# Midlands Mechanical, Inc.

Canonical: https://abierto.us/vendors/midlands-mechanical-inc-pu2hjlmr81a9

- UEI: PU2HJLMR81A9
- CAGE: 43M22
- Location: Omaha, NE
- Awards in window: 15 (26 transactions), $10,891,327 obligated, February 6, 2025 to August 7, 2026

## Awarding agencies

- United States Mint: 15 awards, $10,891,327

## Industries

- 236210 Industrial Building Construction: $10,820,424
- 238220 Plumbing, Heating, and Air-Conditioning Contractors: $70,903

## Competition

- Full and Open Competition: 15 awards

## Largest awards

- 2031JG25F00276 (delivery order): $5,151,044, US Mint Headquarters. DN Roof Replacement & Cornice Repair Project. https://www.usaspending.gov/award/CONT_AWD_2031JG25F00276_2044_2031JG21D00035_2044/
- 2031JG26F00054 (delivery order): $2,127,774, US Mint Headquarters. The Purpose of This Order Is for Construction of the IT Datacenter at the United States Mint-Denver. the Contractor Will Furnish the Necessary Labor, Material, and Equipment Per the Bidding Documents.. https://www.usaspending.gov/award/CONT_AWD_2031JG26F00054_2044_2031JG21D00035_2044/
- 2031JG26F00083 (delivery order): $2,031,603, US Mint Headquarters. Emergency & Critical Power Modernization. https://www.usaspending.gov/award/CONT_AWD_2031JG26F00083_2044_2031JG21D00035_2044/
- 2031JG25F00149 (delivery order): $905,830, US Mint Headquarters. To Construct and Commission an Iso 8 Clean Room as Well as All Utilities/Infrastructure Needed to Support Functionality and Operation of the Room Itself, the PVD Chamber, and the Supporting Equipment Inside and Outside of the Clean Room,. https://www.usaspending.gov/award/CONT_AWD_2031JG25F00149_2044_2031JG21D00035_2044/
- 2031JG25F00170 (delivery order): $261,049, US Mint Headquarters. DN Exterior Renovation. https://www.usaspending.gov/award/CONT_AWD_2031JG25F00170_2044_2031JG21D00035_2044/
- 2031JG25F00238 (delivery order): $130,682, US Mint Headquarters. The Purpose of This Order Is to Install Utilities for the New Annealing Furnace AF-02 at the United States Mint-Denver.. https://www.usaspending.gov/award/CONT_AWD_2031JG25F00238_2044_2031JG21D00035_2044/
- 2031JG25F00248 (delivery order): $112,949, US Mint Headquarters. The Purpose of This Order Is the Inspection and Mapping of Sanitary Sewer Pipes in the Basement and Subbasement at the United States Mint-Denver.. https://www.usaspending.gov/award/CONT_AWD_2031JG25F00248_2044_2031JG21D00035_2044/
- 2031JG22C00013 (definitive contract): $70,903, US Mint Headquarters. This Modification Incorporates Change Proposal Dated 7 January 2025 to 1) Demo Existing Ductwork and Plenum as Required and Replace Ductwork to Match Existing/New Ahu'S; and 2) Add Zip Board or Ridged Insulation to the Back of the MCC1.. https://www.usaspending.gov/award/CONT_AWD_2031JG22C00013_2044_-NONE-_-NONE-/
- 2031JG25F00182 (delivery order): $63,242, US Mint Headquarters. The Purpose of This Order Is to Install New Fan Coil Units (Fcus) in Two IT Rooms (Room 112A and Room 112 A/V Closet) at the United States Mint-Denver.. https://www.usaspending.gov/award/CONT_AWD_2031JG25F00182_2044_2031JG21D00035_2044/
- 2031JG25F00273 (delivery order): $27,182, US Mint Headquarters. The Purpose of This Order Is the Patching and Recoating of the Flooring for the Annealing Furnace Replacement Project at the United States Mint-Denver.. https://www.usaspending.gov/award/CONT_AWD_2031JG25F00273_2044_2031JG21D00035_2044/
- 2031JG23F00152 (delivery order): $9,069, US Mint Headquarters. Task Order 2031jg21d00035/2031jg23f00152- Utilities for N2 H2 Generators-Demolition of Exo Generator and Mezzanine-United States Mint- Denver This Modification Is to Incorporate Change Order Proposal Dated 28 January 2025 from Midlands Mechanical Fo. https://www.usaspending.gov/award/CONT_AWD_2031JG23F00152_2044_2031JG21D00035_2044/
- 2031JG23F00153 (delivery order): $0, US Mint Headquarters. The Purpose of This Modification Is to Extend the Pop End Date to 30 September 2025. All Other Terms and Conditions Remain Unchanged. https://www.usaspending.gov/award/CONT_AWD_2031JG23F00153_2044_2031JG21D00035_2044/
- 2031JG24F00437 (delivery order): $0, US Mint Headquarters. Tank 13 Roof the Purpose of This Modification Is to Extend the Period of Performance End Date to 30 September 2026. All Other Terms and Conditions Remain Unchanged.. https://www.usaspending.gov/award/CONT_AWD_2031JG24F00437_2044_2031JG21D00035_2044/
- 2031JG24F00438 (delivery order): $0, US Mint Headquarters. Vaf Filter This Modification Is to Extend the Pop End Date to 30 September 2026. All Other Terms and Conditions Remain Unchanged.. https://www.usaspending.gov/award/CONT_AWD_2031JG24F00438_2044_2031JG21D00035_2044/
- 2031JG21D00035: $0, US Mint Headquarters. Exercise Oy 4. https://www.usaspending.gov/award/CONT_IDV_2031JG21D00035_2044/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://abierto.us/vendors/midlands-mechanical-inc-pu2hjlmr81a9.