# Schlegel Enterprises, Inc.

Canonical: https://abierto.us/vendors/schlegel-enterprises-inc-qynltns4htn1

- UEI: QYNLTNS4HTN1
- CAGE: 1YRG5
- Location: Kalispell, MT
- Awards in window: 25 (30 transactions), $1,896,099 obligated, January 7, 2025 to August 31, 2026

## Awarding agencies

- Forest Service: 25 awards, $1,896,099

## Industries

- 237310 Highway, Street, and Bridge Construction: $1,789,899
- 115310 Support Activities for Forestry: $75,000
- 238910 Site Preparation Contractors: $31,200

## Competition

- Full and Open Competition After Exclusion of Sources: 20 awards
- Competed Under SAP: 5 awards

## Solicitations won

- USDA Forest Service Kootenai National Forest, Pinkham Falls SST (Concrete Vault Toilet) (1240LU25Q0090). https://abierto.us/opportunities/1240lu25q0090

## Largest awards

- 1240LU24F0072 (delivery order): $669,918, Usda-Fs, Csa Intermountain 9. Gaoa Tiger Creek Bridge Replacement and Detour Flathead NF. https://www.usaspending.gov/award/CONT_AWD_1240LU24F0072_12C2_12034319D0029_12C2/
- 1240LU26F0058 (delivery order): $436,789, Usda-Fs, Csa Intermountain 9. Task Order for Double Barrell & Square Peg Road Construction on the Flathead National Forest Constructing Roads on the Lost Creek Divide in Support of the Double Barrel Timber Sale.. https://www.usaspending.gov/award/CONT_AWD_1240LU26F0058_12C2_1240LU25D0018_12C2/
- 1240LU24F0008 (delivery order): $392,492, Usda-Fs, Csa Intermountain 9. Gaoa Logging Creek Campground Updates HLCNF. https://www.usaspending.gov/award/CONT_AWD_1240LU24F0008_12C2_12034319D0029_12C2/
- 1240LU24F0050 (delivery order): $363,437, Usda-Fs, Csa Intermountain 9. Gaoa - Hungry Horse Creek Aop & Detour to on the Flathead National Forest. https://www.usaspending.gov/award/CONT_AWD_1240LU24F0050_12C2_12034319D0029_12C2/
- 1240LU24F0034 (delivery order): $321,040, Usda-Fs, Csa Intermountain 9. Flat-Basin BMP Project: the Project Consists of Best Management Practice (Bmp) Upgrades and Road Improvement Work, to Include But Not Limited to Drain Dip Construction, Culvert Installation, Roadway Reconditioning, Road Reconstruction as Well as New. https://www.usaspending.gov/award/CONT_AWD_1240LU24F0034_12C2_12034319D0029_12C2/
- 1240LU24F0010 (delivery order): $290,976, Usda-Fs, Csa Intermountain 9. The Project Consists of New Road Construction, Existing Road Reconstruction, Drainage Feature Installation, Cattleguard and Gate Installation and Possible Gravel Surfacing Placement.. https://www.usaspending.gov/award/CONT_AWD_1240LU24F0010_12C2_12034319D0029_12C2/
- 1240LU26F0080 (delivery order): $274,100, Usda-Fs, Csa Intermountain 9. Construct Two New Aquatic Organism Passageways Aops in the Plant Creek Drainage on the Missoula District of the Lolo National Forest. One on NFSR 464 at MP 0.272, and One on NFSR 19022 at MP 0.000. the New Structures Will Replace Stormed Damaged Unsu. https://www.usaspending.gov/award/CONT_AWD_1240LU26F0080_12C2_1240LU25D0018_12C2/
- 1240LU26F0072 (delivery order): $220,143, Usda-Fs, Csa Intermountain 9. Chief Joseph Trailhead Improvements, Beaverhead Deerlodge National Forest. https://www.usaspending.gov/award/CONT_AWD_1240LU26F0072_12C2_1240LU25D0018_12C2/
- 1240LU26F0086 (delivery order): $162,012, Usda-Fs, Csa Intermountain 9. 8 Mile Creek Bridge Replacement. https://www.usaspending.gov/award/CONT_AWD_1240LU26F0086_12C2_1240LU25D0018_12C2/
- 1240LU24F0068 (delivery order): $148,550, Usda-Fs, Csa Intermountain 9. Gaoa Backcountry Airstrip Road Maintenance Flathead NF. https://www.usaspending.gov/award/CONT_AWD_1240LU24F0068_12C2_12034319D0029_12C2/
- 1240LU26F0010 (delivery order): $146,460, Usda-Fs, Csa Intermountain 9. Specific Improvements to FSR 267, Include, But Are Not Limited To: Selective Clearing, Removal and Disposal of Existing CSP Culverts, Installation of New CSP Culverts, Construction of New Drivable Dips, Shoulder Stabilization Using Class 3 Riprap, AG. https://www.usaspending.gov/award/CONT_AWD_1240LU26F0010_12C2_1240LU25D0018_12C2/
- 1240LU26F0073 (delivery order): $130,554, Usda-Fs, Csa Intermountain 9. This Project Will Improve the Antelope Basin Road (230) on the Madison Ranger District of the Beaverhead Deerlodge National Forest.. https://www.usaspending.gov/award/CONT_AWD_1240LU26F0073_12C2_1240LU25D0018_12C2/
- 1240LU24P0005 (purchase order): $108,868, Usda-Fs, Csa Intermountain 9. Gaoa Flathead National Forest Middle Fork Wild and Scenic River Access Site Deferred Maintenance. https://www.usaspending.gov/award/CONT_AWD_1240LU24P0005_12C2_-NONE-_-NONE-/
- 1284LM25P0022 (purchase order): $94,945, Usda-Fs, Csa Intermountain 2. Road Maintenance Blading on the Ninemile and Seeley Ranger Districts for 2025. https://www.usaspending.gov/award/CONT_AWD_1284LM25P0022_12C2_-NONE-_-NONE-/
- 1240LU24F0070 (delivery order): $90,726, Usda-Fs, Csa Intermountain 9. Skid Creek Culvert Replacement Kootenai NF. https://www.usaspending.gov/award/CONT_AWD_1240LU24F0070_12C2_12034319D0029_12C2/
- 1240LU26F0076 (delivery order): $85,053, Usda-Fs, Csa Intermountain 9. Removal of 60" Corrugated Steel Pipe and Replacement with 96" Corrugated Steel Pipe on NFSR 368 at the North Fork of Deep Creek Crossing.. https://www.usaspending.gov/award/CONT_AWD_1240LU26F0076_12C2_1240LU25D0018_12C2/
- 1240LU26F0082 (delivery order): $84,536, Usda-Fs, Csa Intermountain 9. Glacier Creek Bridge Riprap. https://www.usaspending.gov/award/CONT_AWD_1240LU26F0082_12C2_1240LU25D0018_12C2/
- 1202SB26M2730 (delivery order): $75,000, Usda-Fs PPS Incident Procurement. Schlegel Enterprises, INC. Mtfnf000306 E4. https://www.usaspending.gov/award/CONT_AWD_1202SB26M2730_12C2_1202SB24T7152_12C2/
- 1240LU24F0060 (delivery order): $74,692, Usda-Fs, Csa Intermountain 9. Gaoa Tally Lake Rec Site Roads Deferred Maintenance Flathead National Forest. https://www.usaspending.gov/award/CONT_AWD_1240LU24F0060_12C2_12034319D0029_12C2/
- 1240LU24F0061 (delivery order): $54,926, Usda-Fs, Csa Intermountain 9. Alice Creek Road Reroute. https://www.usaspending.gov/award/CONT_AWD_1240LU24F0061_12C2_12034319D0029_12C2/
- 1240LU25F0076 (delivery order): $46,005, Usda-Fs, Csa Intermountain 9. Install Arch Pipe on USFS RD 1900 Mile Post (Mp) 1.80 Crossing Beetle Creek. the Original Pipe Is Removed, and the Road Is Trenched to Allow Passage of the Stream.. https://www.usaspending.gov/award/CONT_AWD_1240LU25F0076_12C2_1240LU25D0018_12C2/
- 1240LU26F0046 (delivery order): $44,664, Usda-Fs, Csa Intermountain 9. Specific Improvements to Forest Road 267, M.P. 2.257 Include, But Are Not Limited To: Removal and Disposal of Two Existing CSP Culverts and Installation of a New Corrugated Steel Pipe-Arch Culvert, Structure Excavation/Backfill, Surfacing, Structure. https://www.usaspending.gov/award/CONT_AWD_1240LU26F0046_12C2_1240LU25D0018_12C2/
- 1284LM24F0011 (delivery order): $38,110, Usda-Fs, Csa Intermountain 2. Seeley Lake Ranger District Maintenance Blading - Spring 2024. https://www.usaspending.gov/award/CONT_AWD_1284LM24F0011_12C2_1284LM21D0008_12C2/
- 1284LM24F0023 (delivery order): $35,446, Usda-Fs, Csa Intermountain 2. Lolo NF Nine Mile Ranger District Road Blading. https://www.usaspending.gov/award/CONT_AWD_1284LM24F0023_12C2_1284LM21D0007_12C2/
- 1240LU26F0070 (delivery order): $34,976, Usda-Fs, Csa Intermountain 9. Install Bridge Running Planks on 8 Bridges Across the Helena - Lewis & Clark National Forest.. https://www.usaspending.gov/award/CONT_AWD_1240LU26F0070_12C2_1240LU25D0018_12C2/
- 1240LU26F0098 (delivery order): $32,000, Usda-Fs, Csa Intermountain 9. Sun River Road Emergency Rock Removal. https://www.usaspending.gov/award/CONT_AWD_1240LU26F0098_12C2_1240LU25D0018_12C2/
- 1240LU25C0040 (definitive contract): $31,200, Usda-Fs, Csa Intermountain 9. The Contract Consists of Procurement, Delivery, Site Preparation, and Instillation in Accordance with the Manufacturers, Specifications for One New Concrete Vault Toilet at the Staked Location on USFS Road 15061. This Contract Requires Furnishing Lab. https://www.usaspending.gov/award/CONT_AWD_1240LU25C0040_12C2_-NONE-_-NONE-/
- 1284LM24F0020 (delivery order): $19,569, Usda-Fs, Csa Intermountain 2. D5 Maintenance Blading Task Order. Existing IDIQ Contract. https://www.usaspending.gov/award/CONT_AWD_1284LM24F0020_12C2_1284LM21D0009_12C2/
- 1240LU24F0028 (delivery order): $17,500, Usda-Fs, Csa Intermountain 9. Valley of the Moon Riprap. https://www.usaspending.gov/award/CONT_AWD_1240LU24F0028_12C2_12034319D0029_12C2/
- 1240LU23F0070 (delivery order): $2,400, Usda-Fs, Csa Intermountain 9. Little Willow Creek Culvert Replacement Helena-Lewis & Clark National Forest. https://www.usaspending.gov/award/CONT_AWD_1240LU23F0070_12C2_12034319D0029_12C2/
- 1240LQ26F0016 (delivery order): $500, Usda-Fs, Csa Intermountain 5. Efficient Contract Vehicle to Accomplish Road Maintenance in Region 1 Guarantee Minimum. https://www.usaspending.gov/award/CONT_AWD_1240LQ26F0016_12C2_1240LQ25D0038_12C2/
- 1202SB24T7152: $0, Usda-Fs PPS Incident Procurement. Vipr I-Bpa for Heavy Equipment for East Zone (Regions 1, 2, 4, and 9). https://www.usaspending.gov/award/CONT_IDV_1202SB24T7152_12C2/
- 1202SB24T7351: $0, Usda-Fs PPS Incident Procurement. Vipr I-Bpa for Miscellaneous Heavy Equipment for East Zone, Regions 1, 2 and 4. https://www.usaspending.gov/award/CONT_IDV_1202SB24T7351_12C2/
- 1202SB26T8014: $0, Usda-Fs PPS Incident Procurement. Miscellaneous Heavy Equipment for East Zone, Regions 1, 2 and 4. https://www.usaspending.gov/award/CONT_IDV_1202SB26T8014_12C2/
- 1202SB26T8900: $0, Usda-Fs PPS Incident Procurement. Heavy Equipment for East Zone (Regions 1, 2, 4, and 9). https://www.usaspending.gov/award/CONT_IDV_1202SB26T8900_12C2/
- 12034319D0029: $0, Usda-Fs, Csa Intermountain 9. Modification 0008 to IDIQ for Road and Bridge Construction Services, Exercises a 6-Month Extension on the Final Option Period. New Performance Period Is September 20, 2024 to March 19, 2025. All Other Terms and Conditions Remain the Same.. https://www.usaspending.gov/award/CONT_IDV_12034319D0029_12C2/
- 1240LQ25D0038: $0, Usda-Fs, Csa Intermountain 5. Region 1 Road Maintenance and Forest Maintenance/Support Services. https://www.usaspending.gov/award/CONT_IDV_1240LQ25D0038_12C2/
- 1240LU25D0018: $0, Usda-Fs, Csa Intermountain 9. Usfs, Region 1, Road and Bridge Construction Matoc. https://www.usaspending.gov/award/CONT_IDV_1240LU25D0018_12C2/
- 1240LN21C0014 (definitive contract): -$2, Usda-Fs, Csa Intermountain 3. The Purpose of This Modification Is to Deobligate the Funds Remaining Due to Rounding Differences in the Final Price.. https://www.usaspending.gov/award/CONT_AWD_1240LN21C0014_12C2_-NONE-_-NONE-/
- 1240LU22F0150 (delivery order): -$2,839, Usda-Fs, Csa Intermountain 9. The Objective of the Project Is to Reconstruct Six Existing Road Segments Totaling Approximately 8 Miles to the Standard Forest Service Road Width of 14 Feet Using the Linear Grading Specification and Construct Two New Road Segments Totaling Approxim. https://www.usaspending.gov/award/CONT_AWD_1240LU22F0150_12C2_12034319D0029_12C2/
- 1240LU23F0040 (delivery order): -$14,041, Usda-Fs, Csa Intermountain 9. Road Decommissioning Through Various Levels of Obliteration. CMP Removal. Land Reclamation and Rehabilitation at Various Dispersed Recreation Sites That Have Been Impacted by Unauthorized User Created Sprawl.. https://www.usaspending.gov/award/CONT_AWD_1240LU23F0040_12C2_12034319D0029_12C2/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://abierto.us/vendors/schlegel-enterprises-inc-qynltns4htn1.
