- Awards in window: 59 (152 transactions), $26,356,928 obligated, January 4, 2024 to June 3, 2026

## Awarding agencies

- Department of the Army: 51 awards, $24,364,902
- Federal Prison Industries / Unicor: 2 awards, $1,780,000
- Department of Veterans Affairs: 6 awards, $212,026

## Industries

- 236220 Commercial and Institutional Building Construction: $24,172,080
- 561210 Facilities Support Services: $2,059,042
- 561621 Security Systems Services (except Locksmiths): $70,290
- 238220 Plumbing, Heating, and Air-Conditioning Contractors: $55,516
- 237130 Power and Communication Line and Related Structures Construction: $0

## Competition

- Full and Open Competition After Exclusion of Sources: 46 awards
- Not Available for Competition: 9 awards
- Competed Under SAP: 4 awards

## Solicitations won

- AWARD NOTICE - 36C24525Q0049 - STEAM PIPING REPAIR PERRY POINT VA MEDICAL CENTER (36C24525Q0049), $55,516. https://abierto.us/opportunities/36c24525q0049
- Aberdeen Test Center - B384 Simulator (ISO213-24), $890,000. https://abierto.us/opportunities/iso21324
- 512-23-350 Radiography Site Prep B6 Rm01C (VA-24-00036224) (36C24524B0012), $182,452. https://abierto.us/opportunities/36c24524b0012

## Largest awards

- W56ZTN24F0057 (delivery order): $2,782,757, W6QK ACC-APG Dir. The Purpose of This Task Order Is to Provide Funding for Wr#im0001c3j - Building 311 Repair Water Infiltration. https://www.usaspending.gov/award/CONT_AWD_W56ZTN24F0057_9700_W56ZTN22D0001_9700/
- W56ZTN24F0109 (delivery order): $2,303,725, W6QK ACC-APG Dir. The Purpose of This Task Order Is to Provide Funding for Wr# Naf000073j, Naf000083j, Naf000093j, Naf000063j and Naf0000a3j - Remove/Replace Playground Pip Surface. the Pop Date for This Project Is 04/11/2025.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN24F0109_9700_W56ZTN22D0001_9700/
- W56ZTN25FA047 (delivery order): $1,996,891, W6QK ACC-APG Dir. Renovate the Existing Cooling and Heating System Within Building 4403.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN25FA047_9700_W56ZTN22D0001_9700/
- W56ZTN25FA061 (delivery order): $1,913,989, W6QK ACC-APG Dir. This Requirement Funds the Renovation the Existing Cooling and Heating System Within Building 2401AT Aberdeen Proving Ground, Maryland.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN25FA061_9700_W56ZTN22D0001_9700/
- W56ZTN25FA063 (delivery order): $1,611,145, W6QK ACC-APG Dir. Upgrade HVAC Bldg. 112. https://www.usaspending.gov/award/CONT_AWD_W56ZTN25FA063_9700_W56ZTN22D0001_9700/
- W56ZTN24F0036 (delivery order): $1,392,132, W6QK ACC-APG Dir. This Task Order Funds the Replacement of 33 Fan Coil Units on the 3RD Floor of Building 4401 at Aberdeen Proving Ground Md, Wr# CK000029J-02. https://www.usaspending.gov/award/CONT_AWD_W56ZTN24F0036_9700_W56ZTN22D0001_9700/
- W91CRB22F0298 (delivery order): $1,353,450, W6QK ACC-APG. Incremental Funding for Repairs. https://www.usaspending.gov/award/CONT_AWD_W91CRB22F0298_9700_W91CRB21D0027_9700/
- W56ZTN25FA036 (delivery order): $1,224,312, W6QK ACC-APG Dir. The Purpose of This Project Is to Remove the Existing Air-Cooled Chiller, and Two Air-Handlings Units Located in Two Separate Roof Top Penthouses and Replace the Units with New.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN25FA036_9700_W56ZTN22D0001_9700/
- W56ZTN23F0086 (delivery order): $1,023,568, W6QK ACC-APG Dir. This Modification Extends the Period of Performance to 26 April 2024, Wr# Mwb000023j.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN23F0086_9700_W56ZTN22D0001_9700/
- 15UC0C24F00002456 (delivery order): $890,000, Federal Prison Industries, INC. B384 Simulator HVAC Upgrades. https://www.usaspending.gov/award/CONT_AWD_15UC0C24F00002456_1542_15UC0C24D00002470_1542/
- 15UC0C24D00002470: $890,000, Federal Prison Industries, INC. B384 Simulator HVAC Upgrades. https://www.usaspending.gov/award/CONT_IDV_15UC0C24D00002470_1542/
- W56ZTN25FA039 (delivery order): $871,109, W6QK ACC-APG Dir. This Requirement Is for the Twelfth Phase of Life-Cycle Replacement for the Replacement or Removal of Various Above Ground Storage Tanks at Aberdeen Proving Ground, Maryland.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN25FA039_9700_W56ZTN22D0001_9700/
- W56ZTN25FA053 (delivery order): $715,436, W6QK ACC-APG Dir. Replace Steam/Heating Water System Replacement for Building 315 at the Intersection of Civil RD and Gillon ST in the Aberdeen Area of Aberdeen Proving Ground (Apg), Maryland.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN25FA053_9700_W56ZTN22D0001_9700/
- W56ZTN25F0084 (delivery order): $699,054, W6QK ACC-APG Dir. Roof Repair for Building 6007, Aberdeen Proving Ground.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN25F0084_9700_W56ZTN22D0001_9700/
- W56ZTN24F0158 (delivery order): $687,118, W6QK ACC-APG Dir. This Project Replaces the Inside and Outside Heating, Ventilation, and Air Conditioning Systems for Building 3074 on Aberdeen Proving Ground.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN24F0158_9700_W56ZTN22D0001_9700/
- W56ZTN25FA054 (delivery order): $644,695, W6QK ACC-APG Dir. This Requirement Funds the Replacement of the Fire Alarm Transmitting System at Adelphi Laboratory Center Installation.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN25FA054_9700_W56ZTN22D0001_9700/
- W56ZTN25FA027 (delivery order): $495,957, W6QK ACC-APG Dir. Repair Air Handler Unit (Ahu), Air Cooled Chiller, and Centrifugal Pumps.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN25FA027_9700_W56ZTN22D0001_9700/
- W56ZTN23F0100 (delivery order): $477,110, W6QK ACC-APG Dir. This Modification Extends the Performance to 15 November 2024 Due to Unforeseen Site Conditions Which Caused Delays in Removing the Grave Markers.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN23F0100_9700_W56ZTN22D0001_9700/
- W91CRB23F0169 (delivery order): $453,578, W6QK ACC-APG. Option Year One Exercise. https://www.usaspending.gov/award/CONT_AWD_W91CRB23F0169_9700_W91CRB21D0027_9700/
- W56ZTN26FA077 (delivery order): $426,032, W6QK ACC-APG Dir. Repair RE-HEAT Coil Bldg. E4110. https://www.usaspending.gov/award/CONT_AWD_W56ZTN26FA077_9700_W56ZTN22D0001_9700/
- W56ZTN24F0046 (delivery order): $403,636, W6QK ACC-APG Dir. This Task Order Funds for Wr# AM000060J - Repair Building Envelope A4502. https://www.usaspending.gov/award/CONT_AWD_W56ZTN24F0046_9700_W56ZTN22D0001_9700/
- W56ZTN24F0167 (delivery order): $364,088, W6QK ACC-APG Dir. The Purpose of This Task Order Is to Provide Funding for Wr# MT000113J - B5014 Repair HVAC System. the Total Funded Amount for This Project Is $364,088.36. the Pop Date Is 04/16/2025.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN24F0167_9700_W56ZTN22D0001_9700/
- W56ZTN25FA072 (delivery order): $308,278, W6QK ACC-APG Dir. Reline Approximately 600 - 1200 LF of 21-Inch Sewer Pipe from to This Is a Gravity Sewer with 3-5 Manholes.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN25FA072_9700_W56ZTN22D0001_9700/
- W56ZTN26FA052 (delivery order): $306,078, W6QK ACC-APG Dir. The Scope of This Project Consists of Providing All Plant, Labor, Materials and Equipment to Perform All Work Necessary to Repair/Renovate Building 743 to Repair the Doors, Walls and Loading Dock. This Is a Design Build Project. https://www.usaspending.gov/award/CONT_AWD_W56ZTN26FA052_9700_W56ZTN22D0001_9700/
- W56ZTN24F0054 (delivery order): $285,987, W6QK ACC-APG Dir. The Purpose of This Task Order Is to Providing Funding for Wr# IM000079J - Replace the Generator Located Behind the Building, and the Automatic Transfer Switch (Ats) Dedicated for the Edgewood Area Child Development Center Area E1901. https://www.usaspending.gov/award/CONT_AWD_W56ZTN24F0054_9700_W56ZTN22D0001_9700/
- W56ZTN24F0123 (delivery order): $275,466, W6QK ACC-APG Dir. This Task Order Funds Wr# Im0001e8j - Installation of Generator at the CDC in Apg Building E1902.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN24F0123_9700_W56ZTN22D0001_9700/
- W56ZTN24F0191 (delivery order): $254,454, W6QK ACC-APG Dir. This Project Is to Design and Replace the Sewer Lift Station Located Near Building 4056 on Edgewood Area Aberdeen Proving Ground. This Station Has Reached the End of Its Life-Span and Needs to Be Replaced for Normal, Safe Operations to Continue.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN24F0191_9700_W56ZTN22D0001_9700/
- W56ZTN19C0002 (definitive contract): $250,755, W6QK ACC-APG Dir. Exercise the 6-Month Option for Aberdeen Proving Ground Swimming Pool Maintenance Services to Ensure Pool Start Up and Maintenance Are Contracted for the Start of the Season.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN19C0002_9700_-NONE-_-NONE-/
- W56ZTN23F0099 (delivery order): $248,260, W6QK ACC-APG Dir. This Modification Extends the Period of Performance to 15 October 2024 Due to Unforeseen Site Conditions Causing Delays in Removing the Grave Markers. During Removal Most Grave Markers Broke, Therefore the Government Will Need to Order New Markers.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN23F0099_9700_W56ZTN22D0001_9700/
- W56ZTN26FA028 (delivery order): $191,038, W6QK ACC-APG Dir. Heat Exchanger/Tank Building 4507. https://www.usaspending.gov/award/CONT_AWD_W56ZTN26FA028_9700_W56ZTN22D0001_9700/
- 36C24524C0078 (definitive contract): $182,452, 245-Network Contract Office 5. Construction for Loch Raven Radiography Site Prep B6 Room 01C. https://www.usaspending.gov/award/CONT_AWD_36C24524C0078_3600_-NONE-_-NONE-/
- W56ZTN25F0034 (delivery order): $108,387, W6QK ACC-APG Dir. This Task Order Funds the Replacement of the Air-Cooled Condensing Unit at Building 4401, Wr# CK000029J- 03.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN25F0034_9700_W56ZTN22D0001_9700/
- W56ZTN24F0190 (delivery order): $100,541, W6QK ACC-APG Dir. The Project Replaces Older Generation Electrical Panels for the First and Second Floor of Building 5101 on Edgewood Area Aberdeen Proving Ground.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN24F0190_9700_W56ZTN22D0001_9700/
- W56ZTN24F0155 (delivery order): $76,926, W6QK ACC-APG Dir. This Project Replaces an Overhead Door at Building 2401 on Aberdeen Proving Ground for Safe and Normal Operations.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN24F0155_9700_W56ZTN22D0001_9700/
- W56ZTN25FA031 (delivery order): $75,198, W6QK ACC-APG Dir. Repair N-Field Bunker Building E1454 Aberdeen Proving Ground, Maryland. https://www.usaspending.gov/award/CONT_AWD_W56ZTN25FA031_9700_W56ZTN22D0001_9700/
- W91QV121P0022 (purchase order): $74,828, W6QM Micc-Ft Belvoir. Fire Alarm Monitoring - 2 Months Incremental Funding JAN-FEB 2024.. https://www.usaspending.gov/award/CONT_AWD_W91QV121P0022_9700_-NONE-_-NONE-/
- 36C24525P0115 (purchase order): $55,516, 245-Network Contract Office 5. Repair Steam Piping. https://www.usaspending.gov/award/CONT_AWD_36C24525P0115_3600_-NONE-_-NONE-/
- W911QX21F0136 (delivery order): $38,350, W6QK ACC-APG Adelphi. Construction Task Order to Renovate Building 4600 at Aberdeen Proving Ground, MD and Provide Utilities and Installation for the Big Magnet Project and Induction Heating Coil.. https://www.usaspending.gov/award/CONT_AWD_W911QX21F0136_9700_W911QX20D0005_9700/
- W56ZTN24F0029 (delivery order): $35,685, W6QK ACC-APG Dir. This Task Order Funds the Repair Overhang at Building E5100 at Aberdeen Proving Ground, Maryland -Wr# AS0000119J. https://www.usaspending.gov/award/CONT_AWD_W56ZTN24F0029_9700_W56ZTN22D0001_9700/
- W56ZTN23F0039 (delivery order): $14,882, W6QK ACC-APG Dir. This Modification Provides Prior Year Funding for Additional Work, Wr# AM000051J.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN23F0039_9700_W56ZTN22D0001_9700/
- W56ZTN24F0094 (delivery order): $6,181, W6QK ACC-APG Dir. This Task Order Is to Provide Funds for Bond Overrun on Bonding of $1M.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN24F0094_9700_W56ZTN18D0004_9700/
- 36C24521C0096 (definitive contract): $1,259, 245-Network Contract Office 5. Exercise Option Year 2. https://www.usaspending.gov/award/CONT_AWD_36C24521C0096_3600_-NONE-_-NONE-/
- 36C24523C0022 (definitive contract): $0, 245-Network Contract Office 5. Installation of Stanby Generator Units. https://www.usaspending.gov/award/CONT_AWD_36C24523C0022_3600_-NONE-_-NONE-/
- W56ZTN23F0024 (delivery order): $0, W6QK ACC-APG Dir. This Modification Extends the Period of Performance to 14 June 2024 Due to the Long Lead Time of Doah-1 Which Is Being Contributed to Global Supply Chain Issues. Wr# CK000029J-01. https://www.usaspending.gov/award/CONT_AWD_W56ZTN23F0024_9700_W56ZTN22D0001_9700/
- W56ZTN23F0094 (delivery order): $0, W6QK ACC-APG Dir. This Modification Extends the Period of Performance to 01 July 2024 Due to Warm Weather Requirements of the Construction Process.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN23F0094_9700_W56ZTN22D0001_9700/
- W56ZTN23F0103 (delivery order): $0, W6QK ACC-APG Dir. The Purpose of This Modification Is to Extend the Period of Performance to 30 August 2024 as a Result of the Extended Lead Time to Obtain the Light Fixtures and Poles as Well as the Current Weather Conditions.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN23F0103_9700_W56ZTN22D0001_9700/
- W56ZTN23F0129 (delivery order): $0, W6QK ACC-APG Dir. This Modification Extends the Period of Performance to 8 July 2024 So There Will Be No Interruptions in Heating During Heating Season While Replacing the Heating Oil Tanks.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN23F0129_9700_W56ZTN22D0001_9700/
- W56ZTN23F0143 (delivery order): $0, W6QK ACC-APG Dir. This Modification Extends the Period of Performance Due to Delays in the Design Drawings and Finding a Suitable Product to Use on the Tank Coating That Would Not React with the Chemicals Used in the Boiler Water Treatment.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN23F0143_9700_W56ZTN22D0001_9700/
- W56ZTN24F0009 (delivery order): $0, W6QK ACC-APG Dir. This Task Order Funds the Chiller Replacement at Building 1100F at Aberdeen Proving Ground, Wr# IE000011J.. https://www.usaspending.gov/award/CONT_AWD_W56ZTN24F0009_9700_W56ZTN22D0001_9700/
- W56ZTN24F0023 (delivery order): $0, W6QK ACC-APG Dir. This Modification Extends the Period of Performance to 15 April 2025 Due to the Long Lead Time for the New Chiller, Wr# IE000043J. https://www.usaspending.gov/award/CONT_AWD_W56ZTN24F0023_9700_W56ZTN22D0001_9700/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://abierto.us/vendors/mem-contracting-inc-xb5bhlmh8nn7.