# Bruch & Bruch Construction, Inc.

Canonical: https://abierto.us/vendors/bruch-and-bruch-construction-inc-e6sdfsh9ylk9

- UEI: E6SDFSH9YLK9
- CAGE: 1FKG9
- Location: Port Angeles, WA
- Awards in window: 9 (19 transactions), $5,417,108 obligated, March 11, 2024 to August 19, 2026

## Awarding agencies

- Federal Highway Administration: 2 awards, $3,689,207
- Forest Service: 5 awards, $1,728,871
- National Park Service: 2 awards, -$969

## Industries

- 237310 Highway, Street, and Bridge Construction: $5,418,078
- 115310 Support Activities for Forestry: $0
- 212321 Construction Sand and Gravel Mining: -$969

## Competition

- Full and Open Competition After Exclusion of Sources: 6 awards
- Competed Under SAP: 2 awards

## Solicitations won

- WA ERFO FS OLYMP609 2022-1(1), Olympic FS ERFO Repairs 2022 (69056725B000016), $3,475,869. https://abierto.us/opportunities/69056725b000016

## Largest awards

- 69056726C000006 (definitive contract): $3,765,501, 690567 Western Federal Lands Div. Funds Construction Project Wa Erfo FS Olymp609 2022-1(1), Olympic FS Erfo Repairs 2022. Work Includes Roadway Reconstruction, Culvert Upsizing and Replacement, Slope Stabilization, Embankment Repair, Special Rock Embankment, and Reinforced Soil Slope. https://www.usaspending.gov/award/CONT_AWD_69056726C000006_6925_-NONE-_-NONE-/
- 1240BJ24F0039 (delivery order): $1,202,276, Usda-Fs, Csa Northwest 7. This Project Consists of Roadway Reconditioning, Asphalt Placement, and Temporary Traffic Control in Preparation of the Traveled Way for Asphalt Paving on the Current Gravel Section of Approximately 1.5MI of National Forest System Road (Nfsr) 2300000. https://www.usaspending.gov/award/CONT_AWD_1240BJ24F0039_12C2_1240BH23D0035_12C2/
- 1240BJ26F0016 (delivery order): $498,435, Usda-Fs, Csa Northwest 7. Placement of Aggregate Surfacing Which Includes Preparing Roadway Surface, Hauling, Placing Compacting and Finishing Crushed Aggregate Surfacing. https://www.usaspending.gov/award/CONT_AWD_1240BJ26F0016_12C2_1240BH23D0035_12C2/
- 1240BH23F0109 (delivery order): $28,160, Usda-Fs, Csa Northwest 6. Road Construction R6 IDIQ Gifford Pinchot and Olympic National Forests - 29 RD Olympic Seed Task Order. https://www.usaspending.gov/award/CONT_AWD_1240BH23F0109_12C2_1240BH23D0035_12C2/
- 1240BD23A0013: $0, Usda-Fs, Csa Northwest 2. The Mod Purpose Is to Incorporate the Mandatory Clause FAR 52.222 90, Addressing Dei Discrimination by Federal Contractors, as Required by E.O. 14398.. https://www.usaspending.gov/award/CONT_IDV_1240BD23A0013_12C2/
- 1240BH23D0035: $0, Usda-Fs, Csa Northwest 6. Road Construction R6 IDIQ Gifford Pinchot and Olympic National Forests.. https://www.usaspending.gov/award/CONT_IDV_1240BH23D0035_12C2/
- 140P8323F0047 (bpa call): -$22, PWR Olym Mabo. Epref, Modification 2: De-Obligate $0.11 Reported as an Undelivered Order (Udo) to Prepare BPA Call for Close-Out. Modification 1: Add Funds for Actual Quantities Delivered and Accepted So Vendor Can Submit Final Invoices in Ipp, Change Payment Term. https://www.usaspending.gov/award/CONT_AWD_140P8323F0047_1443_140P8318A0003_1443/
- 140P8323F0052 (bpa call): -$948, PWR Olym Mabo. Modification 2: De-Obligate $947.67 Excess Funds After Final Payment. Modification 1: Increase Price for Actual Qty Delivered for Final Invoice to Be Paid. Original Description: This BPA Call No. 54 Is Awarded in Accordance with the Terms of BPA No.. https://www.usaspending.gov/award/CONT_AWD_140P8323F0052_1443_140P8318A0003_1443/
- 69056723C000019 (definitive contract): -$76,294, 690567 Western Federal Lands Div. Wa Flap Jeffer 150009(1), Undi Road Bypass Improvements. Closeout Mod. https://www.usaspending.gov/award/CONT_AWD_69056723C000019_6925_-NONE-_-NONE-/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://abierto.us/vendors/bruch-and-bruch-construction-inc-e6sdfsh9ylk9.