- Awards in window: 20 (56 transactions), $26,773,923 obligated, January 16, 2024 to June 5, 2026

## Awarding agencies

- Department of the Army: 20 awards, $26,773,923

## Industries

- 237990 Other Heavy and Civil Engineering Construction: $26,579,823
- 332312 Fabricated Structural Metal Manufacturing: $177,400
- 811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance: $16,700

## Competition

- Full and Open Competition After Exclusion of Sources: 14 awards
- Full and Open Competition: 5 awards
- Not Competed Under SAP: 1 awards

## Solicitations won

- Hoist Replacement at Nolin River Lake (W912QR25BA014), $873,500. https://abierto.us/opportunities/w912qr25ba014
- Repair Tainter Valves at Various Locations (W912BV25R0003), $8,449,260. https://abierto.us/opportunities/w912bv25r0003
- 4 Corners Hydraulic System Replacement for Hannibal Locks and Dam (W911WN25BA003), $11,049,000. https://abierto.us/opportunities/w911wn25ba003
- STILLWATER DAM GATE REPAIR (W912DR24R0055), $2,615,400. https://abierto.us/opportunities/w912dr24r0055

## Largest awards

- W911WN25CA007 (definitive contract): $11,049,000, W072 Endist Pittsburgh. W81ET451080897. https://www.usaspending.gov/award/CONT_AWD_W911WN25CA007_9700_-NONE-_-NONE-/
- W912BV25C0011 (definitive contract): $8,480,107, W076 Endist Tulsa. Repair Tainter Valves at Chouteau, Newt Graham, and W.D. Mayo Locks and Dams, Oklahoma.. https://www.usaspending.gov/award/CONT_AWD_W912BV25C0011_9700_-NONE-_-NONE-/
- W912DR25C0006 (definitive contract): $2,615,400, W2SD Endist Baltimore. Intake Repairs, Conduit Repairs and Service for Stillwater Dam. https://www.usaspending.gov/award/CONT_AWD_W912DR25C0006_9700_-NONE-_-NONE-/
- W9123825F0084 (delivery order): $1,020,000, W075 Endist Sacramento. Dam Maintenance Repair Multiple Award Task Order Contract (Matoc) Buchannan Dam Tower Recoating. https://www.usaspending.gov/award/CONT_AWD_W9123825F0084_9700_W9123823D0012_9700/
- W912QR25CA016 (definitive contract): $937,528, W072 Endist Louisville. Nolin Hoist Replacement. https://www.usaspending.gov/award/CONT_AWD_W912QR25CA016_9700_-NONE-_-NONE-/
- W9123825F0066 (delivery order): $856,250, W075 Endist Sacramento. Installation of Permanent Sump Pumps at Isabella Auxillary Dam.. https://www.usaspending.gov/award/CONT_AWD_W9123825F0066_9700_W9123823D0012_9700/
- W9123822F0032 (delivery order): $829,009, W075 Endist Sacramento. Surface Preparation. https://www.usaspending.gov/award/CONT_AWD_W9123822F0032_9700_W9123818D0014_9700/
- W9123823F0079 (delivery order): $618,296, W075 Endist Sacramento. Isabella Bulkhead Gate Recoating. Contract # W91238-23-D-0012, Delivery Order # W91238-23-F-0079.R00002 CD003 6 Month Contract Time Extension. Total Change in Contract Time in Increased by 182 Days and Completion Date Shall Change to April 21, 2025.. https://www.usaspending.gov/award/CONT_AWD_W9123823F0079_9700_W9123823D0012_9700/
- W9123825FA026 (delivery order): $546,500, W075 Endist Sacramento. Design Bid Build Construction - Englebright Dam Narrows 1 Caterpillar Gate Recoating Project. https://www.usaspending.gov/award/CONT_AWD_W9123825FA026_9700_W9123823D0012_9700/
- W9123724F0188 (delivery order): $187,400, W072 Endist Huntington. Gate Install for Dillon Lake, Zanesville, Ohio for the US Army Corps of Engineers, Huntington District. https://www.usaspending.gov/award/CONT_AWD_W9123724F0188_9700_W911WN22D0002_9700/
- W912DQ22C1012 (definitive contract): $82,087, W071 Endist Kansas City. This Modification Is to Add the Bytedance Clause to the Naponee Irrigation Gate Replacement Contract.. https://www.usaspending.gov/award/CONT_AWD_W912DQ22C1012_9700_-NONE-_-NONE-/
- W912DQ23C1006 (definitive contract): $47,108, W071 Endist Kansas City. Modification for Upstream/ Downstream Concrete Repairs to Contract Tuttle Creek Service Gate 1 and 2 Conduit Liner Repairs at Manhattan, KS. https://www.usaspending.gov/award/CONT_AWD_W912DQ23C1006_9700_-NONE-_-NONE-/
- W9128F26PA055 (purchase order): $16,700, W071 Endist Omaha. Big Bend Spillway Gate No. 8 Inspection. https://www.usaspending.gov/award/CONT_AWD_W9128F26PA055_9700_-NONE-_-NONE-/
- W912DQ22C1032 (definitive contract): $12,750, W071 Endist Kansas City. Modification to Add FAR Clause 52.204-27 (Prohibition on a Bytedance Covered Application).. https://www.usaspending.gov/award/CONT_AWD_W912DQ22C1032_9700_-NONE-_-NONE-/
- W911WN23F0010 (delivery order): $0, W072 Endist Pittsburgh. Sluice Gate Fabrication for Youghiogheny River Lake - Extend Delivery Date. https://www.usaspending.gov/award/CONT_AWD_W911WN23F0010_9700_W911WN22D0002_9700/
- W911WN22D0002: $0, W072 Endist Pittsburgh. Metal Fabrication, Refurb & Installation Multiple Award Task Order Contract - Modification to Implement Executive Order: 14173. https://www.usaspending.gov/award/CONT_IDV_W911WN22D0002_9700/
- W911WN23D0001: $0, W072 Endist Pittsburgh. Metal Fabrication, Refurb & Installation Multiple Award Task Order Contract - Modification to Implement Executive Order: 14173. https://www.usaspending.gov/award/CONT_IDV_W911WN23D0001_9700/
- W911WN22F0005 (delivery order): -$10,000, W072 Endist Pittsburgh. Metal Fabrication Matoc Minimum Guarantee. https://www.usaspending.gov/award/CONT_AWD_W911WN22F0005_9700_W911WN22D0002_9700/
- W912BV22C0003 (definitive contract): -$62,133, W076 Endist Tulsa. BAY#4 Service Gate Painting and Rehab. https://www.usaspending.gov/award/CONT_AWD_W912BV22C0003_9700_-NONE-_-NONE-/
- W9123822F0033 (delivery order): -$452,078, W075 Endist Sacramento. CFRP Conduit Liners. https://www.usaspending.gov/award/CONT_AWD_W9123822F0033_9700_W9123818D0014_9700/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://abierto.us/vendors/alltech-engineering-corp-qwm2hnwzran3.