334220 Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing: $7,617,247
- 334519 Other Measuring and Controlling Device Manufacturing: $5,404,947
- 541712 Professional, Scientific, and Technical Services: $4,823,147
- 541512 Computer Systems Design Services: $4,257,653
- 334511 Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing: $3,962,502
- 334412 Bare Printed Circuit Board Manufacturing: $3,213,362
- 336419 Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing: $2,835,434
- 334516 Analytical Laboratory Instrument Manufacturing: $2,772,763
- 811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance: $2,749,593

## Competition

- Full and Open Competition: 173 awards
- Not Competed: 172 awards
- Not Competed Under SAP: 27 awards
- Not Available for Competition: 14 awards
- Competed Under SAP: 11 awards

## Solicitations won

- Operation of the Center for Nuclear Waste Regulatory Analyses as the NRC’s Federally Funded Research and Development Center-Seventh Renewal (31310023D0004P00012). https://abierto.us/opportunities/31310023d0004p00012
- Enterprise Wide Contract for the Center for Nuclear Waste Regulatory Analyses Work-For-Others Technical Assistance and Research Support of Activities under the Responsibility of the Nuclear Regulatory Commission's (NRC) Program Offices (31310023D0005P00011). https://abierto.us/opportunities/31310023d0005p00011
- Automatic Engine Start Stop (AESS) continuation and Air Leak Fuel Penalty Study (FR26RDI20000000033). https://abierto.us/opportunities/fr26rdi20000000033
- Structural Materials Open BAA (FA8650-18-S-5010). https://abierto.us/opportunities/fa865018s5010
- Numerical Propulsion System Simulation (NPSS) Consortium Support FY26 (80NSSC26928393Q). https://abierto.us/opportunities/80nssc26928393q
- I-PREDICT Human Body Modeling Services (N0016726Q1034). https://abierto.us/opportunities/n0016726q1034
- SENSOR INTERATION UNIT (SIU) (FA823225DB012), $9,700,000. https://abierto.us/opportunities/fa823225db012
- Repair of Mini-Mutes Circuit Card Assembly (FA825026Q0035). https://abierto.us/opportunities/fa825026q0035
- ANTENNA (SPRMM125RHA57), $1,766,325. https://abierto.us/opportunities/sprmm125rha57
- Radiochemical Sample Analaysis for Decommissioning (31310025R0027), $188,915. https://abierto.us/opportunities/31310025r0027
- Super Dialer J&A (N39430-25-D-0005). https://abierto.us/opportunities/n3943025d0005
- Indicator (SPRHA5-25-R-0484), $1,292,553. https://abierto.us/opportunities/sprha525r0484

## Largest awards

- 80GSFC25CA023 (definitive contract): $37,800,000, NASA Goddard Space Flight Center. Space Weather Coronagraph - Efforts Include Integrate, Test, Calibrate, Evaluate, and Support Launch and ON-ORBIT Check-Out of the Coronagraph Instruments.. https://www.usaspending.gov/award/CONT_AWD_80GSFC25CA023_8000_-NONE-_-NONE-/
- 80GSFC24F0001 (delivery order): $35,645,895, NASA Goddard Space Flight Center. Development of the Quicksounder Spacecraft, Including Integration of the Atms Edu(2)shipment to the Launch Site(3)support of Launch Operations and Satellite Activation (4)conduct 3 Years of Mission Operations And(5)perform Decommissioning Operation.. https://www.usaspending.gov/award/CONT_AWD_80GSFC24F0001_8000_80GSFC20D0021_8000/
- NNG04EB99C (definitive contract): $30,709,000, NASA Goddard Space Flight Center. As the Principal Investigator (Pi) Institution for the Magnetospheric Multiscale (Mms) Instrument Suite Science Team (Isst), the Contractor Is Responsible for Leading the Solving Magnetospheric Acceleration Reconnection and Turbulence (Smart) Team Through All Mission Phases. the Scope of Work Shall Include, But Not Be Limited, to the Following: - Manage the Smart Team Through Phases B Through E of the MMS Mission, - Defining Science Goals and Objectives - Assist the MMS Project and HQ Science Mission Directorate Heliophysics Division in the Preparation of Level 1 Requirements for the MMS Mission - Flow-Down of TOP-LEVEL Mission Requirements to the Appropriate Elements of the Instrument Suite - Design, Fabrication, Integration, Calibration, Testing and Delivery of Four Fully Qualified, Flight Instrument Suites to Observatory Integration and Test (I&t) Plus Spares - Design, Development, Integration and Testing of the Soc - Support Observatory-Level I&t Activities - Provide Sustaining Engineering and I&t Support of the Instrument Suites After Delivery to NASA - Responsibility for the ON-ORBIT Operation, Health and Safety of the Instrument Suites - Responsibility for Operating and Maintaining the Soc Post-Launch - Establishing and Managing Subcontracts with Instrument Suite Team Members - Establishing and Maintaining the Required International Traffic in Arms Regulations (Itar) and Export Control Documentation Necessary for Working with Its International Team Members - Implementation of an Epo Program for the MMS Mission.. https://www.usaspending.gov/award/CONT_AWD_NNG04EB99C_8000_-NONE-_-NONE-/
- NNM16AA08C (definitive contract): $28,468,916, NASA Marshall Space Flight Center. Lucy Is a Planned NASA Space Probe That Will Tour Five Jupiter Trojans, Asteroids Which Share Jupiter'S Orbit Around the Sun, Orbiting Either Ahead of or Behind the Planet and One Main Belt Asteroid. All Target Encounters Will Be FLY-BY Encounters.. https://www.usaspending.gov/award/CONT_AWD_NNM16AA08C_8000_-NONE-_-NONE-/
- HR001123C0116 (definitive contract): $26,288,809, Def Advanced Research Projects Agcy. DARPA Research Project. https://www.usaspending.gov/award/CONT_AWD_HR001123C0116_9700_-NONE-_-NONE-/
- 80GSFC24CA041 (definitive contract): $22,722,115, NASA Goddard Space Flight Center. Joint Euv Coronal Diagnostic Investigation (Jedi) Effort. Phase a Work Includes Instrument Requirements Definition, Instrument Management, System Engineering, Instrument Safety & Mission Assurance, and System Integration Planning.. https://www.usaspending.gov/award/CONT_AWD_80GSFC24CA041_8000_-NONE-_-NONE-/
- 80GSFC18C0014 (definitive contract): $22,079,309, NASA Goddard Space Flight Center. Under This Contract, the Contractor Will Provide the Personnel, Materials, Equipment, and Facilities Necessary to Produce the Polarimeter to Unify the Corona Heliosphere (Punch) Phase a Concept Study..The Scope of This Effort Includes, But Is Not Limited TO:.1. Principal Investigator Program Office.2. Instrument System Engineering, Including Instrument Mission Assurance.3. Design of a Flight Qualified Punch Instrument Meeting Mission and Science Requirements.4. Develop Plans in Support of Integration and Test of the Punch Instrument Flight System.5. Develop Plans in Support of Essential Field Operations.6. Develop Plans in Support of Launch Operations and Flight Operations.7. Develop Plans for Lead the Punch Science Investigation as Well as the Generation of Resulting Data Products.The Contractor Shall Provide a Briefing on the Punch Science and Science Implementation Plan at the Phase a Site Visit. the Contractor Shall Provide an Organization Chart Defining Contractor Roles and Responsibilities, Reporting Procedures, and All Lines of Authority. the Contractor Shall Participate in Defining the Relationships Between the Contractor'S Program Office and the NASA Explorers Program Office. the Contractor Shall Develop a Punch Instrument Systems Requirements Document and a Punch Mission Systems Requirements Document. the Contractor Will Also Develop Detailed Block Diagrams and Technical Descriptions of All Instrument Systems. the Contractor Will Conduct IN-DEPTH Instrument-Level Reviews of the Proposed Instrument Design. They Will Conduct Essential Trade Studies, Analyses, Modeling and Simulations to Assure Compliance with Instrument Requirements. the Contractor Will Lead the Science Team and Develop an Instrument-Level Test Plan and Participate in Planning for Integration and Test. the Contractor Shall Prepare a Detailed Instrument Development Schedule Covering All Mission Phases, Listing Major Milestones, Including a Defined Critical Path and Schedule Reserves. the Contractor Will Prepare Updated Instrument Budgets as Well as Review and Approve the Overall Punch Budget. Finally, the Contractor Shall Prepare and Submit the Concept Study Report.. https://www.usaspending.gov/award/CONT_AWD_80GSFC18C0014_8000_-NONE-_-NONE-/
- NNM06AA75C (definitive contract): $19,404,576, NASA Marshall Space Flight Center. The National Aeronautics and Space Administration Has Selected Juno New Frontiers Mission Under the Direction of Principal Investigator (Pi) Dr. Scott Bolton to Continue Development with the Expectation That the Juno Mission Will Enter Phase B in Early Fiscal Year 2006. the Juno Mission Will Be Managed by the Marshall Space Flight Center, New Frontiers Program Office. Key Juno Team Members Include Dr. Bolton'S Home Institution, the Southwest Research Institute (Swri), the Juno Implementation Team Leader Jet Propulsion Laboratory (Jpl) and the Spacecraft Bus Provider the Lockheed Martin Space Systems Division (Lm/Ss). the Pi'S Team at Swri Needs to Begin Work on a Subset of Phase B Activities as Early in FY06 as Possible. This Sow Provides a List of Activities That Are Necessary to Begin Work in FY06 and Their Associated Deliverables. the Juno Mission Is a Collaboration Between Southwest Research Institute (Swri), Jpl, Lockheed Martin (Lm), and a Complementary Team of Universities and Field Centers. the Principal Investigator, Dr. Scott Bolton, Is at Southwest Research Institute (Swri) and Is Responsible to NASA for All Aspects of the Mission Including Achieving All Scientific Objectives and Mission Goals. JPL Provides the Project Manager Who Oversees the DAY-TO-DAY Management of the Project and Will Report to the Pi. Principal Investigator (Pi) Dr. Scott Bolton Is Responsible to NASA for Meeting the Scientific Objectives of the Juno Mission Within Cost and Schedule. as Pi, Dr. Bolton Has Direct Accountability to the NASA New Frontiers Program Office for the Implementation of Juno. All Juno Science Co-Is, the Deputy Pi and Project Scientist, the Science Investigation Office Manager, the E/Po Effort, the Juno Advisory Board and the PM Report Directly to Dr. Bolton. the Pi Delegates the DAY-TO-DAY Management of the Project to the Project Manager (Pm), Rick Grammier. the Project System Engineer, Payload Manager, Flight System Manager, Mission Manager, Science Ops Center, Business Manager, LM Contract Ctm, and Mission Assurance Manager All Report Directly to the Pm.. https://www.usaspending.gov/award/CONT_AWD_NNM06AA75C_8000_-NONE-_-NONE-/
- FA807521F0009 (delivery order): $17,019,530, FA8075 774 Ess. Research, Development, Test, Evaluation and Production Engineering of Special Operations Forces-Peculiar Dismounted Maneuver and Engagement Technologies for Joint Special Operations Command Naval Surface Warfare Center, Crane Specialized Munitions. https://www.usaspending.gov/award/CONT_AWD_FA807521F0009_9700_FA807518D0013_9700/
- FA821024C0001 (definitive contract): $16,835,703, FA8210 AFLCMC WNRK Hill. Production of the Reengineered Multiple Threat Emitter System (Mutes) Control Processor (Mcp) / Remote Emitter Unit (Reu) Control Processor (Rcp). https://www.usaspending.gov/award/CONT_AWD_FA821024C0001_9700_-NONE-_-NONE-/
- HDTRA224F0002 (delivery order): $15,319,351, Defense Threat Reduction Agency. Engineering Services. https://www.usaspending.gov/award/CONT_AWD_HDTRA224F0002_9700_HDTRA118D0002_9700/
- 89233124CNA000374 (definitive contract): $15,178,669, NNSA NON-MO Cntrctng Ops Div. Apex Development, Design, Fabrication, Testing and Installation for the Office of Defense Nuclear Nonproliferation. https://www.usaspending.gov/award/CONT_AWD_89233124CNA000374_8900_-NONE-_-NONE-/
- N6523624C8003 (definitive contract): $15,152,513, NIWC Atlantic. The Purpose of P00001 Is to Add Incremental Funding.. https://www.usaspending.gov/award/CONT_AWD_N6523624C8003_9700_-NONE-_-NONE-/
- FA700024F0120 (delivery order): $14,348,595, FA7000 10 Cons LGC. The Center for Aircraft Structural Life Extension (Castle) at the United States Air Force Academy Requires Research and Development Engineering Support for the A10 and Similar Aging Weapon Systems.. https://www.usaspending.gov/award/CONT_AWD_FA700024F0120_9700_FA700021D0002_9700/
- FA700025F0078 (delivery order): $13,636,118, FA7000 10 Cons LGC. FY25 A-10 Asip Support. This Task Order Is a Placeholder to Meet Daffars 5315.504(A)(2) and Will Be Modified to Incorporate the A-10 Asip Support Requirement Later This Fy.. https://www.usaspending.gov/award/CONT_AWD_FA700025F0078_9700_FA700025D0016_9700/
- FA239423CB007 (definitive contract): $13,499,937, FA2394 USAF AFMC AFRL PZL AFRL RXKM. Research and Development: Hypersonics Supply Chain Research. https://www.usaspending.gov/award/CONT_AWD_FA239423CB007_9700_-NONE-_-NONE-/
- HDTRA124F0021 (delivery order): $12,995,206, Defense Threat Reduction Agency. Engineering, Test, and Evaluation - Project Ares. https://www.usaspending.gov/award/CONT_AWD_HDTRA124F0021_9700_HDTRA118D0002_9700/
- HQTR0200204DNASW02008 (definitive contract): $10,791,989, NASA Marshall Space Flight Center. The Discovery, New Frontiers and Lunar Quest Program Office This Is Funding for New Horizons. https://www.usaspending.gov/award/CONT_AWD_HQTR0200204DNASW02008_8000_-NONE-_-NONE-/
- 80GSFC25CA025 (definitive contract): $10,563,683, NASA Goddard Space Flight Center. Design, Analyze, Develop, Fabricate, Integrate, Test, Verify, Evaluate, Support Launch, Supply and Maintain the Instrument Ground Support Equipment (Gse), and Support Mission Operations at Nosf.. https://www.usaspending.gov/award/CONT_AWD_80GSFC25CA025_8000_-NONE-_-NONE-/
- FA807521F0063 (delivery order): $10,051,048, FA8075 774 Ess. Autonomous and Robotic Vehicles U.S. Army Combat Capabilities Development Command Ground Vehicle Systems Center. https://www.usaspending.gov/award/CONT_AWD_FA807521F0063_9700_FA807518D0013_9700/
- FA823225FB248 (delivery order): $9,993,356, FA8232 AFLCMC WWMK. Production Hardware Required to Support the Rfc/Siu Program for the F-16 Block 25/30/32/40/42/50/52 C and D Model Aircraft During the Period of the Contract.. https://www.usaspending.gov/award/CONT_AWD_FA823225FB248_9700_FA823225DB012_9700/
- HDTRA124F0029 (delivery order): $9,742,570, Defense Threat Reduction Agency. Alternate Signatures and Multi-Mission, Modular Unmanned Payload.. https://www.usaspending.gov/award/CONT_AWD_HDTRA124F0029_9700_HDTRA118D0002_9700/
- FA700024F0098 (delivery order): $8,661,178, FA7000 10 Cons LGC. T-38 Flight Loads Data Recording (Fldr), Aircraft Structural Integrity Program (Asip) Improvements, and Miscellaneous Studies. https://www.usaspending.gov/award/CONT_AWD_FA700024F0098_9700_FA700021D0002_9700/
- FA820325F0027 (delivery order): $8,571,803, FA8203 AFSC Pzaab. F-16 Clgip Analysis. https://www.usaspending.gov/award/CONT_AWD_FA820325F0027_9700_FA820321D0012_9700/
- FA852322F0031 (delivery order): $8,211,490, FA8523 Afmc/Aflcmc Esyc. An/Alq-131 and An/Alq-184 Engineering Services. https://www.usaspending.gov/award/CONT_AWD_FA852322F0031_9700_FA852321D0007_9700/
- HDTRA123F0009 (delivery order): $8,073,667, Defense Threat Reduction Agency. Engineering Services. https://www.usaspending.gov/award/CONT_AWD_HDTRA123F0009_9700_HDTRA118D0002_9700/
- FA852322F0038 (delivery order): $8,025,059, FA8523 Afmc/Aflcmc Esyc. An/Alq-184 Engineering Services. https://www.usaspending.gov/award/CONT_AWD_FA852322F0038_9700_FA852321D0007_9700/
- FA852325FB061 (delivery order): $6,299,963, FA8523 Afmc/Aflcmc Esyc. Engineering Services - This Effort Supports Development of Cutting-Edge Cognitive Electronic Warfare Systems for the Purpose of Increased US Aircrew Survivability and Mission Effectiveness.. https://www.usaspending.gov/award/CONT_AWD_FA852325FB061_9700_FA852321D0007_9700/
- FA700025F0107 (delivery order): $6,182,603, FA7000 10 Cons LGC. Castle at Usafa and the T-38 Program Office (Po) Requires Contractor Support to Perform Multiple Aircraft Structural Integrity Program (Asip)-Related Tasks for Structural Sustainment and Structural Sustainment Research.. https://www.usaspending.gov/award/CONT_AWD_FA700025F0107_9700_FA700025D0016_9700/
- 89233120CNA000127 (definitive contract): $5,820,139, NNSA NON-MO Cntrctng Ops Div. Test-Article Assembly, Operations, and Sustainment. https://www.usaspending.gov/award/CONT_AWD_89233120CNA000127_8900_-NONE-_-NONE-/
- NNM09AA24C (definitive contract): $5,412,420, NASA Marshall Space Flight Center. Strofio - Phase B Is Awarded from Announcement of Opportunity (Ao) Nnm08zda009o, Stand Alone Mission of Opportunity Notice (Salmon) Issued by NASA Headquarters.. https://www.usaspending.gov/award/CONT_AWD_NNM09AA24C_8000_-NONE-_-NONE-/
- NNG05EC87C (definitive contract): $5,344,366, NASA Goddard Space Flight Center. Lunar Reconnaissance Obiter Measurement Investigation Phases A/B and Bridge Phase. https://www.usaspending.gov/award/CONT_AWD_NNG05EC87C_8000_-NONE-_-NONE-/
- N0001425C1302 (definitive contract): $4,970,412, Office of Naval Research. Ship-Board Battery Containment Design and Test Validation. https://www.usaspending.gov/award/CONT_AWD_N0001425C1302_9700_-NONE-_-NONE-/
- W56HZV21C0077 (definitive contract): $4,840,111, W4GG HQ US Army TACOM. WD 025, 026, and 017 Revision 001 Are All Established. Period of Performance Is Updated on WD 017 and WD 015 Slins. WD 008 Slins Funding Is Realigned and DFAS Billing Is Revised in Section G.. https://www.usaspending.gov/award/CONT_AWD_W56HZV21C0077_9700_-NONE-_-NONE-/
- 80GSFC20C0102 (definitive contract): $4,590,718, NASA Goddard Space Flight Center. The Principal Purpose of This Requirement Within the Swfo Project Is to Design, Analyze, Develop, Fabricate, Integrate, Test, Calibrate, Evaluate and Support Launch and ON-ORBIT Check-Out of the Swips Instrument as Part of the Swfo-L1 Observatory.. https://www.usaspending.gov/award/CONT_AWD_80GSFC20C0102_8000_-NONE-_-NONE-/
- 89303022FET400026 (delivery order): $4,399,797, Headquarters Procurement Services. Contract Modification P00006 Obligates Incremental Funding in the Amount of $100,000.00 for Contract Line Item 00002. https://www.usaspending.gov/award/CONT_AWD_89303022FET400026_8900_89303019DET000001_8900/
- HDTRA124F0024 (delivery order): $3,880,735, Defense Threat Reduction Agency. Research, Development Test and Evaluation of Test Articles. https://www.usaspending.gov/award/CONT_AWD_HDTRA124F0024_9700_HDTRA118D0002_9700/
- FA700025F0112 (delivery order): $3,826,409, FA7000 10 Cons LGC. Center for Aircraft Structural Life Extension (Castle) Af Product Lifecycle Management (Plm) Support.. https://www.usaspending.gov/award/CONT_AWD_FA700025F0112_9700_FA700025D0016_9700/
- HDTRA125FE013 (delivery order): $3,765,081, Defense Threat Reduction Agency. The Purpose for This Requirement Is to Provide Engineering and Technical Support to Procure, Design, Develop and Host Test Articles That Will Aide in the Verification and Validation of Research and Development Capabilities for Project Siren.. https://www.usaspending.gov/award/CONT_AWD_HDTRA125FE013_9700_HDTRA118D0002_9700/
- FA700024F0129 (delivery order): $3,493,751, FA7000 10 Cons LGC. The Purpose of This Effort Is to Obtain Support in Understanding, Utilizing and Potentially Adding to the Mission Data Recorder (Mdr) System for the B-52 Aircraft Structure and Integrity Program.. https://www.usaspending.gov/award/CONT_AWD_FA700024F0129_9700_FA700021D0002_9700/
- HR001125C0011 (definitive contract): $3,274,575, Def Advanced Research Projects Agcy. Structures Uniquely Resolved to Guarantee Endurance(Surge) Phase I. https://www.usaspending.gov/award/CONT_AWD_HR001125C0011_9700_-NONE-_-NONE-/
- N6523624F0412 (delivery order): $3,175,382, NIWC Atlantic. Various Antennas. https://www.usaspending.gov/award/CONT_AWD_N6523624F0412_9700_N6523624D1013_9700/
- HDTRA121F0020 (delivery order): $3,173,449, Defense Threat Reduction Agency. Engineering, Testing, Evaluation, and Test Range Access to Provide Timely Technology Solutions Ready for Demonstration.. https://www.usaspending.gov/award/CONT_AWD_HDTRA121F0020_9700_HDTRA118D0002_9700/
- SPRHA424C0010 (definitive contract): $3,124,006, DLA Aviation at Ogden, Ut. A-10 Circuit Card Assembly. https://www.usaspending.gov/award/CONT_AWD_SPRHA424C0010_9700_-NONE-_-NONE-/
- HDTRA119F0064 (delivery order): $3,016,158, Defense Threat Reduction Agency. Base Program Planning Support. https://www.usaspending.gov/award/CONT_AWD_HDTRA119F0064_9700_HDTRA118D0002_9700/
- FA852325FB054 (delivery order): $2,968,110, FA8523 Afmc/Aflcmc Esyc. Engineering Services. https://www.usaspending.gov/award/CONT_AWD_FA852325FB054_9700_FA852321D0007_9700/
- FA812224F0058 (delivery order): $2,928,657, FA8122 AFSC Pzaab. Manufacture of T5 Tester for J85. https://www.usaspending.gov/award/CONT_AWD_FA812224F0058_9700_FA812224D0006_9700/
- 80GSFC25CA035 (definitive contract): $2,772,763, NASA Goddard Space Flight Center. Suprathermal Ion Spectrograph Phase E Instrument for Solar Orbiter Mission. https://www.usaspending.gov/award/CONT_AWD_80GSFC25CA035_8000_-NONE-_-NONE-/
- NNM13AA38C (definitive contract): $2,681,756, NASA Marshall Space Flight Center. Phase A-B Development of the Juice Ultraviolet Spectrograph the European Space Agency Selected the Jupiter Icy Moons Explorer (Juice) Mission as the First Mission in Its Large-Class Mission Portfolio Under the Cosmic Vision Program. the Juice Mission Will Investigate Jupiter and Its Icy Moons, Completing Its Mission by Orbiting Ganymede. the Mission Is Planned for Launch in 2022. the NASA Science Mission Directorate (Smd) Has Offered to Collaborate in This Mission. in 2012, NASA Issued Program Element Appendix (Pea) K as an Appendix of the Second Stand Alone Missions of Opportunity Notice (Salmon-2)(Nnh12zda006o-Juice) Announcement of Opportunity (Ao)(Nnh12zda006o) for the Purpose of Soliciting Proposals for Juice Mission of Opportunity (Mo) Investigations to Be Managed Under the NASA New Frontiers Program. the Juice Ultraviolet Imaging Spectrograph (Juice-Uvs) Is a Complete, Stand-Alone Instrument Proposed and Selected Under the Salmon-2 Ao, to Be Included in the Esa Juice Payload as Part of Nasas U.S. Contribution, and Developed by the Southwest Research Institute (Swri) in San Antonio, Tx. the Leader of the Juice-Uvs Team Is the Principal Investigator (Pi), Dr. Randy Gladstone of Swri. the Goals of the Juice-Uvs Investigation Are To: 1) Explore the Atmospheres, Plasma Interactions, and Surfaces of the Galilean Satellites 2) Determine the Dynamics, Chemistry, and Vertical Structure of Jupiters Upper Atmosphere, from Equator to Pole, as a Template for Giant Planets Everywhere and 3) Investigate the Jupiter-Io Connection by Quantifying Energy and Mass Flow in the Io Atmosphere, Neutral Clouds, and Torus. These Goals Are Closely Aligned to Those Described in the Juice Assessment Study Report, and Are Consistent with NASA Goals in the Most Recent Planetary Decadal Survey, the Ejsm Study Report, and SMDS Formal Goals Documents.. https://www.usaspending.gov/award/CONT_AWD_NNM13AA38C_8000_-NONE-_-NONE-/
- FA700024F0067 (delivery order): $2,533,199, FA7000 10 Cons LGC. Task Order for Legacy Aircraft Training Division (Ltad) Aircraft Structural Integrity Program (Asip), Avionics and Tech Data Improvements Support. https://www.usaspending.gov/award/CONT_AWD_FA700024F0067_9700_FA700021D0002_9700/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://abierto.us/vendors/southwest-research-institute-pb11v1kh3kv4.
