# Clark Construction Group LLC

Canonical: https://abierto.us/vendors/clark-construction-group-llc-qqbxqr679km9

- UEI: QQBXQR679KM9
- CAGE: 075M7
- Parent: Clark Construction LLC
- Location: Bethesda, MD
- Awards in window: 5 (16 transactions), $40,281,985 obligated, June 17, 2026 to September 4, 2026

## Awarding agencies

- Public Buildings Service: 1 awards, $36,698,807
- Federal Prison System / Bureau of Prisons: 1 awards, $1,059,716
- Department of the Army: 1 awards, $1,051,682
- Smithsonian Institution: 1 awards, $766,608
- National Institutes of Health: 1 awards, $705,172

## Industries

- 236220 Commercial and Institutional Building Construction: $40,281,985

## Competition

- Full and Open Competition: 5 awards

## Largest awards

- 47PM0024C0001 (definitive contract): $36,698,807, PBS R11 Construction Services Divsion. Building 1 Construction, St. Elizabeth'S West Campus, Washington, DC Se. This Modification Incorporates Various Change Orders for Additional Work for the Project.. https://www.usaspending.gov/award/CONT_AWD_47PM0024C0001_4740_-NONE-_-NONE-/
- 15B70023C00000008 (definitive contract): $1,059,716, Privatization - Co. 1) the Project Contract Completion Date Was Established in Mod 4 as July 8, 2026, And, by This Modification, Hereby Extends the Final Completion Date by 45 Days to Friday, August 21, 2026. Eo 14398.. https://www.usaspending.gov/award/CONT_AWD_15B70023C00000008_1540_-NONE-_-NONE-/
- W9126G24C0004 (definitive contract): $1,051,682, W076 Endist FT Worth. Design and Construction New Veterans Affairs (Va) New Health Care Center in El Paso Texas. https://www.usaspending.gov/award/CONT_AWD_W9126G24C0004_9700_-NONE-_-NONE-/
- 33330222CF0010453 (definitive contract): $766,608, Smithsonian Institution. Construction of Pod 6 Located at the Smithsonian Institution'S Museum Support Center. https://www.usaspending.gov/award/CONT_AWD_33330222CF0010453_3300_-NONE-_-NONE-/
- 75N99025F00001 (delivery order): $705,172, NIH a E Construction. C104688 Mod. P00004 Is for Rfi# 03.1 South Storm Drain and RFI #80.4 Missing Drainpipe at South Retaining Wall Structure 9. Without This Change, the Project Will Not Complete and Usable.. https://www.usaspending.gov/award/CONT_AWD_75N99025F00001_7529_75N99019D00015_7529/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://abierto.us/vendors/clark-construction-group-llc-qqbxqr679km9.