# Beardsley Design Associates Architecture, Engineering, Landscape Architecture, D.P.C.

Canonical: https://abierto.us/vendors/beardsley-design-associates-architecture-engineering-landscape-architecture-d-p-nrxdrvqfqem8

- UEI: NRXDRVQFQEM8
- CAGE: 4W703
- Location: Auburn, NY
- Awards in window: 7 (24 transactions), $684,641 obligated, February 14, 2025 to September 4, 2026

## Awarding agencies

- U.S. Fish and Wildlife Service: 3 awards, $379,200
- Public Buildings Service: 3 awards, $237,941
- Forest Service: 1 awards, $67,500

## Industries

- 541330 Engineering Services: $379,200
- 541310 Architectural Services: $305,441

## Competition

- Full and Open Competition After Exclusion of Sources: 7 awards

## Largest awards

- 140FGA23F0022 (delivery order): $379,200, Fws, Gaoa. A/E Design Ny FWS Mntzma NWR Multipurpose Facility. https://www.usaspending.gov/award/CONT_AWD_140FGA23F0022_1448_140F0822D0200_1448/
- 47PC0224F0066 (delivery order): $123,467, PBS R2 Repair and Alterations Branch. Contract Mod to Add Site Visit for Assessment of the Existing Fire Alarm System, Add Effort Outside of Their Original Sow and Add Time Extension with No Added Cost to the Contractor. Fire Alarm Project, Leo W Obrien Fob, Albany, Ny.. https://www.usaspending.gov/award/CONT_AWD_47PC0224F0066_4740_47PC0322D0001_4740/
- 47PC0224F0062 (delivery order): $114,474, PBS R2 Repair and Alterations Branch. Redesign of HVAC and Removal of Ira Requirements. https://www.usaspending.gov/award/CONT_AWD_47PC0224F0062_4740_47PC0322D0001_4740/
- 12445526C0006 (definitive contract): $67,500, Usda-Fs, Csa East 13. Contract to Provide Engineering Services to Provide Structural Assessments/Analysis, Design/Plan Development, and Preparation of Construction Documents for the Repair of Glastenbury & Stratton Lookout Towers.. https://www.usaspending.gov/award/CONT_AWD_12445526C0006_12C2_-NONE-_-NONE-/
- 140FC223F0012 (delivery order): $0, Fws, Construction A/E Team 2. WV-NATL Conserv Trng-Wastewater Tertiary Treatment Design. https://www.usaspending.gov/award/CONT_AWD_140FC223F0012_1448_140F0822D0200_1448/
- 140F0822D0200: $0, Fws, Gaoa. The Purpose of This Modification Is to Ensure Compliance with Updated Federal Guidance and to Eliminate Non-Statutory Sustainability Requirements, as Well as Enhance the Representational and Certification Clauses Within the Contract, Clarify Ordering. https://www.usaspending.gov/award/CONT_IDV_140F0822D0200_1448/
- 47PC0322D0001: $0, PBS R2 Capital Construction Branch. Administrative Modification to Change Contracting Officer.. https://www.usaspending.gov/award/CONT_IDV_47PC0322D0001_4740/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://abierto.us/vendors/beardsley-design-associates-architecture-engineering-landscape-architecture-d-p-nrxdrvqfqem8.