# Houser Walker Architecture, LLC

Canonical: https://abierto.us/vendors/houser-walker-architecture-llc-z3nzn3df9ca4

- UEI: Z3NZN3DF9CA4
- CAGE: 5AJB7
- Location: Atlanta, GA
- Awards in window: 9 (11 transactions), $946,341 obligated, February 17, 2026 to August 18, 2026

## Awarding agencies

- National Park Service: 4 awards, $783,526
- Public Buildings Service: 5 awards, $162,815

## Industries

- 541310 Architectural Services: $719,270
- 541330 Engineering Services: $227,070

## Competition

- Full and Open Competition After Exclusion of Sources: 8 awards
- Not Competed: 1 awards

## Solicitations won

- Scoping & Design to protect Fort Caroline Memorial (0044042044), $410,849. https://abierto.us/opportunities/0044042044
- BISC REPAIR BOCA CHITA SHORELINE EROSION (140PS126C0002), $64,255. https://abierto.us/opportunities/140ps126c0002

## Largest awards

- 140P2025F0003 (delivery order): $1,943,865, DSC Contracting Services Division. Saju 317505 Repair Historic Walls of Park Fortifications A-E Design Services for Predesign (Pd), Schematic Design (Sd) Documents and Supplemental Services. https://www.usaspending.gov/award/CONT_AWD_140P2025F0003_1443_140P2022D0013_1443/
- 140PS126F0056 (delivery order): $410,849, Doi, NPS Conops Strategic. Fort Caroline Memorial Relocation. https://www.usaspending.gov/award/CONT_AWD_140PS126F0056_1443_140P2022D0013_1443/
- 140P2026F0168 (delivery order): $308,421, DSC Contracting Services Division. Bicr 316236 A/E SRVS - Title III - Rehab. https://www.usaspending.gov/award/CONT_AWD_140P2026F0168_1443_140P2022D0013_1443/
- 47PE0225F0006 (delivery order): $94,051, PBS R4 Amd Southern Branch. Extend Pop 180 Days - Limestone Repair S&D Services. https://www.usaspending.gov/award/CONT_AWD_47PE0225F0006_4740_47PE0119D0003_4740/
- 47PE0224F0017 (delivery order): $73,023, PBS R4 Amd Southern Branch. Modification Is to Extend the Contract Completion Date to 8/1/2025 This Change Should Be Performed to Allow the Architect-Engineer Contractor Additional Time to Perform Construction Administration Services. Tuttle Usca Chamber Ga. https://www.usaspending.gov/award/CONT_AWD_47PE0224F0017_4740_47PE0119D0003_4740/
- 140PS126C0002 (definitive contract): $64,255, Doi, NPS Conops Strategic. Bisc Repair Boca Chita Shoreline Erosion. https://www.usaspending.gov/award/CONT_AWD_140PS126C0002_1443_-NONE-_-NONE-/
- 140P2023F0378 (delivery order): $49,758, DSC Contracting Services Division. Malu 318172 Rehab 501 Auburn Ave. Title III Services During Construction Phase of Rehabilitation of Martin Luther King Jr. Birth Home Purpose of Mod P0003 Is to Change the Period of Performance End Date from January 31, 2025 to March 31, 2025. https://www.usaspending.gov/award/CONT_AWD_140P2023F0378_1443_140P2022D0013_1443/
- 47PE0224F0035 (delivery order): $36,512, PBS R4 Amd Southern Branch. The Purpose of This Modification Is to Add Construction Administration Services to the Tuttle Usca Av IT Courtroom Upgrade HP Design Services Project in Atlanta, Ga.. https://www.usaspending.gov/award/CONT_AWD_47PE0224F0035_4740_47PE0119D0003_4740/
- 140P2024F0234 (delivery order): $15,269, DSC Contracting Services Division. Timu 335784 - Architectural & Engineering (Ae) Design Services for Predesign (Pd) and Schematic Design (Sd) Documents, Provide Climate Change Mitigations for Fort Caroline Exhibit, Timucuan Ecological and Historic Preserve, Jacksonville, FL. https://www.usaspending.gov/award/CONT_AWD_140P2024F0234_1443_140P2022D0013_1443/
- 140P5224F0035 (delivery order): $1,400, Ser West. Mod P0001 Supplement Aggreement for Work Within Scope AE Title II SVS Design Boardwalks FT Pickens R5323240014 DD + CD & Supplemental Services (Topographical Survey/Geotechnical Investigation and Report). https://www.usaspending.gov/award/CONT_AWD_140P5224F0035_1443_140P2022D0013_1443/
- 140P2024F0038 (delivery order): $0, DSC Contracting Services Division. The Purpose of Modification P00002 Is Extend the Period of Performance End Date of 09/12/2024 to 04/30/2025.. https://www.usaspending.gov/award/CONT_AWD_140P2024F0038_1443_140P2022D0013_1443/
- 140P5224F0005 (delivery order): $0, Ser West. Modification to Extend the Period of Performance. Engineering Services to Develop Construction Documents to Repair and Rehab the MT Locust Historic House.. https://www.usaspending.gov/award/CONT_AWD_140P5224F0005_1443_140P2022D0013_1443/
- 47PE0224F0189 (delivery order): $0, PBS R4 Amd Southern Branch. Pop Extension Ira Lec Window Replacement Columbus Post Office and U.S. Courthouse.. https://www.usaspending.gov/award/CONT_AWD_47PE0224F0189_4740_47PE0119D0003_4740/
- 47PE0224F0190 (delivery order): $0, PBS R4 Amd Southern Branch. Pop Extension Ira Lec Window Replacement William Bootle Federal Building and U.S. Courthouse.. https://www.usaspending.gov/award/CONT_AWD_47PE0224F0190_4740_47PE0119D0003_4740/
- 47PE0724F0237 (delivery order): $0, PBS R4 Amd Gulf Coast Branch. Mod to Extend the Period of Performance to Allow for GSA AE to Reveiw and Approval Submittals.. https://www.usaspending.gov/award/CONT_AWD_47PE0724F0237_4740_47PE0119D0003_4740/
- 140P2022D0013: $0, DSC Contracting Services Division. Ser Arch SB - Houser Walker Architects Modification 6 to Exercise All Remaining Option Years 3 and 4. Additionally, Insert Clause FAR 52.204-30 Federal Acquisition Supply Chain Act Orders Prohibition (Dec 2023).. https://www.usaspending.gov/award/CONT_IDV_140P2022D0013_1443/
- 47PE0119D0003: $0, PBS R4 Amd Blue Ridge West Branch. Mass Modification to Incorporate the Applicable Deviated Versions (See Class Deviations CD-2025-04 (February 15, 2025) and CD-2025-05 with Supplement 1 (March 7, 2025) for the Architect and Engineer Services (A&e) Indefinite Delivery Indefinite Quantity (Idiq) for Zone B - the State of Georgia. https://www.usaspending.gov/award/CONT_IDV_47PE0119D0003_4740/
- 47PE0218F0144 (delivery order): -$5,308, PBS R4 Amd Southern Branch. De-Obligation Mod Uscis Design Team Summit Federal Building Atlanta Ga. https://www.usaspending.gov/award/CONT_AWD_47PE0218F0144_4740_GS04P13BVD0009_4740/
- 140P5423F0054 (delivery order): -$17,000, Ser South Mabo. The Purpose of This Unilateral Contract Modification Is to Deobligate the Remaining Funding in the Amount of $17,000, Bringing the Contract to a Close. All Work Has Been Confirmed Completed and Accepted by the Contract Cor. All Other Terms and Condit. https://www.usaspending.gov/award/CONT_AWD_140P5423F0054_1443_140P2022D0013_1443/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://abierto.us/vendors/houser-walker-architecture-llc-z3nzn3df9ca4.
