# FTC Air Traffic Control Tower

Canonical: https://abierto.us/opportunities/w912qr26ratct

- Solicitation number: W912QR26RATCT
- Notice type: Presolicitation
- Status: Closed. Deadline was July 1, 2026 at 3:00 PM EDT
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W072 Endist Louisville (W912QR)
- NAICS: 236220 Commercial and Institutional Building Construction
- Product or service code: Y1BA Construction Of Air Traffic Control Towers
- Place of performance: Fort Campbell, Kentucky
- First posted: June 16, 2026
- Last posted: June 23, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/ebc65dd2b62442f3b619942129ddc1ec/view

## Description

The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue a Request for Proposal (Single Phase Evaluation Board – RFP) for the FCKY Air Traffic Control Tower (ATCT), located in Fort Campbell, KY. Construct a standard Design Flight Control Tower.

The Primary Facility (Air Traffic/Flight Control Tower) includes spaces on the first floor and throughout the functional vertical shaft space for equipment maintenance, open and closed administrative offices, administrative support spaces, passenger elevator, a server room, storage, bathrooms with showers, locker rooms, training and conference rooms, a ready room, janitors’ closets, break room, control tower cab, Army Radar Approach Control functional space, mechanical, electrical and equipment rooms.

Project includes special foundations, backup power generation and an uninterruptable power supply. Fire Life Safety (FLS) systems, Building Control Systems (BCS), and Electronic Security Systems (ESS) are included. Energy Monitoring and Control Systems (EMCS) connection will be provided if applicable. Access for individuals with disabilities will be provided up to the tenth floor.

Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided and costs are included in the building unit cost. Fort Campbell has designated this facility as a critical asset and requested additional antiterrorism measures over the minimum required by UFC 4-010-01 be included. The cost for the additional measures is included in the Building Antiterrorism Measures line item.

Supporting facilities include paving, walks, parking, lighting, and site improvements. Comprehensive interior design and furnishings are required. Heating and air conditioning will be provided by a self-contained system. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy.

## Publications

- June 16, 2026: Presolicitation, due July 1, 2026 at 3:00 PM EDT. Notice 8b2fb188638a442f8c94304ec83a0f5a. https://sam.gov/workspace/contract/opp/8b2fb188638a442f8c94304ec83a0f5a/view
- June 23, 2026: Presolicitation, due July 1, 2026 at 3:00 PM EDT. Notice ebc65dd2b62442f3b619942129ddc1ec. https://sam.gov/workspace/contract/opp/ebc65dd2b62442f3b619942129ddc1ec/view

## Points of contact

- THOMAS NAUERT, thomas.s.nauert@usace.army.mil

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/w912qr26ratct.
