# Blue Cord Design and Construction, LLC

Canonical: https://abierto.us/vendors/blue-cord-design-and-construction-llc-wrv2fr811m24

- UEI: WRV2FR811M24
- CAGE: 5US82
- Location: Orlando, FL
- Awards in window: 13 (17 transactions), $55,527,473 obligated, June 22, 2026 to September 8, 2026

## Awarding agencies

- Department of Veterans Affairs: 13 awards, $55,527,473

## Industries

- 236220 Commercial and Institutional Building Construction: $54,592,154
- 237110 Water and Sewer Line and Related Structures Construction: $935,320

## Competition

- Full and Open Competition After Exclusion of Sources: 11 awards
- Not Available for Competition: 1 awards
- Competed Under SAP: 1 awards

## Solicitations won

- Correct Site Structural Deficiencies (36C24626R0042), $3,786,379. https://abierto.us/opportunities/36c24626r0042
- 675-106 Expand Radiology & Oncology Minor Construction - Lake Nona (36C77626R0035), $19,850,316. https://abierto.us/opportunities/36c77626r0035
- AWARD NOTICE 36C25626C0046- Renovate Sterile Processing Services (SPS)- Solicitation (36C25626C0046), $33,547,044. https://abierto.us/opportunities/36c25626c0046

## Largest awards

- 36C25626C0046 (definitive contract): $30,995,241, 256-Network Contract Office 16. 564-19-403 Renovate Sterile Processing Services (Sps), Fayetteville, Ar 72703. Pop 720 Calendar Days from Ntp. Eo 14398. https://www.usaspending.gov/award/CONT_AWD_36C25626C0046_3600_-NONE-_-NONE-/
- 36C77626C0071 (definitive contract): $19,850,316, Pcac. Contractor Shall Prepare Site for Building Operations, Including Demolition & Removal of Existing Structures, Furnish Labor & Materials, and Perform Work for Expand Radiology & Oncology at the Orlando Vamc as Required by Drawings & Specs. Eo 14398.. https://www.usaspending.gov/award/CONT_AWD_36C77626C0071_3600_-NONE-_-NONE-/
- 36C24626C0053 (definitive contract): $3,786,379, 246-Network Contracting Office 6. Construction Services to Correct Site Structural Deficiencies. https://www.usaspending.gov/award/CONT_AWD_36C24626C0053_3600_-NONE-_-NONE-/
- 36C24826C0027 (definitive contract): $754,544, 248-Network Contract Office 8. Chilled Water Line Repair at Orlando Vamc - Lake Nona Campus. https://www.usaspending.gov/award/CONT_AWD_36C24826C0027_3600_-NONE-_-NONE-/
- 36C24825C0037 (definitive contract): $180,776, 248-Network Contract Office 8. Mod P00003 Adds Clauses FAR 52.222-90, Vaar 852.204-70, Vaar 852.204-72, Vaar 852.222-71. https://www.usaspending.gov/award/CONT_AWD_36C24825C0037_3600_-NONE-_-NONE-/
- 36C24825C0021 (definitive contract): $150,161, 248-Network Contract Office 8. Construction Services, Renovate Lake Nona Building 2 for Emergency Department and Observation Unit, Project 675-23-100. https://www.usaspending.gov/award/CONT_AWD_36C24825C0021_3600_-NONE-_-NONE-/
- 36C24825C0048 (definitive contract): $120,131, 248-Network Contract Office 8. P00001 Class Deviation - Add Vaar Clauses 852.204-70 & 852.204-72 BB Correct Electrical Deficiencies 573A4-21-710. https://www.usaspending.gov/award/CONT_AWD_36C24825C0048_3600_-NONE-_-NONE-/
- 36C24621C0040 (definitive contract): $0, 246-Network Contracting Office 6. New Po for Expiring Funds. https://www.usaspending.gov/award/CONT_AWD_36C24621C0040_3600_-NONE-_-NONE-/
- 36C24823C0040 (definitive contract): $0, 248-Network Contract Office 8. Renovate 4B for Hemodialysis P00010 - Time Extension. https://www.usaspending.gov/award/CONT_AWD_36C24823C0040_3600_-NONE-_-NONE-/
- 36C24826N0357 (delivery order): $0, 248-Network Contract Office 8. P0001: Time Ext Adding 90 Calendar Day. https://www.usaspending.gov/award/CONT_AWD_36C24826N0357_3600_36C24823D0030_3600/
- 36C25625C0044 (definitive contract): $0, 256-Network Contract Office 16. The Purpose of This Modification Is to Implement the Associated Class Deviation Signed April 23,2026, Which Prescribes Mandatory Inclusion of FAR 52.222-90, Addressing Dei Discrimination by Federal Contractors (Apr 2026).. https://www.usaspending.gov/award/CONT_AWD_36C25625C0044_3600_-NONE-_-NONE-/
- 36C77625C0085 (definitive contract): $0, Pcac. Contractor Shall Prepare Site for Building Operations, Including Demolition, Removal of Existing Structures, Furnish Labor and Materials, and Perform Work for 675-103 Create Cardiovascular Center Lake Nona Project as Required by Drawings and Specs.. https://www.usaspending.gov/award/CONT_AWD_36C77625C0085_3600_-NONE-_-NONE-/
- 36C24825C0038 (definitive contract): -$310,074, 248-Network Contract Office 8. BB Upgrade Building One Sanitary Riser. https://www.usaspending.gov/award/CONT_AWD_36C24825C0038_3600_-NONE-_-NONE-/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://abierto.us/vendors/blue-cord-design-and-construction-llc-wrv2fr811m24.