{"canonical":"https://abierto.us/opportunities/w91smc26qa016","key":"W91SMC26QA016","url":"https://abierto.us/opportunities/w91smc26qa016","title":"CES Expansion UPS Upgrade","solicitation_number":"W91SMC26QA016","notice_type":"o","open":false,"response_deadline":"2026-08-25T16:00:00Z","first_posted":"2026-07-27","last_posted":"2026-08-12","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"W7M6 USPFO ACTIVITY IL ARNG","naics":"236220","psc":"Y1AZ","set_aside":"SBA","place_state":"IL","winner":null,"award_amount":null,"publications":[{"notice_id":"f3428f7043374fa88bcd01902dd7756f","title":"CES Expansion UPS Upgrade","solicitation_number":"W91SMC26QA016","notice_type":"o","base_type":"p","posted":"2026-07-27","posted_at":null,"due_at":"2026-08-25T16:00:00Z","due_date":"2026-08-25","cancelled":null,"archived":null,"archive_date":"2026-09-09","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/f3428f7043374fa88bcd01902dd7756f/view","enriched":false,"history":[]},{"notice_id":"971dd766b9b74cc8a46f103c572ec055","title":"CES Expansion UPS Upgrade","solicitation_number":"W91SMC26QA016","notice_type":"o","base_type":"o","posted":"2026-08-12","posted_at":null,"due_at":"2026-08-25T16:00:00Z","due_date":"2026-08-25","cancelled":null,"archived":null,"archive_date":"2026-09-09","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/971dd766b9b74cc8a46f103c572ec055/view","enriched":false,"history":[]}],"latest_notice_id":"971dd766b9b74cc8a46f103c572ec055","first_type":"o","notices":[{"dates":{"posted":"2026-07-27","response_deadline":{"raw":"2026-08-25T11:00:00-05:00","utc":"2026-08-25T16:00:00Z","date":"2026-08-25","time":"11:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/f3428f7043374fa88bcd01902dd7756f/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"CES Expansion UPS Upgrade","agency":{"office":{"code":"W91SMC","name":"W7M6 USPFO ACTIVITY IL ARNG"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"62702-2399","city":"SPRINGFIELD","state":"IL","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2026-09-09","archive_type":"auto15"},"contacts":[{"name":"Lawrence Romang","role":"primary","email":"lawrence.j.romang.civ@army.mil","phone":"2177613462"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"f3428f7043374fa88bcd01902dd7756f","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T00:55:27.040971Z","row_sha256":"c41216b17f9b8beb444dd26d5aba565b4de7785609b0db59ed3af945701e5b41","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-09-16T00:55:27.040971Z","first_seen_at":"2026-09-16T00:55:27.040971Z"},"description":{"text":"The 183d Wing (183WG) at the Abraham Lincoln Capital Airport, Air National Guard Base, Springfield, IL, has a requirement for a firm-fixed-price construction contract to upgrade the Uninterrupted Power Supply (UPS) system in Building 8. SITE VISIT - 11 AUG 2026 @ 1300. The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and non-personal services necessary to remove the existing 10 kW UPS system and install a new scalable 20 kW UPS system. Key scope items include: Demolition and removal of one (1) existing 10 kW Liebert EXM UPS in SWITCH Room 118, including associated equipment and maintenance bypass panelboard. Site and electrical preparation for the new system. Installation of one (1) new scalable 20 kW UPS System (configured for 20 kVA/kW, scalable up to 30 kVA/kW for future expansion). Sealing of all wall/floor/ceiling penetrations to meet existing fire and assembly ratings. Full system adjustments, load balancing, and operational testing by factory-trained field service personnel. Period of Performance: 120 days or less after issuance of Notice to Proceed (NTP). See Solicitation for additional information.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W91SMC26QA016","place_of_performance":{"city":{"name":"Springfield"},"state":{"code":"IL"},"country":{"code":"USA"}},"product_service_code":"Y1AZ"},{"dates":{"posted":"2026-08-12","response_deadline":{"raw":"2026-08-25T11:00:00-05:00","utc":"2026-08-25T16:00:00Z","date":"2026-08-25","time":"11:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/971dd766b9b74cc8a46f103c572ec055/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"CES Expansion UPS Upgrade","agency":{"office":{"code":"W91SMC","name":"W7M6 USPFO ACTIVITY IL ARNG"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"62702-2399","city":"SPRINGFIELD","state":"IL","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2026-09-09","archive_type":"auto15"},"contacts":[{"name":"Lawrence Romang","role":"primary","email":"lawrence.j.romang.civ@army.mil","phone":"2177613462"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"971dd766b9b74cc8a46f103c572ec055","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T00:55:27.040971Z","row_sha256":"7d41d3539b4775c5872c527066222b3d9b8516b11ce8f16f01e5979db001986f","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-09-16T00:55:27.040971Z","first_seen_at":"2026-09-16T00:55:27.040971Z"},"description":{"text":"*Edit 8/12/26 - added Slides and Minutes from Pre-Quote Conference and Site Visit.* The 183d Wing (183WG) at the Abraham Lincoln Capital Airport, Air National Guard Base, Springfield, IL, has a requirement for a firm-fixed-price construction contract to upgrade the Uninterrupted Power Supply (UPS) system in Building 8. SITE VISIT - 11 AUG 2026 @ 1300. The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and non-personal services necessary to remove the existing 10 kW UPS system and install a new scalable 20 kW UPS system. Key scope items include: Demolition and removal of one (1) existing 10 kW Liebert EXM UPS in SWITCH Room 118, including associated equipment and maintenance bypass panelboard. Site and electrical preparation for the new system. Installation of one (1) new scalable 20 kW UPS System (configured for 20 kVA/kW, scalable up to 30 kVA/kW for future expansion). Sealing of all wall/floor/ceiling penetrations to meet existing fire and assembly ratings. Full system adjustments, load balancing, and operational testing by factory-trained field service personnel. Period of Performance: 120 days or less after issuance of Notice to Proceed (NTP). See Solicitation for additional information.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W91SMC26QA016","place_of_performance":{"city":{"name":"Springfield"},"state":{"code":"IL"},"country":{"code":"USA"}},"product_service_code":"Y1AZ"}],"due_at":"2026-08-25T16:00:00Z","due_date":"2026-08-25","closes_at":"2026-08-25T16:00:00Z","awardable":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W91SMC","office_name":"W7M6 USPFO ACTIVITY IL ARNG","state":"IL","country":"USA","winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T07:31:38.954589Z","principal_notice_id":"971dd766b9b74cc8a46f103c572ec055","description":{"text":"*Edit 8/12/26 - added Slides and Minutes from Pre-Quote Conference and Site Visit.* The 183d Wing (183WG) at the Abraham Lincoln Capital Airport, Air National Guard Base, Springfield, IL, has a requirement for a firm-fixed-price construction contract to upgrade the Uninterrupted Power Supply (UPS) system in Building 8. SITE VISIT - 11 AUG 2026 @ 1300. The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and non-personal services necessary to remove the existing 10 kW UPS system and install a new scalable 20 kW UPS system. Key scope items include: Demolition and removal of one (1) existing 10 kW Liebert EXM UPS in SWITCH Room 118, including associated equipment and maintenance bypass panelboard. Site and electrical preparation for the new system. Installation of one (1) new scalable 20 kW UPS System (configured for 20 kVA/kW, scalable up to 30 kVA/kW for future expansion). Sealing of all wall/floor/ceiling penetrations to meet existing fire and assembly ratings. Full system adjustments, load balancing, and operational testing by factory-trained field service personnel. Period of Performance: 120 days or less after issuance of Notice to Proceed (NTP). See Solicitation for additional information.","html":null,"origin":"extract"},"contacts":[{"name":"Lawrence Romang","role":"primary","email":"lawrence.j.romang.civ@army.mil","phone":"2177613462"}],"place_of_performance":{"city":{"name":"Springfield"},"state":{"code":"IL"},"country":{"code":"USA"}},"office_address":{"zip":"62702-2399","city":"SPRINGFIELD","state":"IL","country":"USA"},"naics_codes":["236220"],"award":null,"attachments":[],"awards":[],"related":[]}