# Paragon Space Development Corporation

Canonical: https://abierto.us/vendors/paragon-space-development-corporation-rmk3anu9rlc7

- UEI: RMK3ANU9RLC7
- CAGE: 1P9N1
- Location: Tucson, AZ
- Awards in window: 18 (42 transactions), $5,116,674 obligated, January 8, 2025 to September 11, 2026

## Awarding agencies

- National Aeronautics and Space Administration: 14 awards, $3,897,796
- Department of the Navy: 3 awards, $1,218,878
- Department of the Army: 1 awards, $0

## Industries

- 541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology): $5,211,214
- 541712 Professional, Scientific, and Technical Services: -$94,540

## Competition

- Full and Open Competition After Exclusion of Sources: 9 awards
- Not Competed Under SAP: 7 awards
- Full and Open Competition: 2 awards

## Largest awards

- 80JSC025F7050 (delivery order): $1,834,655, NASA Johnson Space Center. The Build, Test, and Delivery of 60 BPA Bladders.. https://www.usaspending.gov/award/CONT_AWD_80JSC025F7050_8000_80JSC021D0007_8000/
- 80JSC025F7037 (delivery order): $1,109,796, NASA Johnson Space Center. The Purpose of This Task Order (To) Is to Update the Existing BPA Detrusor Design and Deliver the Updated Detrusor Hardware to NASA That Will Replace the Existing BPA Detrusor Aboard the International Space Station (Iss).. https://www.usaspending.gov/award/CONT_AWD_80JSC025F7037_8000_80JSC021D0007_8000/
- N6833525C0333 (definitive contract): $979,091, NAVAIR Warfare CTR Aircraft Div. Research and Development. https://www.usaspending.gov/award/CONT_AWD_N6833525C0333_9700_-NONE-_-NONE-/
- 80JSC025F7068 (delivery order): $200,620, NASA Johnson Space Center. Authorize and Fund Clins 0001 & 0002 for Fiscal Year (Fy) 2026.. https://www.usaspending.gov/award/CONT_AWD_80JSC025F7068_8000_80JSC021D0007_8000/
- 80JSC025F7019 (delivery order): $199,603, NASA Johnson Space Center. BPA Bladder Purchase and Delivery. https://www.usaspending.gov/award/CONT_AWD_80JSC025F7019_8000_80JSC021D0007_8000/
- 80JSC026F0040 (delivery order): $156,986, NASA Johnson Space Center. The Purpose of This Task Order Is to Order Clin 0001 and 0002 Services and Supplies for Fiscal Year (Fy) 26. See Parent Contract in Block 2 for Schedule and Description of Services and Supplies.. https://www.usaspending.gov/award/CONT_AWD_80JSC026F0040_8000_80JSC026D0006_8000/
- 80NSSC25C0295 (definitive contract): $149,915, NASA Shared Services Center. Phase I SBIR - Multistage Umbilical Disconnect (Mud) System. https://www.usaspending.gov/award/CONT_AWD_80NSSC25C0295_8000_-NONE-_-NONE-/
- 80NSSC25C0294 (definitive contract): $149,022, NASA Shared Services Center. STTR Phase I - Deep-Space Anomaly Solution for Habitat Assistance and Resolution Aid (Dashara). https://www.usaspending.gov/award/CONT_AWD_80NSSC25C0294_8000_-NONE-_-NONE-/
- N6833525C0353 (definitive contract): $139,826, NAVAIR Warfare CTR Aircraft Div. Research and Development. https://www.usaspending.gov/award/CONT_AWD_N6833525C0353_9700_-NONE-_-NONE-/
- 80NSSC26P0630 (purchase order): $104,934, NASA Shared Services Center. Development of the Xemu LCVG Thermal Control Loop. https://www.usaspending.gov/award/CONT_AWD_80NSSC26P0630_8000_-NONE-_-NONE-/
- N6833524C0487 (definitive contract): $99,961, NAVAIR Warfare CTR Aircraft Div. Research and Development.. https://www.usaspending.gov/award/CONT_AWD_N6833524C0487_9700_-NONE-_-NONE-/
- 80JSC025F7033 (delivery order): $85,804, NASA Johnson Space Center. Maintain Nominal BPA Operations Through December 2030 Aboard the International Space Station (Iss).. https://www.usaspending.gov/award/CONT_AWD_80JSC025F7033_8000_80JSC021D0007_8000/
- 80JSC026D0006: $1,000, NASA Johnson Space Center. Brine Processor Assembly. https://www.usaspending.gov/award/CONT_IDV_80JSC026D0006_8000/
- 80NSSC24CA023 (definitive contract): $0, NASA Shared Services Center. STTR Phase II - Spacesuit Cover Against the Abrasive Lunar Environment (Scale) & Exploration Textile for High Oxygen Environments. https://www.usaspending.gov/award/CONT_AWD_80NSSC24CA023_8000_-NONE-_-NONE-/
- 80NSSC24CA061 (definitive contract): $0, NASA Shared Services Center. FY24 SBIR Phase II - Softgoods Webbing Integrated Strain Sensor for Inflatable. https://www.usaspending.gov/award/CONT_AWD_80NSSC24CA061_8000_-NONE-_-NONE-/
- W5170124C0253 (definitive contract): $0, W27P USA Acq SPT CTR. SBIR Phase II Paragon Space. https://www.usaspending.gov/award/CONT_AWD_W5170124C0253_9700_-NONE-_-NONE-/
- 80JSC021D0007: $0, NASA Johnson Space Center. Sustaining Engineering Statement of Work Addition.. https://www.usaspending.gov/award/CONT_IDV_80JSC021D0007_8000/
- NNH16CL01C (definitive contract): -$94,540, NASA Headquarters. EO14042 Recovery of Potable Water from Wastewater Is Essential to the Success of Long-Duration Human Spaceflight. for Human Missions to Mars, the Technology Maturation (Ta 207) Objective Is to Recover Greater Than 98 Percent of the Water from Wastewater Sources (Urine, Humidity Condensate, Etc.). This Contract Is for the Development of Ionomer-Membrane Water Processor (Iwp) Brine Processor for Flight Demonstration on the International Space Station (Iss). Requirements for the Brine Processor Will Be Baselined by NASA and Agreed to by the Contractor Under the Phase III SBIR Nnx16cj02c. an Iss Flight Demonstration Is Needed to Validate and Fully Characterize Brine Processor System Performance in a Relevant Environment for Future Exploration Missions. the Relevant Environment in This Case Includes Both Micro-Gravity and Long-Duration Exposure to Micro-G Crew-Produced Brine Via the Urine Processor. the Brine Processor Will Be Flown as a Class 1E Piece of Hardware. Tasks Include 1) Complete Technology Maturation of Key Component Subsystems of the Iwp from the Phase III SBIR Including Bladder Heat Sealing, Low-Profile Side-Mounted Fill Port, Detrusor and System Compatibility with Inadvertent Exposure to 14.7 Psig During Brine Fill 2) System Design Cycle Including Heater and Energy Management Trade 3) Integrated System and Component Preliminary Design 4) Integrated System and Component Final Design and Review 5) Manufacturing of One Complete Iwp Assembly, 42 Bladders (18 for Qualification Testing and 24 for Flight), One Non-Operating Training Unit with Spares 6) Protoflight Qualification Testing and Bladder Acceptance Testing 7) Hardware Acceptance Review and Delivery of a Brine Processor and Associated Consumables, for an Iss Technology Demonstration 8) Post-Delivery and ON-ORBIT Support Which Includes Generation of Operations and Maintenance Handbook for Use by NASA in Support of Crew Training and the Development of ON-ORBIT Operations and Maintenance, Crew Training Support, and ON-ORBIT Operations Support and Support with NASA ON-ORBIT Anomaly Resolution and Generation of an ON-ORBIT Test Report with Lessons Learned and Recommendations for Improvements.. https://www.usaspending.gov/award/CONT_AWD_NNH16CL01C_8000_-NONE-_-NONE-/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://abierto.us/vendors/paragon-space-development-corporation-rmk3anu9rlc7.
