- UEI: F5NDARJLBKC6
- CAGE: 0CHA4
- Location: Fort Walton Beach, FL
- Awards in window: 51 (115 transactions), $9,247,682 obligated, January 3, 2024 to June 2, 2026

## Awarding agencies

- Department of the Air Force: 51 awards, $9,247,682

## Industries

- 237310 Highway, Street, and Bridge Construction: $5,861,489
- 238110 Poured Concrete Foundation and Structure Contractors: $3,386,193

## Competition

- Full and Open Competition After Exclusion of Sources: 51 awards

## Solicitations won

- Civil Works IDIQ 2024 - Hurlburt Field, FL (FA441724D0004), $26,000,000. https://abierto.us/opportunities/fa441724d0004

## Largest awards

- FA441725F0278 (delivery order): $1,672,612, FA4417 1 Socons. Work to Be Performed Under This Task Order Will Be in Accordance with the Statement of Work, Accepted Proposal and Drawings Attached in Section J. https://www.usaspending.gov/award/CONT_AWD_FA441725F0278_9700_FA441724D0004_9700/
- FA248826FB008 (delivery order): $714,872, FA2488 Aftc Pzza Eglin. Construct Concrete Targets Do #12. https://www.usaspending.gov/award/CONT_AWD_FA248826FB008_9700_FA282324D0002_9700/
- FA248826FB006 (delivery order): $536,154, FA2488 Aftc Pzza Eglin. Construction Concrete Targets Do #11. https://www.usaspending.gov/award/CONT_AWD_FA248826FB006_9700_FA282324D0002_9700/
- FA248825FB013 (delivery order): $494,846, FA2488 Aftc Pzza Eglin. Construct Concrete Targets Requirements Contract Iaw: - Specifications C-VE-23-01 Dated 13 March 2023 - Drawings 23-TA-C74-01 R1 Dated 13 March 2023. https://www.usaspending.gov/award/CONT_AWD_FA248825FB013_9700_FA282324D0002_9700/
- FA441725F0206 (delivery order): $470,257, FA4417 1 Socons. Repair Hot Water Supply and Return Lines on the Building 1 Boiler. https://www.usaspending.gov/award/CONT_AWD_FA441725F0206_9700_FA441724D0004_9700/
- FA248825FB008 (delivery order): $398,264, FA2488 Aftc Pzza Eglin. Construct Concrete Targets Requirements Contract Iaw: - Specifications C-VE-23-01 Dated 13 March 2023- Drawings 23-TA-C74-01 R1 Dated 13 March 2023. https://www.usaspending.gov/award/CONT_AWD_FA248825FB008_9700_FA282324D0002_9700/
- FA248826FB003 (delivery order): $381,717, FA2488 Aftc Pzza Eglin. Construct Concrete Targets Requirements Contract Iaw: - Specifications C-VE-23-01 Dated 13 March 2023 - Drawings 23-TA-C74-01 R1 Dated 13 March 2023. https://www.usaspending.gov/award/CONT_AWD_FA248826FB003_9700_FA282324D0002_9700/
- FA441724F0123 (delivery order): $349,113, FA4417 1 Socons. The Work to Be Performed in Accordance with Sow to Include, But Not Limited To: 1. Crack Repairs Will Be Sealed with Backer Rod and Cold Applied Joint Seal.2. Spalls to Be Repaired Within Limits of the East Ramp and Runway as Shown on the Plans. https://www.usaspending.gov/award/CONT_AWD_FA441724F0123_9700_FA441721D0003_9700/
- FA441726F0027 (delivery order): $339,641, FA4417 1 Socons. Repair Spalls and Cracks in Accordance with the Attachments Listed in Section J. https://www.usaspending.gov/award/CONT_AWD_FA441726F0027_9700_FA441724D0004_9700/
- FA441724F0153 (delivery order): $304,758, FA4417 1 Socons. The Work Is But Not Limited to Repair, Replacement, and Minor Construction of Base Pavements, Water Distribution Systems, Wastewater Distribution Systems, and Other Related Work at Hurlburt Field, Fl.. https://www.usaspending.gov/award/CONT_AWD_FA441724F0153_9700_FA441721D0003_9700/
- FA441725F0222 (delivery order): $301,446, FA4417 1 Socons. This Is a Civil Works IDIQ Contract for Work Consisting Of, But Not Limited To, Repair, Replacement, and Minor Construction of Base Pavements, Water Distribution Systems, and Other Related Work at Hurlburt Field, Fl.. https://www.usaspending.gov/award/CONT_AWD_FA441725F0222_9700_FA441724D0004_9700/
- FA248825FB007 (delivery order): $276,780, FA2488 Aftc Pzza Eglin. Construct Concrete Targets Requirements Contract Iaw: - Specifications C-VE-23-01 Dated 13 March 2023- Drawings 23-TA-C74-01 R1 Dated 13 March 2023. https://www.usaspending.gov/award/CONT_AWD_FA248825FB007_9700_FA282324D0002_9700/
- FA441724F0127 (delivery order): $270,695, FA4417 1 Socons. The Contractor Shall Furnish All Labor, Materials, Tools, Supervision and Equipment and Perform All Operations Necessary to Repair VCP Sewer Lines Within Basin 2. the Project Is Located on Hurlburt Field, Fl.. https://www.usaspending.gov/award/CONT_AWD_FA441724F0127_9700_FA441724D0004_9700/
- FA248824FB001 (delivery order): $266,744, FA2488 Aftc Pzza Eglin. Construct Concrete Targets Do 03. https://www.usaspending.gov/award/CONT_AWD_FA248824FB001_9700_FA282324D0002_9700/
- FA248824FB003 (delivery order): $224,970, FA2488 Aftc Pzza Eglin. Construct Concrete Targets Requirements Contract Iaw: - Specifications C-VE-23-01 Dated 13 March 2023- Drawings 23-TA-C74-01 R1 Dated 13 March 2023. https://www.usaspending.gov/award/CONT_AWD_FA248824FB003_9700_FA282324D0002_9700/
- FA441725F0119 (delivery order): $195,824, FA4417 1 Socons. Repair Seven Stormwater Systems Around Hurlburt Field, Florida.. https://www.usaspending.gov/award/CONT_AWD_FA441725F0119_9700_FA441724D0004_9700/
- FA441725F0017 (delivery order): $195,381, FA4417 1 Socons. Repaint Runway Edge Lines. https://www.usaspending.gov/award/CONT_AWD_FA441725F0017_9700_FA441724D0004_9700/
- FA441724F0039 (delivery order): $180,783, FA4417 1 Socons. Repaint Edge Lines and Red Lines. https://www.usaspending.gov/award/CONT_AWD_FA441724F0039_9700_FA441721D0003_9700/
- FA441726F0015 (delivery order): $165,460, FA4417 1 Socons. CP1145982 Runway Rubber Removal 18/36. https://www.usaspending.gov/award/CONT_AWD_FA441726F0015_9700_FA441724D0004_9700/
- FA441725F0199 (delivery order): $161,290, FA4417 1 Socons. CP1144587 Eod Armag Work to Be Performed Under This Task Order Will Be in Accordance with the Statement of Work, Accepted Proposal and Drawings Attached in Section J.. https://www.usaspending.gov/award/CONT_AWD_FA441725F0199_9700_FA441724D0004_9700/
- FA441725F0020 (delivery order): $159,123, FA4417 1 Socons. This Is a Task Order Off of the Civil Works IDIQ Contract for Annual Rubber Removal Requirement. https://www.usaspending.gov/award/CONT_AWD_FA441725F0020_9700_FA441724D0004_9700/
- FA441725F0272 (delivery order): $140,793, FA4417 1 Socons. Contractor Shall Furnish All Plant, Labor, Equipment, Materials, Facilities, and Transportation Necessary to Repair Sewer Lines, Iaw the Drawings and Specifications.. https://www.usaspending.gov/award/CONT_AWD_FA441725F0272_9700_FA441724D0004_9700/
- FA441723F0124 (delivery order): $120,095, FA4417 1 Socons. Maintain Perimeter Fence. https://www.usaspending.gov/award/CONT_AWD_FA441723F0124_9700_FA441721D0003_9700/
- FA441723F0169 (delivery order): $112,546, FA4417 1 Socons. The Work Consists Of, But Not Limited To, Repair, Replacement, and Minor Construction of Base Pavements, Water Distribution Systems, Wastewater Distribution Systems, and Other Related Work at Hurlburt Field, FL in Accordance with the Documents Listed. https://www.usaspending.gov/award/CONT_AWD_FA441723F0169_9700_FA441721D0003_9700/
- FA441724F0359 (delivery order): $108,819, FA4417 1 Socons. The Contractor Shall Furnish All Labor, Materials, Tools, Supervision, and Equipment and Perform All Operations Necessary to Accomplish All Work Complete to Install Communications Infrastructure to Building 91360, Within Hurlburt Field, Fl.. https://www.usaspending.gov/award/CONT_AWD_FA441724F0359_9700_FA441724D0004_9700/
- FA441725F0262 (delivery order): $107,059, FA4417 1 Socons. This Is a Civil Works IDIQ Contract for Work Consisting Of, But Not Limited To, Repair, Replacement, and Minor Construction of Base Pavements, Water Distribution Systems, and Other Related Work at Hurlburt Field, Fl.. https://www.usaspending.gov/award/CONT_AWD_FA441725F0262_9700_FA441724D0004_9700/
- FA441724F0020 (delivery order): $106,220, FA4417 1 Socons. Remove Rubber on Runway 18/36 Fy 24. https://www.usaspending.gov/award/CONT_AWD_FA441724F0020_9700_FA441721D0003_9700/
- FA441726F0021 (delivery order): $85,891, FA4417 1 Socons. The Contractor Shall Remark/Repaint and Match All Exiting Striping as Indicated in the Work Description Within the Sow and as Shown on the Included Airfield Site Plan.. https://www.usaspending.gov/award/CONT_AWD_FA441726F0021_9700_FA441724D0004_9700/
- FA248825FB004 (delivery order): $74,430, FA2488 Aftc Pzza Eglin. Construct Concrete Targets Requirements Contract Iaw: - Specifications C-VE-23-01 Dated 13 March 2023- Drawings 23-TA-C74-01 R1 Dated 13 March 2023. https://www.usaspending.gov/award/CONT_AWD_FA248825FB004_9700_FA282324D0002_9700/
- FA441723F0320 (delivery order): $72,113, FA4417 1 Socons. At the Contractor'S Request and Ce'S Concurrence, This Modification Is a NO-COST Modification to Place a Suspension of Work on the Contract, Effective 1 February 2024.. https://www.usaspending.gov/award/CONT_AWD_FA441723F0320_9700_FA441721D0003_9700/
- FA441725F0211 (delivery order): $57,541, FA4417 1 Socons. The Contractor Shall Furnish All Labor, Materials, Tools, Supervision and Equipment and Perform All Operations Necessary to Repair by Replacement the Automatic Access Gate to the Flightline.. https://www.usaspending.gov/award/CONT_AWD_FA441725F0211_9700_FA441724D0004_9700/
- FA441724F0320 (delivery order): $41,635, FA4417 1 Socons. The Work Consists Of, But Not Limited To, Repair, Replacement, and Minor Construction of Base Pavements, Water Distribution Systems, Wastewater Distribution Systems, and Other Related Work at Hurlburt Field, Fl.. https://www.usaspending.gov/award/CONT_AWD_FA441724F0320_9700_FA441724D0004_9700/
- FA441725F0246 (delivery order): $35,470, FA4417 1 Socons. This Is a Civil Works IDIQ Contract for Work Consisting Of, But Not Limited To, Repair, Replacement, and Minor Construction of Base Pavements, Water Distribution Systems, and Other Related Work at Hurlburt Field, Fl.. https://www.usaspending.gov/award/CONT_AWD_FA441725F0246_9700_FA441724D0004_9700/
- FA441725F0116 (delivery order): $27,601, FA4417 1 Socons. Replace Two Concrete Slabs on Runway 18/36. https://www.usaspending.gov/award/CONT_AWD_FA441725F0116_9700_FA441724D0004_9700/
- FA441725F0106 (delivery order): $25,657, FA4417 1 Socons. Duke Field Runway Friction Test. https://www.usaspending.gov/award/CONT_AWD_FA441725F0106_9700_FA441724D0004_9700/
- FA441726F0033 (delivery order): $24,100, FA4417 1 Socons. Work Performed Under This Task Order Will Be in Accordance with the Statement of Work (Sow) and the Attachments in Section J.. https://www.usaspending.gov/award/CONT_AWD_FA441726F0033_9700_FA441724D0004_9700/
- FA441723F0132 (delivery order): $23,806, FA4417 1 Socons. Repair Spalls and Cracks Hurlburt Field FL. https://www.usaspending.gov/award/CONT_AWD_FA441723F0132_9700_FA441721D0003_9700/
- FA441724F0299 (delivery order): $11,826, FA4417 1 Socons. This Is a Civil Works IDIQ Contract for Work Consisting Of, But Not Limited To, Repair, Replacement, and Minor Construction of Base Pavements, Water Distribution Systems, and Other Related Work at Hurlburt Field, Fl.. https://www.usaspending.gov/award/CONT_AWD_FA441724F0299_9700_FA441724D0004_9700/
- FA441723F0110 (delivery order): $11,125, FA4417 1 Socons. Renovate Air Park for Public Access. https://www.usaspending.gov/award/CONT_AWD_FA441723F0110_9700_FA441721D0003_9700/
- FA282324F0065 (delivery order): $9,956, FA2823 Aftc Pzio. Construct Concrete Targets Do 02. https://www.usaspending.gov/award/CONT_AWD_FA282324F0065_9700_FA282324D0002_9700/
- FA441723F0188 (delivery order): $7,042, FA4417 1 Socons. Modification to Extend Pop and Lift Suspension.. https://www.usaspending.gov/award/CONT_AWD_FA441723F0188_9700_FA441721D0003_9700/
- FA248825FB001 (delivery order): $6,460, FA2488 Aftc Pzza Eglin. Construct Concrete Targets Requirements Contract Iaw: - Specifications C-VE-23-01 Dated 13 March 2023- Drawings 23-TA-C74-01 R1 Dated 13 March 2023. https://www.usaspending.gov/award/CONT_AWD_FA248825FB001_9700_FA282324D0002_9700/
- FA282324F0051 (delivery order): $1,000, FA2823 Aftc Pzio. Construct Concrete Targets IDIQ / Task Order 0001 / Kick Off Meeting. https://www.usaspending.gov/award/CONT_AWD_FA282324F0051_9700_FA282324D0002_9700/
- FA282323F0192 (delivery order): $0, FA2823 Aftc Pzio. Construct Concrete Target Delivery Order 17. https://www.usaspending.gov/award/CONT_AWD_FA282323F0192_9700_FA282321D0011_9700/
- FA441723F0167 (delivery order): $0, FA4417 1 Socons. At the Contractor'S Req and Ce'S Concurrence, This Modification Is a NO-COST Modification to Lift the Current Suspension of Work on the Contract, Effective 4 March 2024. the Period of Performance Will Be Extended from 25 Jan 2024 to 19 April 2024.. https://www.usaspending.gov/award/CONT_AWD_FA441723F0167_9700_FA441721D0003_9700/
- FA441723F0363 (delivery order): $0, FA4417 1 Socons. The Contractor Shall Furnish All Labor, Materials, Tools, Supervision and Equipment and Perform All Operations Necessary to Accomplish All Work Complete in Place, as Shown on the Drawings, Specified Herein, or as Needed to Repair the Stormwater Drain. https://www.usaspending.gov/award/CONT_AWD_FA441723F0363_9700_FA441721D0003_9700/
- FA282324D0002: $0, FA2823 Aftc Pzio. Construct Concrete Targets Requirements Contract Iaw: - Specifications C-VE-23-01 Dated 13 March 2023- Drawings 23-TA-C74-01 R1 Dated 13 March 2023. https://www.usaspending.gov/award/CONT_IDV_FA282324D0002_9700/
- FA441724D0004: $0, FA4417 1 Socons. This Is a Civil Works IDIQ Contract for Work Consisting Of, But Not Limited To, Repair, Replacement, and Minor Construction of Base Pavements, Water Distribution Systems, and Other Related Work at Hurlburt Field, Fl.. https://www.usaspending.gov/award/CONT_IDV_FA441724D0004_9700/
- FA441723F0176 (delivery order): -$2, FA4417 1 Socons. Repave Hamby PL. https://www.usaspending.gov/award/CONT_AWD_FA441723F0176_9700_FA441721D0003_9700/
- FA441723F0185 (delivery order): -$4,617, FA4417 1 Socons. VCP Sewer Repair. https://www.usaspending.gov/award/CONT_AWD_FA441723F0185_9700_FA441721D0003_9700/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://abierto.us/vendors/nwf-contractors-inc-f5ndarjlbkc6.