# NBT Construction and Supply, LLC

Canonical: https://abierto.us/vendors/nbt-construction-and-supply-llc-jyhar6ua4nh7

- UEI: JYHAR6UA4NH7
- CAGE: 7MHR7
- Location: Monticello, KY
- Awards in window: 11 (23 transactions), $9,083,659 obligated, April 11, 2024 to June 16, 2026

## Awarding agencies

- Federal Prison System / Bureau of Prisons: 6 awards, $5,885,553
- Department of the Air Force: 1 awards, $1,759,260
- Department of the Army: 1 awards, $931,071
- Department of Energy: 1 awards, $413,500
- Agricultural Research Service: 1 awards, $96,260
- National Park Service: 1 awards, -$1,985

## Industries

- 238220 Plumbing, Heating, and Air-Conditioning Contractors: $5,979,828
- 236220 Commercial and Institutional Building Construction: $2,172,760
- 238210 Electrical Contractors and Other Wiring Installation Contractors: $931,071

## Competition

- Full and Open Competition After Exclusion of Sources: 8 awards
- Competed Under SAP: 2 awards
- Full and Open Competition: 1 awards

## Solicitations won

- FCI Milan - Emergency Surface Blowdown Heat Recovery/DA Controls (15BBNF26B00000001), $2,750,260. https://abierto.us/opportunities/15bbnf26b00000001
- Emergency Replace B-Unit Chiller FPC Alderson (15BFA025B00000024), $710,260. https://abierto.us/opportunities/15bfa025b00000024
- Replace HVAC Andover System - USP Canaan (15BFA024B00000024), $979,260. https://abierto.us/opportunities/15bfa024b00000024
- FPC BRYAN- BOILER REPLACEMENT (15B50424Q00000001), $184,260. https://abierto.us/opportunities/15b50424q00000001
- Installation of Trane Chiller, Poplarville, MS (12405B24Q0320), $96,260. https://abierto.us/opportunities/12405b24q0320
- ELECTRICAL REHABILITATION ON CONTROL TOWER AT STILLWATER DAM STILLWATER LAKE, SUSQUEHANNA COUNTY, PENNYSYLVANIA (W912DR24B0011), $917,260. https://abierto.us/opportunities/w912dr24b0011
- Repair Power Plant Boilers- FCI La Tuna (15BFA024B00000019). https://abierto.us/opportunities/15bfa024b00000019
- Expand Existing Restrooms (FA940124B0005), $1,759,260. https://abierto.us/opportunities/fa940124b0005
- Boiler Re-tube at FCI Herlong- Award Notice (15BFA024B00000015), $604,260. https://abierto.us/opportunities/15bfa024b00000015
- Building 90 Site Compressed Air Equipment Upgrades (89243324RFE000085), $413,500. https://abierto.us/opportunities/89243324rfe000085

## Largest awards

- 15BBNF26C00000024 (definitive contract): $2,750,260, Building and Facilities (Fao). Fci Milan - Emergency Surface Blowdown Heat Recovery/Da Controls - 24Z4AY5. https://www.usaspending.gov/award/CONT_AWD_15BBNF26C00000024_1540_-NONE-_-NONE-/
- FA940124C0012 (definitive contract): $1,759,260, FA9401 377 MSG PK. B20204 Expand Existing Restrooms. https://www.usaspending.gov/award/CONT_AWD_FA940124C0012_9700_-NONE-_-NONE-/
- 15BFA025C00000011 (definitive contract): $986,764, Fao. Provision of All Materials, Labor, and Equipment to Complete the Project Replace HVAC Andover System at the United States Penitentiary (Usp Canaan) Located in Waymart, Pa.. https://www.usaspending.gov/award/CONT_AWD_15BFA025C00000011_1540_-NONE-_-NONE-/
- W912DR24C0031 (definitive contract): $931,071, W2SD Endist Baltimore. Clin 0001-Control Tower Electrical Rehab. https://www.usaspending.gov/award/CONT_AWD_W912DR24C0031_9700_-NONE-_-NONE-/
- 15BFA025C00000050 (definitive contract): $710,260, Fao. Emergency Replace B-Unit Chiller at the Federal Prison Camp at FPC Alderson. https://www.usaspending.gov/award/CONT_AWD_15BFA025C00000050_1540_-NONE-_-NONE-/
- 15BFA024C00000036 (definitive contract): $629,009, Fao. 24z5as5-Repair Power Plant Boilers at the Federal Correctional Institution La Tuna. https://www.usaspending.gov/award/CONT_AWD_15BFA024C00000036_1540_-NONE-_-NONE-/
- 15BFA024C00000027 (definitive contract): $604,260, Fao. 23Z6AN2- Fci Herlong- Boiler RE-TUBE. https://www.usaspending.gov/award/CONT_AWD_15BFA024C00000027_1540_-NONE-_-NONE-/
- 89243324CFE000086 (definitive contract): $413,500, National Energy Technology Laboratory. Building 90 Site Compressed Air Equipment Upgrades at Netl Pittsburgh, PA ***ira Funded***. https://www.usaspending.gov/award/CONT_AWD_89243324CFE000086_8900_-NONE-_-NONE-/
- 15B50424P00000094 (purchase order): $205,000, FPC Bryan. B&f-Fpc Bryan-Replace Chapel Boiler-24z5ar7 Replace Chapel Boiler. https://www.usaspending.gov/award/CONT_AWD_15B50424P00000094_1540_-NONE-_-NONE-/
- 12405B24C0031 (definitive contract): $96,260, USDA ARS Sea Aao Acq/Per Prop. Installation of Trane Chiller, Poplarville, MS. https://www.usaspending.gov/award/CONT_AWD_12405B24C0031_12H2_-NONE-_-NONE-/
- 140P5223C0002 (definitive contract): -$1,985, Ser West. Mod P00001 07.01.24 - Deobligating $1,984.88 and Extending Date to July 5TH, 2024 for Invoicing Only. All Other Terms and Conditions of Contract Remain the Same. Construction, Replace 3 Air Handler Units at ACC in Jean Lafitte NHP. https://www.usaspending.gov/award/CONT_AWD_140P5223C0002_1443_-NONE-_-NONE-/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://abierto.us/vendors/nbt-construction-and-supply-llc-jyhar6ua4nh7.
