# Massillon Construction and Supply LLC

Canonical: https://abierto.us/vendors/massillon-construction-and-supply-llc-pakmfj1m2t51

- UEI: PAKMFJ1M2T51
- CAGE: 5ME53
- Location: Canton, OH
- Awards in window: 26 (67 transactions), $26,395,867 obligated, January 30, 2024 to June 9, 2026

## Awarding agencies

- Department of the Army: 22 awards, $23,961,765
- National Park Service: 3 awards, $1,576,984
- Department of the Air Force: 1 awards, $857,118

## Industries

- 237990 Other Heavy and Civil Engineering Construction: $22,747,500
- 238220 Plumbing, Heating, and Air-Conditioning Contractors: $1,576,984
- 238160 Roofing Contractors: $1,149,595
- 236220 Commercial and Institutional Building Construction: $921,788
- 238990 All Other Specialty Trade Contractors: $0

## Competition

- Full and Open Competition After Exclusion of Sources: 22 awards
- Full and Open Competition: 4 awards

## Solicitations won

- Cooling System Replacement @ FILA (140P6426B0007), $583,118. https://abierto.us/opportunities/140p6426b0007
- Award Notice for W912QR25FA167: John T. Myers Tainter Gate Cable Connections Repairs - MATOC POOL ONLY (SMALL BUSINESS SET-ASIDE: W9123723D0004 - W9123723D0007) (W912QR25FA167), $4,274,000. https://abierto.us/opportunities/w912qr25fa123
- Fan Coil Unit Replacement @ FILA (140P6425B0004), $634,799. https://abierto.us/opportunities/140p6425b0004
- B409 ROOF REPAIR (W50S8R-25-B-A001), $1,124,629. https://abierto.us/opportunities/w50s8r25ba001
- Clendening Dam and Piedmont Lake Service Gate Replacements at Tippecanoe, Ohio and Piedmont, Ohio (W9123724B0002), $5,492,702. https://abierto.us/opportunities/w9123724b0002
- Renovate Hangar B295 (FA665624C0005), $837,629. https://abierto.us/opportunities/fa665624c0005
- Fan Coil Unit Repairs (140P6424B0007), $359,067. https://abierto.us/opportunities/140p6424b0007

## Largest awards

- W9123724C0005 (definitive contract): $5,467,242, W072 Endist Huntington. Gate Replace Clendening & Piedmont Lakes. Clendenning and Piedmont, Oh. https://www.usaspending.gov/award/CONT_AWD_W9123724C0005_9700_-NONE-_-NONE-/
- W912QR24F0283 (delivery order): $5,306,814, W072 Endist Louisville. Smithland Cable Connection Repair. https://www.usaspending.gov/award/CONT_AWD_W912QR24F0283_9700_W9123723D0004_9700/
- W9123725FA131 (delivery order): $3,444,669, W072 Endist Huntington. W81F8E52679810. https://www.usaspending.gov/award/CONT_AWD_W9123725FA131_9700_W9123722D0015_9700/
- W9123724F0147 (delivery order): $2,190,360, W072 Endist Huntington. Cam Bulkhead Crane Repair Base. https://www.usaspending.gov/award/CONT_AWD_W9123724F0147_9700_W9123722D0015_9700/
- W912QR25FA167 (delivery order): $2,001,000, W072 Endist Louisville. The Contractor Will Make the Necessary Repairs at John T. Myers Locks and Dam in Mt. Vernon, Indiana for Tainter Gate Cable Connection Replacements Per the Following: Attachments:statement of Work (Sow) - 0004 Specifications - 0005---------------. https://www.usaspending.gov/award/CONT_AWD_W912QR25FA167_9700_W9123723D0004_9700/
- W9123724F0285 (delivery order): $1,786,154, W072 Endist Huntington. The General Description of the Work Is to Furnish All Materials, Equipment, Labor, Layouts of Work Features, and Supervision Needed to Accomplish Work Related to the STP and Waterline Replacement at Frl.. https://www.usaspending.gov/award/CONT_AWD_W9123724F0285_9700_W9123722D0015_9700/
- W912QR25FA123 (delivery order): $1,236,368, W072 Endist Louisville. Cagles Mill Bridge Rehab Construction. https://www.usaspending.gov/award/CONT_AWD_W912QR25FA123_9700_W9123723D0004_9700/
- W50S8R25CA001 (definitive contract): $1,149,595, W7NU Uspfo Activity Ohang 179. B409 Roof Repair. https://www.usaspending.gov/award/CONT_AWD_W50S8R25CA001_9700_-NONE-_-NONE-/
- FA665624C0005 (definitive contract): $857,118, FA6656 910 Aw LGC Yngstn WRN Arpt. Project Zqel 24-0005 Renovate Hangar B295 for C-130J Conversion. All Work Shall Be Done as Per Specifications Dated 8 May 2024 and Drawings Dated 13 December 2023 in Section J.. https://www.usaspending.gov/award/CONT_AWD_FA665624C0005_9700_-NONE-_-NONE-/
- 140P6425C0007 (definitive contract): $634,799, MWR Ohio. Other Construction, Fan Coil Unit Replacement @ Fila. https://www.usaspending.gov/award/CONT_AWD_140P6425C0007_1443_-NONE-_-NONE-/
- 140P6426C0006 (definitive contract): $583,118, MWR Ohio. Eo 14398 - Construction, Cooling System Replacement @ Fila. https://www.usaspending.gov/award/CONT_AWD_140P6426C0006_1443_-NONE-_-NONE-/
- W9123724F0291 (delivery order): $522,666, W072 Endist Huntington. The General Description of the Work Is to Furnish All Materials, Equipment, Labor, Layouts of Work Features, and Supervision Needed to Accomplish Work Related to the Base Task Order for Cleaning and Painting Low Flow Gates at Acs.. https://www.usaspending.gov/award/CONT_AWD_W9123724F0291_9700_W9123722D0015_9700/
- W9123724F0252 (delivery order): $468,543, W072 Endist Huntington. Greenfield Levee Separate Relief Well and Pump Station. https://www.usaspending.gov/award/CONT_AWD_W9123724F0252_9700_W9123722D0015_9700/
- 140P6424C0007 (definitive contract): $359,067, MWR Ohio. Other Construction, Fan Coil Unit Repairs. https://www.usaspending.gov/award/CONT_AWD_140P6424C0007_1443_-NONE-_-NONE-/
- W9123723F0302 (delivery order): $183,244, W072 Endist Huntington. A00001 - Service Gate Side Seal Removal Tom Jenkins Dam, Glouster, Oh. https://www.usaspending.gov/award/CONT_AWD_W9123723F0302_9700_W9123722D0015_9700/
- W9123725FA124 (delivery order): $80,813, W072 Endist Huntington. W81F8E52619237. https://www.usaspending.gov/award/CONT_AWD_W9123725FA124_9700_W9123722D0015_9700/
- W9123724F0033 (delivery order): $79,627, W072 Endist Huntington. Mod A00001 Conduit and Crack Reapir, Winfield, WV. https://www.usaspending.gov/award/CONT_AWD_W9123724F0033_9700_W9123722D0015_9700/
- W9136423C0002 (definitive contract): $64,670, W7NU Uspfo Activity Oh Arng. Remove Dfars Clause 252.204-7020 as IT Is Not Applicable to This Contract.. https://www.usaspending.gov/award/CONT_AWD_W9136423C0002_9700_-NONE-_-NONE-/
- W9123726FA017 (delivery order): $5,000, W072 Endist Huntington. Guaranteed Amount Task Order-Massillon. https://www.usaspending.gov/award/CONT_AWD_W9123726FA017_9700_W9123722D0015_9700/
- W9123723F0328 (delivery order): $0, W072 Endist Huntington. No Cost Time Extension Modification to Extend Contract Completion to 28 February 2025 Due to Delays in the Production Lead Time of 200AMP Disconnect Necessary to Complete Requirements in the Sow.. https://www.usaspending.gov/award/CONT_AWD_W9123723F0328_9700_W9123722D0015_9700/
- W9136423C0004 (definitive contract): $0, W7NU Uspfo Activity Oh Arng. Remove Clause. https://www.usaspending.gov/award/CONT_AWD_W9136423C0004_9700_-NONE-_-NONE-/
- W9123722D0015: $0, W072 Endist Huntington. Various Small Construction Projects Within the Boundaries of the Great Lakes and Ohio River Division, Exercise Option Period 2. https://www.usaspending.gov/award/CONT_IDV_W9123722D0015_9700/
- W9123723D0004: $0, W072 Endist Huntington. Modification to Exercise Option Period 2 Design BID-BUILD (Dbb) Land Construction Within the Rivers Districts (Huntington, Louisville, Nashville, and Pittsburgh).. https://www.usaspending.gov/award/CONT_IDV_W9123723D0004_9700/
- W9123723F0296 (delivery order): -$5,000, W072 Endist Huntington. SB Construction Matoc Deobligation of Option Year 1. https://www.usaspending.gov/award/CONT_AWD_W9123723F0296_9700_W9123722D0015_9700/
- W9123722F0309 (delivery order): -$10,000, W072 Endist Huntington. Deobligation of Guaranteed Amount. https://www.usaspending.gov/award/CONT_AWD_W9123722F0309_9700_W9123722D0015_9700/
- W9123722F0328 (delivery order): -$10,000, W072 Endist Huntington. Deobligation of Guaranteed Amount. https://www.usaspending.gov/award/CONT_AWD_W9123722F0328_9700_W9123718D0011_9700/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://abierto.us/vendors/massillon-construction-and-supply-llc-pakmfj1m2t51.