- Awards in window: 16 (51 transactions), $21,842,968 obligated, January 17, 2024 to September 14, 2026

## Awarding agencies

- Forest Service: 11 awards, $18,358,889
- Federal Highway Administration: 3 awards, $1,993,869
- Department of the Army: 1 awards, $1,312,270
- Federal Aviation Administration: 1 awards, $177,940

## Industries

- 237310 Highway, Street, and Bridge Construction: $15,415,239
- 237990 Other Heavy and Civil Engineering Construction: $4,902,177
- 236220 Commercial and Institutional Building Construction: $1,525,552

## Competition

- Full and Open Competition After Exclusion of Sources: 12 awards
- Not Available for Competition: 2 awards
- Not Competed Under SAP: 1 awards
- Not Competed: 1 awards

## Solicitations won

- La Mina Trail Reconstruction DB Project (12445225R0030), $11,931,160. https://abierto.us/opportunities/12445225r0030
- Justification for Exception to Fair Opportunity (1138737), $10,000,000. https://abierto.us/opportunities/12445224d0012

## Largest awards

- 12445225C0030 (definitive contract): $11,931,160, Usda-Fs, Csa East 12. La Mina Trail Reconstruction DB Project. https://www.usaspending.gov/award/CONT_AWD_12445225C0030_12C2_-NONE-_-NONE-/
- 12445224C0025 (definitive contract): $4,902,177, Usda-Fs, Csa East 12. Repairs to Thirteen (13) Damaged Trail Sites. the Govt. Furnished a Design-Bid-Build to a Total of Nine (9) of the Damaged Sites, Miscellaneous Trail Spot Surfacing to Approx. Two (2) Sites, and the Remaining Last Two (2) Sites Will Require a Contrac. https://www.usaspending.gov/award/CONT_AWD_12445224C0025_12C2_-NONE-_-NONE-/
- 693C7323C000014 (definitive contract): $1,765,983, 693C73 Eastern Fed Lands Division. PR Er DOT PRMNT RPR (19) CM #1 Increase Contract Amount by $47,025.00 No Change to Contract Time. https://www.usaspending.gov/award/CONT_AWD_693C7323C000014_6925_-NONE-_-NONE-/
- W912C325CA012 (definitive contract): $1,312,270, W6QM Micc-Fort Buchanan (Rc). Toro Creek Gate Repair. https://www.usaspending.gov/award/CONT_AWD_W912C325CA012_9700_-NONE-_-NONE-/
- 12445223C0019 (definitive contract): $455,099, Usda-Fs, Csa East 12. Purpose: the Purpose of This Modification Is to Extend the Period of Performance.. https://www.usaspending.gov/award/CONT_AWD_12445223C0019_12C2_-NONE-_-NONE-/
- 12445225F0043 (delivery order): $432,560, Usda-Fs, Csa East 12. Phase 1 Water Well Drilling Comprehensive Water Quality Assessment & Existing Surface Water System Maintenance. https://www.usaspending.gov/award/CONT_AWD_12445225F0043_12C2_12445224D0012_12C2/
- 12445024F0026 (delivery order): $237,200, Usda-Fs, Csa East 10. Emergency Tropical Storm Ernesto Debris Clearing Equipment and Services. https://www.usaspending.gov/award/CONT_AWD_12445024F0026_12C2_12445224D0012_12C2/
- 693C7323C000011 (definitive contract): $227,885, 693C73 Eastern Fed Lands Division. PR Er DOT PRMNT RPR (20) CM #1 Increase Contract Amount by $115,218.21. https://www.usaspending.gov/award/CONT_AWD_693C7323C000011_6925_-NONE-_-NONE-/
- 697DCK25C00042 (definitive contract): $177,940, 697DCK Regional Acquisitions SVCS. Embankment Stabilization and Riprap Installation for QJQ Arsr Access Road. https://www.usaspending.gov/award/CONT_AWD_697DCK25C00042_6920_-NONE-_-NONE-/
- 12445225F0056 (delivery order): $127,130, Usda-Fs, Csa East 12. Emergency Iitf & SFRS HVAC Systems Replacement. https://www.usaspending.gov/award/CONT_AWD_12445225F0056_12C2_12445224D0012_12C2/
- 12445224F0014 (delivery order): $104,685, Usda-Fs, Csa East 12. Palo Colorado Water Well Performance Testing and Pump Replacement.. https://www.usaspending.gov/award/CONT_AWD_12445224F0014_12C2_12445224D0012_12C2/
- 12445225F0018 (delivery order): $70,488, Usda-Fs, Csa East 12. Bisley Road Access Is Blocked by a Big Landslide That Prevent the Gate to Open and Block the Pass for Any Vehicle. the Contractor Shall Be Responsible for Cleaning the Existing Landslide Material and Disposing Legally to a Landfill and Re-Establishin. https://www.usaspending.gov/award/CONT_AWD_12445225F0018_12C2_12445224D0012_12C2/
- 12445224F0005 (delivery order): $66,390, Usda-Fs, Csa East 12. Catalina Entrance Accessibility Project. https://www.usaspending.gov/award/CONT_AWD_12445224F0005_12C2_12445224D0012_12C2/
- 12445225F0014 (delivery order): $32,000, Usda-Fs, Csa East 12. Moratorium Exception New Cell Phone Boosters. Exception Request Form Is Uploaded in Supporting Documents Section. Thanks.. https://www.usaspending.gov/award/CONT_AWD_12445225F0014_12C2_12445224D0012_12C2/
- 693C7321C000019 (definitive contract): $0, 693C73 Eastern Fed Lands Division. The Purpose of This No Cost Administrative Modification Is to Financially and Contractually Close This Contract in Its Entirety in the Amount of $2,886,025.68.. https://www.usaspending.gov/award/CONT_AWD_693C7321C000019_6925_-NONE-_-NONE-/
- 12445224D0012: $0, Usda-Fs, Csa East 12. El Yunque National Forest Facilities Maintenance and Construction Idiq- Puerto Rico Mod 001- Exercise Option Period 1. https://www.usaspending.gov/award/CONT_IDV_12445224D0012_12C2/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://abierto.us/vendors/jpi-construction-llc-jhbncgnqs367.