# Blue World Construction Inc.

Canonical: https://abierto.us/vendors/blue-world-construction-inc-jer6ppwg4mh7

- UEI: JER6PPWG4MH7
- CAGE: 86XX5
- Location: Florham Park, NJ
- Awards in window: 12 (30 transactions), -$5,511,501 obligated, January 31, 2024 to September 11, 2026

## Awarding agencies

- Bureau of Land Management: 2 awards, $2,332,655
- Forest Service: 1 awards, $165,699
- Department of the Army: 1 awards, $58,150
- Department of Veterans Affairs: 1 awards, $34,740
- National Park Service: 7 awards, -$8,102,745

## Industries

- 237990 Other Heavy and Civil Engineering Construction: $2,332,655
- 237310 Highway, Street, and Bridge Construction: $115,000
- 332312 Fabricated Structural Metal Manufacturing: $58,150
- 236220 Commercial and Institutional Building Construction: $50,000
- 325120 Industrial Gas Manufacturing: $34,740
- 238330 Flooring Contractors: $10,198
- 237110 Water and Sewer Line and Related Structures Construction: -$8,112,244

## Competition

- Competed Under SAP: 6 awards
- Full and Open Competition After Exclusion of Sources: 3 awards
- Full and Open Competition: 3 awards

## Solicitations won

- ASIS - REHABILITATE MD DEVELOPED ZONE WATER SYSTEM (140P4326R0008), $2,325,000. https://abierto.us/opportunities/140p4326r0008
- 127EAX26Q0016 Nogales Waterline Connection - Coronado NF (127EAX26Q0016), $152,500. https://abierto.us/opportunities/127eax26q0016
- GATE-REPLACE BEARINGS & END SHAFTS-WWTP (140P4526R0016). https://abierto.us/opportunities/140p4526r0016
- FAIRBANK TRAIL ADA MAINTENANCE AND IMPROVEMENTS (140L0624R0039), $190,992. https://abierto.us/opportunities/140l0624r0039
- GAOA GILA BOX CAMPGROUND IMPROVEMENTS (140L0624R0032), $2,141,663. https://abierto.us/opportunities/140l0624r0032
- GATE 318738 DB STIPEND FOR UNSUCCESSFUL (140P2024P0015), $50,000. https://abierto.us/opportunities/140p2024p0015
- SAGUARO NATIONAL PARK ROAD GRADING & REPAIR (140P1524Q0044). https://abierto.us/opportunities/140p1524q0044

## Largest awards

- 140P4326C0018 (definitive contract): $2,325,000, Ner Services Mabo. Rehabilitate Maryland Developed Zone Water Distribution System at Assateague Island National Seashore. https://www.usaspending.gov/award/CONT_AWD_140P4326C0018_1443_-NONE-_-NONE-/
- 140L0624C0014 (definitive contract): $2,141,663, National Operations Center. Gaoa Gila Box Campground Improvements. https://www.usaspending.gov/award/CONT_AWD_140L0624C0014_1422_-NONE-_-NONE-/
- 140P2023C0025 (definitive contract): $435,100, DSC Contracting Services Division. Gate 291531 - Rehab Ft. Hancock Potable Water & Wastewater System. https://www.usaspending.gov/award/CONT_AWD_140P2023C0025_1443_-NONE-_-NONE-/
- 140L0624C0022 (definitive contract): $190,992, National Operations Center. Fairbank Trail Ada Maintenance and Improvements. https://www.usaspending.gov/award/CONT_AWD_140L0624C0022_1422_-NONE-_-NONE-/
- 127EAX26P0004 (purchase order): $165,699, Usda-Fs, Csa Southwest 7. Connect the Nogales Administrative Site to Municipal Water.. https://www.usaspending.gov/award/CONT_AWD_127EAX26P0004_12C2_-NONE-_-NONE-/
- 140P1524P0089 (purchase order): $115,000, Imr Arizona. Saguaro National Park Road Grading & Repair. https://www.usaspending.gov/award/CONT_AWD_140P1524P0089_1443_-NONE-_-NONE-/
- 140P4526C0011 (definitive contract): $96,000, Ner Supply Mabo. Gate-Replace Bearings & End Shafts-Wwtp. https://www.usaspending.gov/award/CONT_AWD_140P4526C0011_1443_-NONE-_-NONE-/
- W50S6W22P0004 (purchase order): $58,150, W7M1 Uspfo Activity Dcang 113. Northern Structure Brace Replacement. https://www.usaspending.gov/award/CONT_AWD_W50S6W22P0004_9700_-NONE-_-NONE-/
- 140P2024P0015 (purchase order): $50,000, DSC Contracting Services Division. Gate 318738 DB Stipend for Unsuccessful. https://www.usaspending.gov/award/CONT_AWD_140P2024P0015_1443_-NONE-_-NONE-/
- 36C24420C0125 (definitive contract): $34,740, 244-Network Contract Office 4. Micro Bulk Oxygen Tank Rental and Oxygen Fills. https://www.usaspending.gov/award/CONT_AWD_36C24420C0125_3600_-NONE-_-NONE-/
- 140P1523C0008 (definitive contract): $10,198, Imr Arizona. The Reason for This Bilaterial Modification #2 Is to Extend the Period of Performance from 3/1/2024 to 7/1/2024, Additional Days to Allow for Production and Installation of Additional Pavers. Additional Funds Added to the Contract Per Proposal for TH. https://www.usaspending.gov/award/CONT_AWD_140P1523C0008_1443_-NONE-_-NONE-/
- 140P2023C0123 (definitive contract): -$11,134,043, DSC Contracting Services Division. Bibe 317515 Replace Park Water System Modification 1. https://www.usaspending.gov/award/CONT_AWD_140P2023C0123_1443_-NONE-_-NONE-/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://abierto.us/vendors/blue-world-construction-inc-jer6ppwg4mh7.
