# Paradigm CCW JV LLC

Canonical: https://abierto.us/vendors/paradigm-ccw-jv-llc-was2nt1q8px1

- UEI: WAS2NT1Q8PX1
- CAGE: 9ND09
- Location: Phoenix, AZ
- Awards in window: 17 (31 transactions), $27,543,720 obligated, March 25, 2025 to May 29, 2026

## Awarding agencies

- Department of the Air Force: 13 awards, $25,890,411
- Department of the Navy: 4 awards, $1,653,309

## Industries

- 236220 Commercial and Institutional Building Construction: $27,543,720

## Competition

- Full and Open Competition After Exclusion of Sources: 17 awards

## Largest awards

- FA487725F0201 (delivery order): $6,679,444, FA4877 355 Cons PK. This Project Calls for the Design, Plans, Specifications, and Repair of Building 4800 at Dmafb for the Incoming MC-130J Squad Ops.. https://www.usaspending.gov/award/CONT_AWD_FA487725F0201_9700_FA487724D0015_9700/
- FA487725F0306 (delivery order): $6,646,544, FA4877 355 Cons PK. A. the Multiple Award Construction Contract Is Designed to Provide a Flexible, Competitive, and Responsive Contractual Capability to Perform Design-Build and BID-BUILD Construction Work at Davis-Monthan Afb, Az and Luke Afb, Az. https://www.usaspending.gov/award/CONT_AWD_FA487725F0306_9700_FA487724D0015_9700/
- FA487726F0160 (delivery order): $3,461,915, FA4877 355 Cons PK. Project Fbnv260039 Includes All Work Necessary to Design and Build an RQG Human Performance Training Center (Hptc). https://www.usaspending.gov/award/CONT_AWD_FA487726F0160_9700_FA487724D0015_9700/
- FA487726F0128 (delivery order): $3,316,568, FA4877 355 Cons PK. Design and Construction Services for a 6,400 Square-Foot (80-Feet X 80-Feet) Metal Building to Serve as a Climate-Controlled Storage and Vehicle Maintenance Facility for 88 Tes.. https://www.usaspending.gov/award/CONT_AWD_FA487726F0128_9700_FA487724D0015_9700/
- FA487725F0301 (delivery order): $2,129,073, FA4877 355 Cons PK. The Contractor Shall Provide Removal and Replacement of Air Handling Systems, Evaporative Coolers, and Chillers in Buildings 7440, 7401 and 7506 at Davis Monthan Air Force Base (Dmafb) Iaw the Statement of Work (Sow) (Attachment 1).. https://www.usaspending.gov/award/CONT_AWD_FA487725F0301_9700_FA487724D0015_9700/
- FA487726F0150 (delivery order): $1,487,483, FA4877 355 Cons PK. This Is a Design Build Project, and the Preparation of the Temporary Facility for Amu Relocatable Facilities (Rlf).. https://www.usaspending.gov/award/CONT_AWD_FA487726F0150_9700_FA487724D0015_9700/
- N6426725F1109 (delivery order): $1,389,942, Naval Surface Warfare Center. B508, B517 and B523 Roof Repair. https://www.usaspending.gov/award/CONT_AWD_N6426725F1109_9700_N6426724D0004_9700/
- FA487725F0065 (delivery order): $899,983, FA4877 355 Cons PK. A. the Multiple Award Construction Contract Is Designed to Provide a Flexible, Competitive, and Responsive Contractual Capability to Perform Design-Build and BID-BUILD Construction Work at Davis-Monthan Afb, Az and Luke Afb, Az. https://www.usaspending.gov/award/CONT_AWD_FA487725F0065_9700_FA487724D0015_9700/
- FA487726F0165 (delivery order): $832,879, FA4877 355 Cons PK. This Is a Design-Build Project That Entails the Design and Construction of Two 40 X 40 Foot Open-Walled Uv Storage Facility for the Department of the Air Force Rescue.. https://www.usaspending.gov/award/CONT_AWD_FA487726F0165_9700_FA487724D0015_9700/
- FA487725F0285 (delivery order): $571,121, FA4877 355 Cons PK. Project Fbnv250045 Includes All Work Necessary to Perform Design and Construction Services for the Demolition/ Repair/ Construction in Bldg. 4836 79TH RQS for Replacing Flooring and Light Fixtures in Strict Accordance with the Statement of Work (Sow). https://www.usaspending.gov/award/CONT_AWD_FA487725F0285_9700_FA487724D0015_9700/
- FA487725F0293 (delivery order): $356,008, FA4877 355 Cons PK. This Project Renovates Building 96 to Meet Physical Security Requirements to Support 755 Oss at Davis-Monthan Afb, Az. All Work Shall Be Done in Accordance with the Sow.. https://www.usaspending.gov/award/CONT_AWD_FA487725F0293_9700_FA487724D0015_9700/
- FA487725F0220 (delivery order): $347,623, FA4877 355 Cons PK. The Contractor Shall Provide Repair, Replacement, and Upgrade of the Existing Breathing Air Supply System and Fuel Tank Ventilation System at Building 4891 on Davis Monthan Air Force Base (Dmafb) in Accordance with the Statement of Work (Sow).. https://www.usaspending.gov/award/CONT_AWD_FA487725F0220_9700_FA487724D0015_9700/
- N6426725F1013 (delivery order): $265,367, Naval Surface Warfare Center. B544 and B547 Av Wall Upgrade. https://www.usaspending.gov/award/CONT_AWD_N6426725F1013_9700_N6426724D0004_9700/
- FA487725F0272 (delivery order): $61,753, FA4877 355 Cons PK. The Work Includes Field Investigation, Design, Product Submittals, Installation, Testing, and Supervision Necessary to Complete the Building 1610 Armory Ventilation Project at Davis-Monthan Afb.. https://www.usaspending.gov/award/CONT_AWD_FA487725F0272_9700_FA487724D0015_9700/
- FA487724F0233 (delivery order): $250, FA4877 355 Cons PK. Task Order to Satisfy the Minimum Dollar Amount Required for the Base Multiple Award Construction Contract Contract.. https://www.usaspending.gov/award/CONT_AWD_FA487724F0233_9700_FA487724D0015_9700/
- N6426724F0004 (delivery order): $0, Naval Surface Warfare Center. Minimum Guarantee. https://www.usaspending.gov/award/CONT_AWD_N6426724F0004_9700_N6426724D0004_9700/
- FA487724D0015: $0, FA4877 355 Cons PK. A. the Multiple Award Construction Contract Is Designed to Provide a Flexible, Competitive, and Responsive Contractual Capability to Perform Design-Build and BID-BUILD Construction Work at Davis-Monthan Afb, Az and Luke Afb, Az. https://www.usaspending.gov/award/CONT_IDV_FA487724D0015_9700/
- N6426724D0004: $0, Naval Surface Warfare Center. 8(A) Macc. https://www.usaspending.gov/award/CONT_IDV_N6426724D0004_9700/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://abierto.us/vendors/paradigm-ccw-jv-llc-was2nt1q8px1.