{"canonical":"https://abierto.us/opportunities/w912qr24q0113","key":"W912QR24Q0113","url":"https://abierto.us/opportunities/w912qr24q0113","title":"Hydraulic pumps/reservoir replacement and Hydraulic Cylinder Shaft Repacking in Water Control Tower located at Rough River Lake, Kentucky.","solicitation_number":"W912QR24Q0113","notice_type":"o","open":false,"response_deadline":"2024-09-06T16:00:00Z","first_posted":"2024-08-13","last_posted":"2024-08-30","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"W072 ENDIST LOUISVILLE","naics":"237990","psc":"J036","set_aside":"SBA","place_state":"KY","place_county":"21027","place_county_name":"Breckinridge County","place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"ede5b9014cfc44cead291f4b244357e8","title":"Hydraulic pumps/reservoir replacement and Hydraulic Cylinder Shaft Repacking in Water Control Tower located at Rough River Lake, Kentucky.","solicitation_number":"W912QR24Q0113","notice_type":"o","base_type":"o","posted":"2024-08-13","posted_at":null,"due_at":"2024-09-03T15:00:00Z","due_date":"2024-09-03","cancelled":null,"archived":null,"archive_date":"2025-08-13","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/ede5b9014cfc44cead291f4b244357e8/view","enriched":false,"history":[]},{"notice_id":"ff0d0514ede64c13a14bc00727c0b461","title":"Hydraulic pumps/reservoir replacement and Hydraulic Cylinder Shaft Repacking in Water Control Tower located at Rough River Lake, Kentucky.","solicitation_number":"W912QR24Q0113","notice_type":"o","base_type":"o","posted":"2024-08-13","posted_at":null,"due_at":"2024-09-03T14:00:00Z","due_date":"2024-09-03","cancelled":null,"archived":null,"archive_date":"2024-09-18","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/ff0d0514ede64c13a14bc00727c0b461/view","enriched":false,"history":[]},{"notice_id":"5aab94b7d8364a4ebfbf921eebe29270","title":"Hydraulic pumps/reservoir replacement and Hydraulic Cylinder Shaft Repacking in Water Control Tower located at Rough River Lake, Kentucky.","solicitation_number":"W912QR24Q0113","notice_type":"o","base_type":"o","posted":"2024-08-14","posted_at":null,"due_at":"2024-09-03T15:00:00Z","due_date":"2024-09-03","cancelled":null,"archived":null,"archive_date":"2025-08-14","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/5aab94b7d8364a4ebfbf921eebe29270/view","enriched":false,"history":[]},{"notice_id":"fb9de64153634ae38a3a6611bbf77a5a","title":"Hydraulic pumps/reservoir replacement and Hydraulic Cylinder Shaft Repacking in Water Control Tower located at Rough River Lake, Kentucky.","solicitation_number":"W912QR24Q0113","notice_type":"o","base_type":"o","posted":"2024-08-14","posted_at":null,"due_at":"2024-09-03T15:00:00Z","due_date":"2024-09-03","cancelled":null,"archived":null,"archive_date":"2025-08-14","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/fb9de64153634ae38a3a6611bbf77a5a/view","enriched":false,"history":[]},{"notice_id":"60b9e0d7f77f456ca8536dafc687fff4","title":"Hydraulic pumps/reservoir replacement and Hydraulic Cylinder Shaft Repacking in Water Control Tower located at Rough River Lake, Kentucky.","solicitation_number":"W912QR24Q0113","notice_type":"o","base_type":"o","posted":"2024-08-21","posted_at":null,"due_at":"2024-09-03T15:00:00Z","due_date":"2024-09-03","cancelled":null,"archived":null,"archive_date":"2025-08-14","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/60b9e0d7f77f456ca8536dafc687fff4/view","enriched":false,"history":[]},{"notice_id":"5d0b1516b939453ca4dd81a050a353f7","title":"Hydraulic pumps/reservoir replacement and Hydraulic Cylinder Shaft Repacking in Water Control Tower located at Rough River Lake, Kentucky.","solicitation_number":"W912QR24Q0113","notice_type":"o","base_type":"o","posted":"2024-08-27","posted_at":null,"due_at":"2024-09-03T15:00:00Z","due_date":"2024-09-03","cancelled":null,"archived":null,"archive_date":"2025-08-14","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/5d0b1516b939453ca4dd81a050a353f7/view","enriched":false,"history":[]},{"notice_id":"31c2d65303a641e6a28de3f1b0860475","title":"Hydraulic pumps/reservoir replacement and Hydraulic Cylinder Shaft Repacking in Water Control Tower located at Rough River Lake, Kentucky.","solicitation_number":"W912QR24Q0113","notice_type":"o","base_type":"o","posted":"2024-08-30","posted_at":null,"due_at":"2024-09-06T14:00:00Z","due_date":"2024-09-06","cancelled":null,"archived":null,"archive_date":"2025-08-14","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/31c2d65303a641e6a28de3f1b0860475/view","enriched":false,"history":[]},{"notice_id":"a03eac78aeba44858c341fc84a4730cc","title":"Hydraulic pumps/reservoir replacement and Hydraulic Cylinder Shaft Repacking in Water Control Tower located at Rough River Lake, Kentucky.","solicitation_number":"W912QR24Q0113","notice_type":"o","base_type":"o","posted":"2024-08-30","posted_at":null,"due_at":"2024-09-06T16:00:00Z","due_date":"2024-09-06","cancelled":null,"archived":null,"archive_date":"2025-08-30","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a03eac78aeba44858c341fc84a4730cc/view","enriched":false,"history":[]}],"latest_notice_id":"a03eac78aeba44858c341fc84a4730cc","first_type":"o","notices":[{"dates":{"posted":"2024-08-13","response_deadline":{"raw":"2024-09-03T10:00:00-05:00","utc":"2024-09-03T15:00:00Z","date":"2024-09-03","time":"10:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/ede5b9014cfc44cead291f4b244357e8/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Hydraulic pumps/reservoir replacement and Hydraulic Cylinder Shaft Repacking in Water Control Tower located at Rough River Lake, Kentucky.","agency":{"office":{"code":"W912QR","name":"W072 ENDIST LOUISVILLE"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"40202-2230","city":"LOUISVILLE","state":"KY","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-08-13","archive_type":"auto_custom"},"contacts":[{"name":"Joel Huberman","role":"primary","email":"joel.huberman@usace.army.mil","phone":"5023157409"},{"name":"Matthew Judd","role":"secondary","email":"Matthew.p.judd@usace.army.mil","phone":"5023157425"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"ede5b9014cfc44cead291f4b244357e8","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"1dbb889073d08bc6a3160215e6d53badf20505b7571a1ec3f00d5c177784c3b4","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"The scope of work will include the removal and replacement of two hydraulic pumps, two electric motors, one oil storage tank and all components that support the hydraulic system and repack (3) three-cylinder shafts in the water control tower. All work is located at the Rough River Lake Project water control tower, Breckinridge County, Kentucky.The contractor shall furnish all personnel, materials, supplies, tools, parts, equipment, transportation, labor ,and incidentals necessary to perform the following work listed below per the specifications herein. The contractor?s work and responsibility shall also include all planning, programming, administration, management, supervision, communications, engineering, and quality control. Mobilization, de-mobilization, and delivery of all materials, and equipment shall be included in the price. The contractor shall be responsible for all permits, both local, state, and federal at no expense to the government. All design, material, and work shall be in strict accordance with the specification in this contract and comply with all applicable Federal, State and Local laws and regulations. Please note, all distances and measurements provided are approximate. It is the contractor?s responsibility to field verify all measurements and calculations. Access to the site and coordination for construction is through the USACE Rough River Lake office. See section 8 Technical Points of Contact and Project Representatives for contact information. It is incumbent upon the contractor to attend the pre-bid meeting and visit the site to work out details of equipment storage and staging of materials with the TPOC, Maintenance Leader, and/or Lake Manager. Work under this contract will begin within 10 calendar days of Notice to Proceed (NTP) and complete within 120 calendar days after receiving the NTP. Hours of Work will be 6:30 a.m. ? 4:00 p.m., Monday thru Friday. Exceptions to these hours may be arranged in advance. The contractor will be required to restore all areas disturbed by contractor?s actions to its original condition.Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912QR24Q0113","product_service_code":"J036"},{"dates":{"posted":"2024-08-13","response_deadline":{"raw":"2024-09-03T10:00:00-04:00","utc":"2024-09-03T14:00:00Z","date":"2024-09-03","time":"10:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/ff0d0514ede64c13a14bc00727c0b461/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Hydraulic pumps/reservoir replacement and Hydraulic Cylinder Shaft Repacking in Water Control Tower located at Rough River Lake, Kentucky.","agency":{"office":{"code":"W912QR","name":"W072 ENDIST LOUISVILLE"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"40202-2230","city":"LOUISVILLE","state":"KY","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-09-18","archive_type":"auto15"},"contacts":[{"name":"Joel Huberman","role":"primary","email":"joel.huberman@usace.army.mil","phone":"5023157409"},{"name":"Matthew Judd","role":"secondary","email":"Matthew.p.judd@usace.army.mil","phone":"5023157425"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"ff0d0514ede64c13a14bc00727c0b461","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"d1cdc8f8c5eeb7062d85ea64995c539e986aed09ad9b04e87afd7b906d3745f7","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"The scope of work will include the removal and replacement of two hydraulic pumps, two electric motors, one oil storage tank and all components that support the hydraulic system and repack (3) three-cylinder shafts in the water control tower. All work is located at the Rough River Lake Project water control tower, Breckinridge County, Kentucky. The contractor shall furnish all personnel, materials, supplies, tools, parts, equipment, transportation, labor ,and incidentals necessary to perform the following work listed below per the specifications herein. The contractor?s work and responsibility shall also include all planning, programming, administration, management, supervision, communications, engineering, and quality control. Mobilization, de-mobilization, and delivery of all materials, and equipment shall be included in the price. The contractor shall be responsible for all permits, both local, state, and federal at no expense to the government. All design, material, and work shall be in strict accordance with the specification in this contract and comply with all applicable Federal, State and Local laws and regulations. Please note, all distances and measurements provided are approximate. It is the contractors responsibility to field verify all measurements and calculations. Access to the site and coordination for construction is through the USACE Rough River Lake office. See section 8 Technical Points of Contact and Project Representatives for contact information. It is incumbent upon the contractor to attend the pre-bid meeting and visit the site to work out details of equipment storage and staging of materials with the TPOC, Maintenance Leader, and/or Lake Manager. Work under this contract will begin within 10 calendar days of Notice to Proceed (NTP) and complete within 120 calendar days after receiving the NTP. Hours of Work will be 6:30 a.m. - 4:00 p.m., Monday thru Friday. Exceptions to these hours may be arranged in advance. The contractor will be required to restore all areas disturbed by contractors actions to its original condition. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912QR24Q0113","place_of_performance":{"zip":"40119","city":{"name":"Falls of Rough"},"state":{"code":"KY"},"country":{"code":"USA"}},"product_service_code":"J036"},{"dates":{"posted":"2024-08-14","response_deadline":{"raw":"2024-09-03T10:00:00-05:00","utc":"2024-09-03T15:00:00Z","date":"2024-09-03","time":"10:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/5aab94b7d8364a4ebfbf921eebe29270/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Hydraulic pumps/reservoir replacement and Hydraulic Cylinder Shaft Repacking in Water Control Tower located at Rough River Lake, Kentucky.","agency":{"office":{"code":"W912QR","name":"W072 ENDIST LOUISVILLE"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"40202-2230","city":"LOUISVILLE","state":"KY","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-08-14","archive_type":"auto_custom"},"contacts":[{"name":"Joel Huberman","role":"primary","email":"joel.huberman@usace.army.mil","phone":"5023157409"},{"name":"Matthew Judd","role":"secondary","email":"Matthew.p.judd@usace.army.mil","phone":"5023157425"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"5aab94b7d8364a4ebfbf921eebe29270","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"11361763648dfa2396aa284ce1f3db8852e3eb57b2725b43715fa9b69a3052b0","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"The scope of work will include the removal and replacement of two hydraulic pumps, two electric motors, one oil storage tank and all components that support the hydraulic system and repack (3) three-cylinder shafts in the water control tower. All work is located at the Rough River Lake Project water control tower, Breckinridge County, Kentucky.The contractor shall furnish all personnel, materials, supplies, tools, parts, equipment, transportation, labor ,and incidentals necessary to perform the following work listed below per the specifications herein. The contractor?s work and responsibility shall also include all planning, programming, administration, management, supervision, communications, engineering, and quality control. Mobilization, de-mobilization, and delivery of all materials, and equipment shall be included in the price. The contractor shall be responsible for all permits, both local, state, and federal at no expense to the government. All design, material, and work shall be in strict accordance with the specification in this contract and comply with all applicable Federal, State and Local laws and regulations. Please note, all distances and measurements provided are approximate. It is the contractor?s responsibility to field verify all measurements and calculations. Access to the site and coordination for construction is through the USACE Rough River Lake office. See section 8 Technical Points of Contact and Project Representatives for contact information. It is incumbent upon the contractor to attend the pre-bid meeting and visit the site to work out details of equipment storage and staging of materials with the TPOC, Maintenance Leader, and/or Lake Manager. Work under this contract will begin within 10 calendar days of Notice to Proceed (NTP) and complete within 120 calendar days after receiving the NTP. Hours of Work will be 6:30 a.m. ? 4:00 p.m., Monday thru Friday. Exceptions to these hours may be arranged in advance. The contractor will be required to restore all areas disturbed by contractor?s actions to its original condition.Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912QR24Q0113","place_of_performance":{"zip":"40119","city":{"name":"Falls of Rough"},"state":{"code":"KY"},"country":{"code":"USA"}},"product_service_code":"J036"},{"dates":{"posted":"2024-08-14","response_deadline":{"raw":"2024-09-03T10:00:00-05:00","utc":"2024-09-03T15:00:00Z","date":"2024-09-03","time":"10:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/fb9de64153634ae38a3a6611bbf77a5a/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Hydraulic pumps/reservoir replacement and Hydraulic Cylinder Shaft Repacking in Water Control Tower located at Rough River Lake, Kentucky.","agency":{"office":{"code":"W912QR","name":"W072 ENDIST LOUISVILLE"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"40202-2230","city":"LOUISVILLE","state":"KY","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-08-14","archive_type":"auto_custom"},"contacts":[{"name":"Joel Huberman","role":"primary","email":"joel.huberman@usace.army.mil","phone":"5023157409"},{"name":"Matthew Judd","role":"secondary","email":"Matthew.p.judd@usace.army.mil","phone":"5023157425"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"fb9de64153634ae38a3a6611bbf77a5a","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"800b56daf7eff6775c47414ca12c0842bd2efcb6d1eff6ef87fe2741511e7489","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"The scope of work will include the removal and replacement of two hydraulic pumps, two electric motors, one oil storage tank and all components that support the hydraulic system and repack (3) three-cylinder shafts in the water control tower. All work is located at the Rough River Lake Project water control tower, Breckinridge County, Kentucky.The contractor shall furnish all personnel, materials, supplies, tools, parts, equipment, transportation, labor ,and incidentals necessary to perform the following work listed below per the specifications herein. The contractor?s work and responsibility shall also include all planning, programming, administration, management, supervision, communications, engineering, and quality control. Mobilization, de-mobilization, and delivery of all materials, and equipment shall be included in the price. The contractor shall be responsible for all permits, both local, state, and federal at no expense to the government. All design, material, and work shall be in strict accordance with the specification in this contract and comply with all applicable Federal, State and Local laws and regulations. Please note, all distances and measurements provided are approximate. It is the contractor?s responsibility to field verify all measurements and calculations. Access to the site and coordination for construction is through the USACE Rough River Lake office. See section 8 Technical Points of Contact and Project Representatives for contact information. It is incumbent upon the contractor to attend the pre-bid meeting and visit the site to work out details of equipment storage and staging of materials with the TPOC, Maintenance Leader, and/or Lake Manager. Work under this contract will begin within 10 calendar days of Notice to Proceed (NTP) and complete within 120 calendar days after receiving the NTP. Hours of Work will be 6:30 a.m. ? 4:00 p.m., Monday thru Friday. Exceptions to these hours may be arranged in advance. The contractor will be required to restore all areas disturbed by contractor?s actions to its original condition.Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here Amendment 001 - Posted 14 August 2024 - Revision of Statement of Work & Price Breakout Schedule.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912QR24Q0113","place_of_performance":{"zip":"40119","city":{"name":"Falls of Rough"},"state":{"code":"KY"},"country":{"code":"USA"}},"product_service_code":"J036"},{"dates":{"posted":"2024-08-21","response_deadline":{"raw":"2024-09-03T10:00:00-05:00","utc":"2024-09-03T15:00:00Z","date":"2024-09-03","time":"10:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/60b9e0d7f77f456ca8536dafc687fff4/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Hydraulic pumps/reservoir replacement and Hydraulic Cylinder Shaft Repacking in Water Control Tower located at Rough River Lake, Kentucky.","agency":{"office":{"code":"W912QR","name":"W072 ENDIST LOUISVILLE"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"40202-2230","city":"LOUISVILLE","state":"KY","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-08-14","archive_type":"auto_custom"},"contacts":[{"name":"Joel Huberman","role":"primary","email":"joel.huberman@usace.army.mil","phone":"5023157409"},{"name":"Matthew Judd","role":"secondary","email":"Matthew.p.judd@usace.army.mil","phone":"5023157425"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"60b9e0d7f77f456ca8536dafc687fff4","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"2e43766d6dd4fcff5d8d45d1a61487443334a971a3c5ebb72189d97ad143f907","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"The scope of work will include the removal and replacement of two hydraulic pumps, two electric motors, one oil storage tank and all components that support the hydraulic system and repack (3) three-cylinder shafts in the water control tower. All work is located at the Rough River Lake Project water control tower, Breckinridge County, Kentucky.The contractor shall furnish all personnel, materials, supplies, tools, parts, equipment, transportation, labor ,and incidentals necessary to perform the following work listed below per the specifications herein. The contractor?s work and responsibility shall also include all planning, programming, administration, management, supervision, communications, engineering, and quality control. Mobilization, de-mobilization, and delivery of all materials, and equipment shall be included in the price. The contractor shall be responsible for all permits, both local, state, and federal at no expense to the government. All design, material, and work shall be in strict accordance with the specification in this contract and comply with all applicable Federal, State and Local laws and regulations. Please note, all distances and measurements provided are approximate. It is the contractor?s responsibility to field verify all measurements and calculations. Access to the site and coordination for construction is through the USACE Rough River Lake office. See section 8 Technical Points of Contact and Project Representatives for contact information. It is incumbent upon the contractor to attend the pre-bid meeting and visit the site to work out details of equipment storage and staging of materials with the TPOC, Maintenance Leader, and/or Lake Manager. Work under this contract will begin within 10 calendar days of Notice to Proceed (NTP) and complete within 120 calendar days after receiving the NTP. Hours of Work will be 6:30 a.m. ? 4:00 p.m., Monday thru Friday. Exceptions to these hours may be arranged in advance. The contractor will be required to restore all areas disturbed by contractor?s actions to its original condition.Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here Amendment 001 - Posted 14 August 2024 - Revision of Statement of Work & Price Breakout Schedule.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912QR24Q0113","place_of_performance":{"zip":"40119","city":{"name":"Falls of Rough"},"state":{"code":"KY"},"country":{"code":"USA"}},"product_service_code":"J036"},{"dates":{"posted":"2024-08-27","response_deadline":{"raw":"2024-09-03T10:00:00-05:00","utc":"2024-09-03T15:00:00Z","date":"2024-09-03","time":"10:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/5d0b1516b939453ca4dd81a050a353f7/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Hydraulic pumps/reservoir replacement and Hydraulic Cylinder Shaft Repacking in Water Control Tower located at Rough River Lake, Kentucky.","agency":{"office":{"code":"W912QR","name":"W072 ENDIST LOUISVILLE"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"40202-2230","city":"LOUISVILLE","state":"KY","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-08-14","archive_type":"auto_custom"},"contacts":[{"name":"Joel Huberman","role":"primary","email":"joel.huberman@usace.army.mil","phone":"5023157409"},{"name":"Matthew Judd","role":"secondary","email":"Matthew.p.judd@usace.army.mil","phone":"5023157425"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"5d0b1516b939453ca4dd81a050a353f7","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"f9294790f2b40c9fca4c21f66922851e9de7c0421396e5cd6167790dc58c5176","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"The scope of work will include the removal and replacement of two hydraulic pumps, two electric motors, one oil storage tank and all components that support the hydraulic system and repack (3) three-cylinder shafts in the water control tower. All work is located at the Rough River Lake Project water control tower, Breckinridge County, Kentucky.The contractor shall furnish all personnel, materials, supplies, tools, parts, equipment, transportation, labor ,and incidentals necessary to perform the following work listed below per the specifications herein. The contractor?s work and responsibility shall also include all planning, programming, administration, management, supervision, communications, engineering, and quality control. Mobilization, de-mobilization, and delivery of all materials, and equipment shall be included in the price. The contractor shall be responsible for all permits, both local, state, and federal at no expense to the government. All design, material, and work shall be in strict accordance with the specification in this contract and comply with all applicable Federal, State and Local laws and regulations. Please note, all distances and measurements provided are approximate. It is the contractor?s responsibility to field verify all measurements and calculations. Access to the site and coordination for construction is through the USACE Rough River Lake office. See section 8 Technical Points of Contact and Project Representatives for contact information. It is incumbent upon the contractor to attend the pre-bid meeting and visit the site to work out details of equipment storage and staging of materials with the TPOC, Maintenance Leader, and/or Lake Manager. Work under this contract will begin within 10 calendar days of Notice to Proceed (NTP) and complete within 120 calendar days after receiving the NTP. Hours of Work will be 6:30 a.m. ? 4:00 p.m., Monday thru Friday. Exceptions to these hours may be arranged in advance. The contractor will be required to restore all areas disturbed by contractor?s actions to its original condition.Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here Amendment 001 - Posted 14 August 2024 - Revision of Statement of Work & Price Breakout Schedule. ProjNet Bidder Key is CF246H-G664HT","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912QR24Q0113","place_of_performance":{"zip":"40119","city":{"name":"Falls of Rough"},"state":{"code":"KY"},"country":{"code":"USA"}},"product_service_code":"J036"},{"dates":{"posted":"2024-08-30","response_deadline":{"raw":"2024-09-06T10:00:00-04:00","utc":"2024-09-06T14:00:00Z","date":"2024-09-06","time":"10:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/31c2d65303a641e6a28de3f1b0860475/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Hydraulic pumps/reservoir replacement and Hydraulic Cylinder Shaft Repacking in Water Control Tower located at Rough River Lake, Kentucky.","agency":{"office":{"code":"W912QR","name":"W072 ENDIST LOUISVILLE"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"40202-2230","city":"LOUISVILLE","state":"KY","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-08-14","archive_type":"auto_custom"},"contacts":[{"name":"Joel Huberman","role":"primary","email":"joel.huberman@usace.army.mil","phone":"5023157409"},{"name":"Matthew Judd","role":"secondary","email":"Matthew.p.judd@usace.army.mil","phone":"5023157425"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"31c2d65303a641e6a28de3f1b0860475","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"5b3d30bdc0d8979530c874dc1716081d6ae40d9fcdd6773bb1a04bde0a2f75b8","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"The scope of work will include the removal and replacement of two hydraulic pumps, two electric motors, one oil storage tank and all components that support the hydraulic system and repack (3) three-cylinder shafts in the water control tower. All work is located at the Rough River Lake Project water control tower, Breckinridge County, Kentucky.The contractor shall furnish all personnel, materials, supplies, tools, parts, equipment, transportation, labor ,and incidentals necessary to perform the following work listed below per the specifications herein. The contractor?s work and responsibility shall also include all planning, programming, administration, management, supervision, communications, engineering, and quality control. Mobilization, de-mobilization, and delivery of all materials, and equipment shall be included in the price. The contractor shall be responsible for all permits, both local, state, and federal at no expense to the government. All design, material, and work shall be in strict accordance with the specification in this contract and comply with all applicable Federal, State and Local laws and regulations. Please note, all distances and measurements provided are approximate. It is the contractor?s responsibility to field verify all measurements and calculations. Access to the site and coordination for construction is through the USACE Rough River Lake office. See section 8 Technical Points of Contact and Project Representatives for contact information. It is incumbent upon the contractor to attend the pre-bid meeting and visit the site to work out details of equipment storage and staging of materials with the TPOC, Maintenance Leader, and/or Lake Manager. Work under this contract will begin within 10 calendar days of Notice to Proceed (NTP) and complete within 120 calendar days after receiving the NTP. Hours of Work will be 6:30 a.m. ? 4:00 p.m., Monday thru Friday. Exceptions to these hours may be arranged in advance. The contractor will be required to restore all areas disturbed by contractor?s actions to its original condition.Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here Amendment 0001 - Posted 14 August 2024 - Revision of Statement of Work & Price Breakout Schedule. Amendment 0002 - Posted 30 August 2024 - Revision of Solicitation Due date from 03 September 2024 11:00AM ET to 06 September 2024 11:00AM ET. ProjNet Bidder Key is CF246H-G664HT","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912QR24Q0113","place_of_performance":{"zip":"40119","city":{"name":"Falls of Rough"},"state":{"code":"KY"},"country":{"code":"USA"}},"product_service_code":"J036"},{"dates":{"posted":"2024-08-30","response_deadline":{"raw":"2024-09-06T11:00:00-05:00","utc":"2024-09-06T16:00:00Z","date":"2024-09-06","time":"11:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/a03eac78aeba44858c341fc84a4730cc/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Hydraulic pumps/reservoir replacement and Hydraulic Cylinder Shaft Repacking in Water Control Tower located at Rough River Lake, Kentucky.","agency":{"office":{"code":"W912QR","name":"W072 ENDIST LOUISVILLE"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"40202-2230","city":"LOUISVILLE","state":"KY","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-08-30","archive_type":"auto_custom"},"contacts":[{"name":"Joel Huberman","role":"primary","email":"joel.huberman@usace.army.mil","phone":"5023157409"},{"name":"Matthew Judd","role":"secondary","email":"Matthew.p.judd@usace.army.mil","phone":"5023157425"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"a03eac78aeba44858c341fc84a4730cc","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"2d9530d897728418fcfce4d659cf63d420cb0a812a994087256d76f0979280ea","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"The scope of work will include the removal and replacement of two hydraulic pumps, two electric motors, one oil storage tank and all components that support the hydraulic system and repack (3) three-cylinder shafts in the water control tower. All work is located at the Rough River Lake Project water control tower, Breckinridge County, Kentucky.The contractor shall furnish all personnel, materials, supplies, tools, parts, equipment, transportation, labor ,and incidentals necessary to perform the following work listed below per the specifications herein. The contractor?s work and responsibility shall also include all planning, programming, administration, management, supervision, communications, engineering, and quality control. Mobilization, de-mobilization, and delivery of all materials, and equipment shall be included in the price. The contractor shall be responsible for all permits, both local, state, and federal at no expense to the government. All design, material, and work shall be in strict accordance with the specification in this contract and comply with all applicable Federal, State and Local laws and regulations. Please note, all distances and measurements provided are approximate. It is the contractor?s responsibility to field verify all measurements and calculations. Access to the site and coordination for construction is through the USACE Rough River Lake office. See section 8 Technical Points of Contact and Project Representatives for contact information. It is incumbent upon the contractor to attend the pre-bid meeting and visit the site to work out details of equipment storage and staging of materials with the TPOC, Maintenance Leader, and/or Lake Manager. Work under this contract will begin within 10 calendar days of Notice to Proceed (NTP) and complete within 120 calendar days after receiving the NTP. Hours of Work will be 6:30 a.m. ? 4:00 p.m., Monday thru Friday. Exceptions to these hours may be arranged in advance. The contractor will be required to restore all areas disturbed by contractor?s actions to its original condition.Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912QR24Q0113","place_of_performance":{"zip":"40119","city":{"name":"Falls of Rough"},"state":{"code":"KY"},"country":{"code":"USA"}},"product_service_code":"J036"}],"due_at":"2024-09-06T16:00:00Z","due_date":"2024-09-06","closes_at":"2024-09-06T16:00:00Z","awardable":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912QR","office_name":"W072 ENDIST LOUISVILLE","state":"KY","county":"21027","county_name":"Breckinridge County","city":null,"city_name":null,"country":"USA","winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z","principal_notice_id":"a03eac78aeba44858c341fc84a4730cc","description":{"text":"The scope of work will include the removal and replacement of two hydraulic pumps, two electric motors, one oil storage tank and all components that support the hydraulic system and repack (3) three-cylinder shafts in the water control tower. All work is located at the Rough River Lake Project water control tower, Breckinridge County, Kentucky.The contractor shall furnish all personnel, materials, supplies, tools, parts, equipment, transportation, labor ,and incidentals necessary to perform the following work listed below per the specifications herein. The contractor?s work and responsibility shall also include all planning, programming, administration, management, supervision, communications, engineering, and quality control. Mobilization, de-mobilization, and delivery of all materials, and equipment shall be included in the price. The contractor shall be responsible for all permits, both local, state, and federal at no expense to the government. All design, material, and work shall be in strict accordance with the specification in this contract and comply with all applicable Federal, State and Local laws and regulations. Please note, all distances and measurements provided are approximate. It is the contractor?s responsibility to field verify all measurements and calculations. Access to the site and coordination for construction is through the USACE Rough River Lake office. See section 8 Technical Points of Contact and Project Representatives for contact information. It is incumbent upon the contractor to attend the pre-bid meeting and visit the site to work out details of equipment storage and staging of materials with the TPOC, Maintenance Leader, and/or Lake Manager. Work under this contract will begin within 10 calendar days of Notice to Proceed (NTP) and complete within 120 calendar days after receiving the NTP. Hours of Work will be 6:30 a.m. ? 4:00 p.m., Monday thru Friday. Exceptions to these hours may be arranged in advance. The contractor will be required to restore all areas disturbed by contractor?s actions to its original condition.Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here","html":null,"origin":"extract"},"contacts":[{"name":"Joel Huberman","role":"primary","email":"joel.huberman@usace.army.mil","phone":"5023157409"},{"name":"Matthew Judd","role":"secondary","email":"Matthew.p.judd@usace.army.mil","phone":"5023157425"}],"place_of_performance":{"zip":"40119","city":{"name":"Falls of Rough"},"state":{"code":"KY"},"country":{"code":"USA"}},"office_address":{"zip":"40202-2230","city":"LOUISVILLE","state":"KY","country":"USA"},"naics_codes":["237990"],"award":null,"attachments":[],"awards":[],"related":[{"key":"W912QR27BA001","latest_notice_id":"aab80b2293e04946bbe535f61127d02c","title":"Renovate Building 1203-DOAS/AHU and Fire Suppression Water System, March Air Reserve Base, California","solicitation_number":"W912QR27BA001","notice_type":"p","first_type":"p","first_posted":"2026-09-03","last_posted":"2026-09-03","notices":1,"due_at":"2026-09-19T14:00:00Z","due_date":"2026-09-19","closes_at":"2026-09-19T14:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912QR","office_name":"W072 ENDIST LOUISVILLE","naics":"236220","psc":"Z2NB","set_aside":"SBA","state":"CA","county":"06065","county_name":"Riverside County","city":null,"city_name":null,"country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"W912QR26QA108","latest_notice_id":"6165f9ed360e440b902325a9cfad36b5","title":"Green River Lake- Floating Courtesy Dock","solicitation_number":"W912QR26QA108","notice_type":"o","first_type":"o","first_posted":"2026-09-03","last_posted":"2026-09-03","notices":1,"due_at":"2026-09-21T14:00:00Z","due_date":"2026-09-21","closes_at":"2026-09-21T14:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912QR","office_name":"W072 ENDIST LOUISVILLE","naics":"237990","psc":"Y1PZ","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"W912QR26QA109","latest_notice_id":"97509e22da974172a8af3c47ed55c224","title":"McAlpine Locks and Dam Life Safety and Canal Entrance Sign Installation","solicitation_number":"W912QR26QA109","notice_type":"o","first_type":"o","first_posted":"2026-09-03","last_posted":"2026-09-03","notices":1,"due_at":"2026-09-22T14:00:00Z","due_date":"2026-09-22","closes_at":"2026-09-22T14:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912QR","office_name":"W072 ENDIST LOUISVILLE","naics":"238990","psc":"M1KA","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"W912QR26QA113","latest_notice_id":"3b16cf332bec45d7918b6967e0ba0b04","title":"McAlpine Lock and Dam Control Tower HVAC Replacement","solicitation_number":"W912QR26QA113","notice_type":"k","first_type":"k","first_posted":"2026-09-08","last_posted":"2026-09-08","notices":3,"due_at":"2026-09-22T17:00:00Z","due_date":"2026-09-22","closes_at":"2026-09-22T17:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912QR","office_name":"W072 ENDIST LOUISVILLE","naics":"238220","psc":"Z2JZ","set_aside":"SBA","state":"KY","county":"21111","county_name":"Jefferson County","city":"2148000","city_name":"Louisville","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"W912QR26QA111","latest_notice_id":"f25e203d59ea4112963fe98d3c8e2cd9","title":"Caesar Creek Lake Dike Gravel Overlay","solicitation_number":"W912QR26QA111","notice_type":"k","first_type":"k","first_posted":"2026-09-08","last_posted":"2026-09-17","notices":5,"due_at":"2026-09-22T17:00:00Z","due_date":"2026-09-22","closes_at":"2026-09-22T17:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912QR","office_name":"W072 ENDIST LOUISVILLE","naics":"237310","psc":"Z2KA","set_aside":"SBA","state":"OH","county":"39165","county_name":"Warren County","city":"3982418","city_name":"Waynesville","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-18T04:00:44.545196Z"}]}