# Facet Nw, Inc.

Canonical: https://abierto.us/vendors/facet-nw-inc-fhbfhv8jyt93

- UEI: FHBFHV8JYT93
- CAGE: 4CZY1
- Location: Seattle, WA
- Awards in window: 21 (43 transactions), $1,092,254 obligated, February 14, 2024 to August 25, 2026

## Awarding agencies

- National Park Service: 15 awards, $673,319
- Bureau of Land Management: 2 awards, $237,496
- U.S. Fish and Wildlife Service: 2 awards, $109,779
- Forest Service: 2 awards, $71,660

## Industries

- 541330 Engineering Services: $1,092,254
- 339950 Sign Manufacturing: $0

## Competition

- Full and Open Competition After Exclusion of Sources: 20 awards
- Competed Under SAP: 1 awards

## Solicitations won

- WHIS 349892 - Crystal Creek Rd Slope Stabilization, PD and Scoping (140P2026F0147), $55,077. https://abierto.us/opportunities/140p2026f0147
- GOGA COASTAL TRAIL SLIDE REPAIR TITLE I A&E Servic (140PS126F0028), $130,071. https://abierto.us/opportunities/140ps126f0028

## Largest awards

- 140L4326F0067 (delivery order): $167,570, Oregon State Office. Gaoa_elk_cc_water_ph1_ae. https://www.usaspending.gov/award/CONT_AWD_140L4326F0067_1422_140F0822D0220_1448/
- 140PS126F0028 (delivery order): $148,240, Doi, NPS Conops Strategic. Goga Coastal Trail Slide Repair Title I A&e Services. https://www.usaspending.gov/award/CONT_AWD_140PS126F0028_1443_140F0822D0220_1448/
- 140P8525F0107 (delivery order): $111,343, PWR Sf/Sea Mabo. Title I Preliminary and Schematic Design Services, Moore Road Waterline Replacement, Golden Gate National Recreation Area. https://www.usaspending.gov/award/CONT_AWD_140P8525F0107_1443_140F0822D0220_1448/
- 140FC323F0023 (delivery order): $109,779, Fws, Construction A/E Team 3. CA-DESFB Nwr- Eec Concept Design. https://www.usaspending.gov/award/CONT_AWD_140FC323F0023_1448_140F0822D0220_1448/
- 140P8524F0162 (delivery order): $94,869, PWR Sf/Sea Mabo. Title I Topographic Survey and Mapping Services, Sunrise Water System Rehabilitation, Mount Rainier National Park, Sunrise, Washington. https://www.usaspending.gov/award/CONT_AWD_140P8524F0162_1443_140F0822D0220_1448/
- 140P8526F0090 (delivery order): $89,571, PWR Sf/Sea Mabo. Title I Scoping Services to Support Pd/Sd - Rehabilitate Sunrise Septic System - Pmis Number 302091. https://www.usaspending.gov/award/CONT_AWD_140P8526F0090_1443_140F0822D0220_1448/
- 140P8524F0173 (delivery order): $75,366, PWR Sf/Sea Mabo. Title II - Design Development and Final Construction Document Services - Replace Warehouse Fire Hydrants - Pmis 315466. https://www.usaspending.gov/award/CONT_AWD_140P8524F0173_1443_140F0822D0220_1448/
- 1282A724F0012 (delivery order): $71,660, USDA Forest Service. Wolf Creek JC - Water Intake Structure Conceptual Design. https://www.usaspending.gov/award/CONT_AWD_1282A724F0012_12C2_140F0822D0220_1448/
- 140L4325F0147 (delivery order): $69,925, Oregon State Office. Wildwood Water System Improvements, Northwest District, Oregon. https://www.usaspending.gov/award/CONT_AWD_140L4325F0147_1422_140F0822D0220_1448/
- 140P2026F0147 (delivery order): $55,077, DSC Contracting Services Division. Whis 349892 - Crystal Creek RD Slope Stabilization, PD and Scoping. https://www.usaspending.gov/award/CONT_AWD_140P2026F0147_1443_140F0822D0220_1448/
- 140P8525F0149 (delivery order): $46,852, PWR Sf/Sea Mabo. Title I Condition Assessment Services - Perform Condition Assessment on Beaches Water System - Pmis 346123 - Golden Gate National Recreation, Ca. https://www.usaspending.gov/award/CONT_AWD_140P8525F0149_1443_140F0822D0220_1448/
- 140P8525F0016 (delivery order): $33,096, PWR Sf/Sea Mabo. Title III Construction Management Services - Rehabilitate Hurricane Ridge Water System - Pmis 306966 & 307067 - Olympic National Park, Wa. https://www.usaspending.gov/award/CONT_AWD_140P8525F0016_1443_140F0822D0220_1448/
- 140P8522F0113 (delivery order): $18,905, PWR Sf/Sea Mabo. Olym-Hurricane Ridge Water - Title II Modification P00001 Is to Provide Additional Funding as a Result of a Revised Scope Due to the Hurricane Ridge Day Lodge Fire Which Significantly Delayed the Project. Option Year 4 Rates Are Also Being Utilize. https://www.usaspending.gov/award/CONT_AWD_140P8522F0113_1443_140P8519D0002_1443/
- 1240BH23F0098 (delivery order): $0, Usda-Fs, Csa Northwest 6. Great American Outdoors Act Wish Poosh and Kachess Campground Improvements Okanogan-Wenatchee National Forest Cle Elum Ranger District Kittitas Country, Wa. https://www.usaspending.gov/award/CONT_AWD_1240BH23F0098_12C2_140F0822D0220_1448/
- 140P8322P0086 (purchase order): $0, PWR Olym Mabo. Whitman Mission Wayside Panels; the Purpose of This Modification P00002 Is to Process a Novation Agreement and Change the Uei of Record from the Watershed Company (Uei Hypqy6gpu5w8) to Facet Nw, INC (Uei Fhbfhv8jyt93). There Are No Other Changes.. https://www.usaspending.gov/award/CONT_AWD_140P8322P0086_1443_-NONE-_-NONE-/
- 140P8520F0094 (delivery order): $0, PWR Sf/Sea Mabo. The Purpose of This Modification Is to Extend the Period of Performance End Date to Allow for Successful Completion of Project.. https://www.usaspending.gov/award/CONT_AWD_140P8520F0094_1443_140P8519D0002_1443/
- 140P8522F0048 (delivery order): $0, PWR Sf/Sea Mabo. Title III AE Services Rehabilitate Heart 'O the Hills Water and Wastewater Systems. https://www.usaspending.gov/award/CONT_AWD_140P8522F0048_1443_140P8519D0002_1443/
- 140P8523F0147 (delivery order): $0, PWR Sf/Sea Mabo. Rehabilitate Sunrise Potable Water System Supply Lines Modification P00001 Is for a No Cost Time Extension from 6/14/2024 to 8/31/2025. the Extension Is Needed to Complete the Preliminary Design, Value Analysis and Schematic Design Reports in ACC. https://www.usaspending.gov/award/CONT_AWD_140P8523F0147_1443_140P8519D0002_1443/
- 140P8523F0184 (delivery order): $0, PWR Sf/Sea Mabo. Title II Design Development and Final Construction Documents Services, Replace Laguna Water Treatment Facility & TIE-IN Replacement Well & Supply Lines, Point Reyes National Seashore. Modification P00001 for a No Cost Time Extension from 7. https://www.usaspending.gov/award/CONT_AWD_140P8523F0184_1443_140P8519D0002_1443/
- 140P8524F0001 (delivery order): $0, PWR Sf/Sea Mabo. Title III Construction Management Services, Replace Retaining Wall Between Bocce Court and Van Ness Avenue, San Francisco Maritime National Historic Park, California the Purpose of Modification P00001 Is for a No Cost Time Extension from 12/16/202. https://www.usaspending.gov/award/CONT_AWD_140P8524F0001_1443_140P8519D0002_1443/
- 140F0822D0220: $0, Fws, Gaoa. The Purpose of This Modification Is to Ensure Compliance with Updated Federal Guidance and to Eliminate Non-Statutory Sustainability Requirements, as Well as Enhance the Representational and Certification Clauses Within the Contract, Clarify Ordering. https://www.usaspending.gov/award/CONT_IDV_140F0822D0220_1448/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://abierto.us/vendors/facet-nw-inc-fhbfhv8jyt93.
