- Awards in window: 21 (70 transactions), $32,901,712 obligated, January 9, 2024 to September 1, 2026

## Awarding agencies

- National Institutes of Health: 21 awards, $32,901,712

## Industries

- 236220 Commercial and Institutional Building Construction: $32,901,712

## Competition

- Full and Open Competition: 21 awards

## Largest awards

- 75N99024F00002 (delivery order): $11,651,594, NIH a E Construction. C112359 - Repairs to Multi-Level Parking (Mlp) Garage 8. https://www.usaspending.gov/award/CONT_AWD_75N99024F00002_7529_75N99019D00022_7529/
- 75N99025F00005 (delivery order): $4,642,756, NIH a E Construction. C112535- Construction for Bldg. 8 & 8A Reheat and Terminal Unit Replacement- Phase 01. the Project Is to Replace the Reheat Components, from the Heat Exchangers to the Terminal Unit Reheat Coils Will Improve Occupants' Comfort.. https://www.usaspending.gov/award/CONT_AWD_75N99025F00005_7529_75N99019D00022_7529/
- 75N99024F00003 (delivery order): $4,188,809, NIH a E Construction. C104554 - Bldg. 8A AHU-5 and AHU-6 Replacement. https://www.usaspending.gov/award/CONT_AWD_75N99024F00003_7529_75N99019D00022_7529/
- 75N99022F00005 (delivery order): $2,292,720, NIH a E Construction. C110004 / C110005 / C110006 / C109358 - NLM Building 38 1ST Floor & Mezzanine Renovation Phase 2 and 3 Change Order #3 & #4 - 23 Sept 2022 - May 31, 2025. https://www.usaspending.gov/award/CONT_AWD_75N99022F00005_7529_75N99019D00022_7529/
- 75N99025F00004 (delivery order): $2,245,779, NIH a E Construction. C201447 - BLDG 40 RM B418 Niaid - Ahu 4 and 5 Replacement - Design Build Services .. https://www.usaspending.gov/award/CONT_AWD_75N99025F00004_7529_75N99019D00022_7529/
- 75N98026F00003 (delivery order): $1,154,133, National Institutes of Health Olao. Pca-Od-03021;c201690-Roof Replacement-B29b Section a. https://www.usaspending.gov/award/CONT_AWD_75N98026F00003_7529_75N99019D00022_7529/
- 75N99026F00002 (delivery order): $1,107,527, NIH a E Construction. C201899 - This Project Provides Design and Construction Services to Replace Ahu'S Control Valve and Dampers in Bldg. 49. Without This Project, Building Occupants Are at Risk for Loss of HVAC and Violation of Safety Codes.. https://www.usaspending.gov/award/CONT_AWD_75N99026F00002_7529_75N99019D00022_7529/
- 75N99021F00007 (delivery order): $1,089,747, NIH a E Construction. C103469 -Upgrade the Elevator System Into a New System (Traction System) Demolish the Existing Elevator Equipment & Repair the Elevator Pits - Lenin Andrade. https://www.usaspending.gov/award/CONT_AWD_75N99021F00007_7529_75N99019D00022_7529/
- 75N99025F00001 (delivery order): $995,861, NIH a E Construction. C112880 - Provide Potable Hot Water Options Study, Building 60. https://www.usaspending.gov/award/CONT_AWD_75N99025F00001_7529_75N99019D00022_7529/
- 75N99026F00001 (delivery order): $787,257, NIH a E Construction. C201667 - Perform Internal Integrity Inspection and Repairs to Comply with Api 650/653 and Ragagep Standards for the Cup Bulk Underground Fuel Oil Tank #1. Ktr: Steve O'Reilly Cor: Andrew Gomes Co: Chris Postek. https://www.usaspending.gov/award/CONT_AWD_75N99026F00001_7529_75N99019D00022_7529/
- 75N99025F00006 (delivery order): $574,819, NIH a E Construction. C201060 Project: Provide Construction Services to Convert an Existing Cit Server Room Into a Negative Microscopy Room. IT Involves Key Infrastructure Upgrades Essential for Biosafety, Biosecurity, Animal Healthcare & Research Continuity.. https://www.usaspending.gov/award/CONT_AWD_75N99025F00006_7529_75N99019D00022_7529/
- 75N99025F00002 (delivery order): $443,993, NIH a E Construction. Project Involves Infrastructure Upgrades Essential for Biosafety, Biosecurity, and Research Continuity.. https://www.usaspending.gov/award/CONT_AWD_75N99025F00002_7529_75N99019D00022_7529/
- 75N99024F00001 (delivery order): $435,898, NIH a E Construction. C116343 C115843: Building 6B and 33, Abatement of Noise from Equipment on Roof, NIH Bethesda Campus Cs: Chris Hsu Co: Bryan Burgee Cor: Earl Johnson. https://www.usaspending.gov/award/CONT_AWD_75N99024F00001_7529_75N99019D00022_7529/
- 75N99025F00003 (delivery order): $420,095, NIH a E Construction. The Contract Action Is Essential to Ensure Construction Activities Continue to Progress and Remain Compliant with All Safety, Regulatory, and Functional Specifications to Ensure the Facility Complies with the Highest Industry Standards.. https://www.usaspending.gov/award/CONT_AWD_75N99025F00003_7529_75N99019D00022_7529/
- 75N98026F00002 (delivery order): $294,794, National Institutes of Health Olao. Pca-Od-02451; C201761-Remediate Deficiencies in LN2 Building 50 RM 332. https://www.usaspending.gov/award/CONT_AWD_75N98026F00002_7529_75N99019D00022_7529/
- 75N99023F00002 (delivery order): $244,749, NIH a E Construction. C109665 (Construction Services) - Bldg. 10, Reconfigure Rms. 9N105-9N109 & Convert Bldg. 10, Rm. 9N101 to Tissue Culture Room with BSL2 Capacity - Archana Bhasin. https://www.usaspending.gov/award/CONT_AWD_75N99023F00002_7529_75N99019D00022_7529/
- 75N99020F00060 (delivery order): $169,017, NIH a E Construction. C105883 Description - Mod 14 to Incorporate Supplemental Work Outlined in the CO10 and CO11 Sows. Cor - Archana Bhasin Co - Dan Burk CS - David Seid Vendor Poc - Steve O'Reilly. https://www.usaspending.gov/award/CONT_AWD_75N99020F00060_7529_75N99019D00022_7529/
- 75N99023F00003 (delivery order): $93,613, NIH a E Construction. C112783 Building 35 Ninds Vivarium Systems Upgrades Change Order #1 Cor: Julianna Saviola. https://www.usaspending.gov/award/CONT_AWD_75N99023F00003_7529_75N99019D00022_7529/
- 75N99021F00016 (delivery order): $68,551, NIH a E Construction. C107062 - Building 82 Infrastructure Upgrades-Construction. https://www.usaspending.gov/award/CONT_AWD_75N99021F00016_7529_75N99019D00022_7529/
- 75N99023F00001 (delivery order): $0, NIH a E Construction. C112346 - Construction Services for DVR Installation of 3M Eto Sterilizer and Eo Abator, Building 14E No Cost Time Extension Cor: Chetna Gola Po: Tony Lee. https://www.usaspending.gov/award/CONT_AWD_75N99023F00001_7529_75N99019D00022_7529/
- 75N99019D00022: $0, NIH a E Construction. The Purpose of This Modification Is To: 1) Increase the Multiple Award Construction Ceiling from $2,000,000,000.00 to $2,500,000,000.00. All Other Terms and Conditions of the Contract Remain Unchanged and in Full Effect.. https://www.usaspending.gov/award/CONT_IDV_75N99019D00022_7529/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://abierto.us/vendors/new-age-development-group-llc-n6v9t93y6f25.