# Hydraulic pumps/reservoir replacement and Hydraulic Cylinder Shaft Repacking in Water Control Tower located at Rough River Lake, Kentucky.

Canonical: https://abierto.us/opportunities/w912qr24q0113

- Solicitation number: W912QR24Q0113
- Notice type: Solicitation
- Status: Closed. Deadline was September 6, 2024 at 12:00 PM EDT
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W072 Endist Louisville (W912QR)
- NAICS: 237990 Other Heavy and Civil Engineering Construction
- Product or service code: J036 Maintenance, Repair and Rebuilding of Equipment: Special Industry Machinery
- Set-aside: Total small business set-aside
- Place of performance: Falls of Rough, Kentucky
- County: Breckinridge County (FIPS 21027). https://abierto.us/counties/breckinridge-county-ky-21027
- First posted: August 13, 2024
- Last posted: August 30, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/a03eac78aeba44858c341fc84a4730cc/view

## Description

The scope of work will include the removal and replacement of two hydraulic pumps, two electric motors, one oil storage tank and all components that support the hydraulic system and repack (3) three-cylinder shafts in the water control tower.

All work is located at the Rough River Lake Project water control tower, Breckinridge County, Kentucky.The contractor shall furnish all personnel, materials, supplies, tools, parts, equipment, transportation, labor ,and incidentals necessary to perform the following work listed below per the specifications herein. The contractor?s work and responsibility shall also include all planning, programming, administration, management, supervision, communications, engineering, and quality control.

Mobilization, de-mobilization, and delivery of all materials, and equipment shall be included in the price. The contractor shall be responsible for all permits, both local, state, and federal at no expense to the government. All design, material, and work shall be in strict accordance with the specification in this contract and comply with all applicable Federal, State and Local laws and regulations. Please note, all distances and measurements provided are approximate.

It is the contractor?s responsibility to field verify all measurements and calculations. Access to the site and coordination for construction is through the USACE Rough River Lake office. See section 8 Technical Points of Contact and Project Representatives for contact information. It is incumbent upon the contractor to attend the pre-bid meeting and visit the site to work out details of equipment storage and staging of materials with the TPOC, Maintenance Leader, and/or Lake Manager.

Work under this contract will begin within 10 calendar days of Notice to Proceed (NTP) and complete within 120 calendar days after receiving the NTP. Hours of Work will be 6:30 a.m. ? 4:00 p.m., Monday thru Friday. Exceptions to these hours may be arranged in advance.

The contractor will be required to restore all areas disturbed by contractor?s actions to its original condition.Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here

## Publications

- August 13, 2024: Solicitation, due September 3, 2024 at 11:00 AM EDT. Notice ede5b9014cfc44cead291f4b244357e8. https://sam.gov/workspace/contract/opp/ede5b9014cfc44cead291f4b244357e8/view
- August 13, 2024: Solicitation, due September 3, 2024 at 10:00 AM EDT. Notice ff0d0514ede64c13a14bc00727c0b461. https://sam.gov/workspace/contract/opp/ff0d0514ede64c13a14bc00727c0b461/view
- August 14, 2024: Solicitation, due September 3, 2024 at 11:00 AM EDT. Notice 5aab94b7d8364a4ebfbf921eebe29270. https://sam.gov/workspace/contract/opp/5aab94b7d8364a4ebfbf921eebe29270/view
- August 14, 2024: Solicitation, due September 3, 2024 at 11:00 AM EDT. Notice fb9de64153634ae38a3a6611bbf77a5a. https://sam.gov/workspace/contract/opp/fb9de64153634ae38a3a6611bbf77a5a/view
- August 21, 2024: Solicitation, due September 3, 2024 at 11:00 AM EDT. Notice 60b9e0d7f77f456ca8536dafc687fff4. https://sam.gov/workspace/contract/opp/60b9e0d7f77f456ca8536dafc687fff4/view
- August 27, 2024: Solicitation, due September 3, 2024 at 11:00 AM EDT. Notice 5d0b1516b939453ca4dd81a050a353f7. https://sam.gov/workspace/contract/opp/5d0b1516b939453ca4dd81a050a353f7/view
- August 30, 2024: Solicitation, due September 6, 2024 at 10:00 AM EDT. Notice 31c2d65303a641e6a28de3f1b0860475. https://sam.gov/workspace/contract/opp/31c2d65303a641e6a28de3f1b0860475/view
- August 30, 2024: Solicitation, due September 6, 2024 at 12:00 PM EDT. Notice a03eac78aeba44858c341fc84a4730cc. https://sam.gov/workspace/contract/opp/a03eac78aeba44858c341fc84a4730cc/view

## Points of contact

- Joel Huberman, joel.huberman@usace.army.mil, 5023157409
- Matthew Judd, Matthew.p.judd@usace.army.mil, 5023157425

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/w912qr24q0113.