# Rock-N-Road Construction, Inc.

Canonical: https://abierto.us/vendors/rock-n-road-construction-inc-lp4klhjqhd94

- UEI: LP4KLHJQHD94
- CAGE: 1SSX8
- Parent: Rock-N-Road Construction, Inc.
- Location: Petersburg, AK
- Awards in window: 29 (60 transactions), $3,646,730 obligated, January 2, 2024 to July 30, 2026

## Awarding agencies

- Forest Service: 29 awards, $3,646,730

## Industries

- 237990 Other Heavy and Civil Engineering Construction: $2,463,140
- 237310 Highway, Street, and Bridge Construction: $1,020,805
- 212321 Construction Sand and Gravel Mining: $119,250
- 238910 Site Preparation Contractors: $33,000
- 561790 Other Services to Buildings and Dwellings: $10,535

## Competition

- Competed Under SAP: 15 awards
- Full and Open Competition After Exclusion of Sources: 13 awards

## Solicitations won

- TBRD Upper Steelhead Road Storage and Decommissioning (1240BF24C0015), $33,000. https://abierto.us/opportunities/1240bf24c0015
- CRD Rock Crushing (1240BF24Q0059), $119,250. https://abierto.us/opportunities/1240bf24q0059
- Dock and Marine Infrastructure Repairs at False Island: Tongass NF (12048924R0048). https://abierto.us/opportunities/12048924r0048
- Tongass Docks and Marine Infrastructure Repairs: KMRD Remote Dock (12048924R0030). https://abierto.us/opportunities/12048924r0030
- PRD Mitkof Island Bridge Resurfacing (1240BF24Q0040), $64,600. https://abierto.us/opportunities/1240bf24q0040
- 1005 EAM CONST WRD Zarembo Island - Phase 2 6590 Rd. Reconstruction (1240BJ24Q0035). https://abierto.us/opportunities/1240bj24q0035
- GAOA - El Cap Recreation Area Improvements: Campground and Day Use Area (1240BJ24R0012), $972,130. https://abierto.us/opportunities/1240bj24r0012

## Largest awards

- 1240BJ24C0004 (definitive contract): $993,453, Usda-Fs, Csa Northwest 7. Gaoa - Work Is to Improve Three Campsites and Access Road Develop Additional Parking Install Pay Station, 1 Vault Toilet, 1 Day Use Picnic Shelter and Related Amenities, and Repair Existing Dock Facilities.. https://www.usaspending.gov/award/CONT_AWD_1240BJ24C0004_12C2_-NONE-_-NONE-/
- 12048924C0013 (definitive contract): $835,677, USDA Forest Service-Spoc NW. Gaoa Tongass Docks and Marine Infrastructure Repairs: KMRD Remote Dock. https://www.usaspending.gov/award/CONT_AWD_12048924C0013_12C2_-NONE-_-NONE-/
- 12048924C0014 (definitive contract): $623,310, USDA Forest Service-Spoc NW. Gaoa Tongass Docks and Marine Infrastructure Repairs: False Island Remote Dock. https://www.usaspending.gov/award/CONT_AWD_12048924C0014_12C2_-NONE-_-NONE-/
- 1240BJ24F0018 (delivery order): $314,670, Usda-Fs, Csa Northwest 7. Dewatering, Excavation, Rock Excavation, Installation of Structures, Development of Quarry, Borrow Material from Nearby Quarry for Material, Haul, Reconstructing Streambed and Banks with Instream Rock Structures, Backfill, and Soil Erosion Control. https://www.usaspending.gov/award/CONT_AWD_1240BJ24F0018_12C2_1240BJ23D0012_12C2/
- 12048924F0087 (delivery order): $238,975, USDA Forest Service-Spoc NW. 2024 Pow Shaheen Staney Aop- the Purpose of This Task Order from the Region 10 Matoc (Aop) Construction Parent Contract Is to (1) Replace 1 Undersized Corrugated Metal Pipe with an Aop Designed Culvert on NFS Road 2050300 MP 4.67, to (2) Place 300 Cy. https://www.usaspending.gov/award/CONT_AWD_12048924F0087_12C2_1240BJ23D0012_12C2/
- 1240BJ24F0045 (bpa call): $189,550, Usda-Fs, Csa Northwest 7. 1005 Eam Const WRD Phase 2 Zarembo Island Boat Launch- ST Johns Bridge- Road 6590 Road Reconstruction, Culvert Installation, and Surfacing on Zarembo Island. the Work Will Consist of Roadway Reconditioning, Culvert Installation, the Development of a. https://www.usaspending.gov/award/CONT_AWD_1240BJ24F0045_12C2_1240BH21A0009_12C2/
- 12048923F0065 (delivery order): $174,650, USDA Forest Service-Spoc NW. Iija/Bil False Island Aquatic Organism Passage Reconstruction: : the Purpose of This Task Order from the Tongass Matoc (Aop) Construction Parent Contract Is to Replace 2 Undersized Corrugated Metal Pipes with Aop Designed Structures on NFS Road 7540F. https://www.usaspending.gov/award/CONT_AWD_12048923F0065_12C2_12010920D0017_12C2/
- 1240BF24C0013 (definitive contract): $119,250, Usda-Fs, Csa Northwest 4. CRD Rock Crushing. https://www.usaspending.gov/award/CONT_AWD_1240BF24C0013_12C2_-NONE-_-NONE-/
- 1240BF24C0006 (definitive contract): $64,600, Usda-Fs, Csa Northwest 4. PRD Mitkof Island Bridge Resurfacing. https://www.usaspending.gov/award/CONT_AWD_1240BF24C0006_12C2_-NONE-_-NONE-/
- 1240BF24C0015 (definitive contract): $33,000, Usda-Fs, Csa Northwest 4. TBRD Upper Steelhead Road Storage and Decommissioning. https://www.usaspending.gov/award/CONT_AWD_1240BF24C0015_12C2_-NONE-_-NONE-/
- 12048923F0061 (delivery order): $25,860, USDA Forest Service-Spoc NW. Backloop Road Reconditioning; Complete Reconditioning of 5.15 Miles of Roadway. This Project Will Also Involve Developing a Material Source, Crushing, Hauling, Placing and Compaction of Surface Base Aggregate and Installing Multiple New Culverts.. https://www.usaspending.gov/award/CONT_AWD_12048923F0061_12C2_1240BJ23D0012_12C2/
- 1240BJ23C0007 (definitive contract): $10,900, Usda-Fs, Csa Northwest 7. Tongass National Forest - Gaoa Roosevelt Harbor Dock Repair MOD2 - Install, Removal and Replacement of Decking Materials.. https://www.usaspending.gov/award/CONT_AWD_1240BJ23C0007_12C2_-NONE-_-NONE-/
- 1240BJ24F0003 (delivery order): $8,600, Usda-Fs, Csa Northwest 7. Gaoa Hoonah Road, Aop Improvements & Bridge Recon: 8502 MP 1.986 Bridge: Hoonah Double Lane Bridges Phase Two. Replace the Single Lane Bridge at 8502 MP 1.986 with a Longer Double Lane Bridge. https://www.usaspending.gov/award/CONT_AWD_1240BJ24F0003_12C2_1240BJ23D0012_12C2/
- 1240BJ23F0047 (delivery order): $6,401, Usda-Fs, Csa Northwest 7. Gaoa Hoonah Road, Aop Improvements & Bridge Recon: 8502 MP 3.478 Bridge; Removal of Existing Bridge and Construction of New 69' Bridge and Abutments; Reconstruction of Road for Bridge Construction. https://www.usaspending.gov/award/CONT_AWD_1240BJ23F0047_12C2_1240BJ23D0012_12C2/
- 1240BF25F0065 (delivery order): $6,300, Usda-Fs, Csa Northwest 4. Snow Plow and Sanding Services for Harris Building Parking Lot. 1240BF22D0030 Wpap 716865. https://www.usaspending.gov/award/CONT_AWD_1240BF25F0065_12C2_1240BF22D0030_12C2/
- 1240BF26F0060 (delivery order): $3,340, Usda-Fs, Csa Northwest 4. PRD Snowplowing Services - Option Period 4 Task Order. https://www.usaspending.gov/award/CONT_AWD_1240BF26F0060_12C2_1240BF22D0030_12C2/
- 1240BF26F0007 (delivery order): $2,500, Usda-Fs, Csa Northwest 4. PRD Snowplowing Services - OP3 Task Order. https://www.usaspending.gov/award/CONT_AWD_1240BF26F0007_12C2_1240BF22D0030_12C2/
- 1240BF24F0058 (delivery order): $2,240, Usda-Fs, Csa Northwest 4. PSG Harris BLG Snowplowing & Sanding. https://www.usaspending.gov/award/CONT_AWD_1240BF24F0058_12C2_1240BF22D0030_12C2/
- 1240BJ23C0005 (definitive contract): $1,800, Usda-Fs, Csa Northwest 7. Gaoa Tongass NF Dock: Sitka and Petersburg Marine Facilities Mod 1: Change Co from Janet Paul to Mai Moua. Use of Lumber in Lieu of Composite. Extend the Period of Performance to July 30, 2024.. https://www.usaspending.gov/award/CONT_AWD_1240BJ23C0005_12C2_-NONE-_-NONE-/
- 1240BF24F0006 (delivery order): $850, Usda-Fs, Csa Northwest 4. PSG Pdo Snowplow. https://www.usaspending.gov/award/CONT_AWD_1240BF24F0006_12C2_1240BF22D0030_12C2/
- 1240BF25F0005 (delivery order): $0, Usda-Fs, Csa Northwest 4. PSG Snowplowing & Sanding Housing Compound. https://www.usaspending.gov/award/CONT_AWD_1240BF25F0005_12C2_1240BF22D0030_12C2/
- 1240BJ23F0025 (delivery order): $0, Usda-Fs, Csa Northwest 7. Gaoa Zarembo Island Boat Launch, Road Reconstruction, Aops & ST Johns Bridge- ST Johns Bridge Replacement- Replace a 80' Bridge with a 112 ' Bridge on Road 6290 at MP1.1. https://www.usaspending.gov/award/CONT_AWD_1240BJ23F0025_12C2_1240BJ23D0012_12C2/
- 1240BF22D0030: $0, Usda-Fs, Csa Northwest 4. PSBG Office Snowplowing & Sanding. https://www.usaspending.gov/award/CONT_IDV_1240BF22D0030_12C2/
- 1240BH21A0009: $0, Usda-Fs, Csa Northwest 6. Forest Service Region 10 Road Construction and Maintenance Blanket Purchase Agreement. https://www.usaspending.gov/award/CONT_IDV_1240BH21A0009_12C2/
- 1240BJ23D0012: $0, Usda-Fs, Csa Northwest 7. The Scope of This Multiple Award Task Order Contract (Matoc) Includes, But Is Not Limited To, the Following Types of Highway, Street, and Bridge Construction. the Work Performed May Include New Work, Additions, Alterations, Maintenance, and Repairs.. https://www.usaspending.gov/award/CONT_IDV_1240BJ23D0012_12C2/
- 1240BF22F0048 (delivery order): -$1,320, Usda-Fs, Csa Northwest 4. Task Order for PSBG Office and QTRS Complex Snowplowing & Sanding. https://www.usaspending.gov/award/CONT_AWD_1240BF22F0048_12C2_1240BF22D0030_12C2/
- 1240BJ23P0001 (purchase order): -$2,000, Usda-Fs, Csa Northwest 7. Gaoa Tongass NF Dock: Wrangell Marine Facility. https://www.usaspending.gov/award/CONT_AWD_1240BJ23P0001_12C2_-NONE-_-NONE-/
- 1240BJ23F0011 (delivery order): -$2,500, Usda-Fs, Csa Northwest 7. Minimum Guarantees for R10 Road Construction Matoc IDIQ Modification to Cancel Order and Deobligate Minimum Guarantee as Guarantee Has Been Met on Other Orders.. https://www.usaspending.gov/award/CONT_AWD_1240BJ23F0011_12C2_1240BJ23D0012_12C2/
- 1240BF23F0062 (delivery order): -$3,375, Usda-Fs, Csa Northwest 4. PSBG Office Snowplowing & Sanding. https://www.usaspending.gov/award/CONT_AWD_1240BF23F0062_12C2_1240BF22D0030_12C2/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://abierto.us/vendors/rock-n-road-construction-inc-lp4klhjqhd94.