{"canonical":"https://abierto.us/opportunities/w912qr24amcvwpafb","key":"W912QR24AMCVWPAFB","url":"https://abierto.us/opportunities/w912qr24amcvwpafb","title":"Acquisition Management Complex Phase V (AMC-V)","solicitation_number":"W912QR24-AMCV-WPAFB","notice_type":"k","open":false,"response_deadline":"2024-08-12T17:00:00Z","first_posted":"2024-06-14","last_posted":"2024-07-31","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"W072 ENDIST LOUISVILLE","naics":"541330","psc":"C219","set_aside":null,"place_state":"OH","place_county":"39057","place_county_name":"Greene County","place_city":"3986660","place_city_name":"Wright-Patterson AFB","winner":null,"award_amount":null,"publications":[{"notice_id":"5bf2627d3d8c4c979bd26f115646168b","title":"P2# 519675 Acquisition Management Complex Phase V (AMC-V) - WPAFB, OH","solicitation_number":"W912QR24-AMCV-WPAFB","notice_type":"r","base_type":"r","posted":"2024-06-14","posted_at":null,"due_at":"2024-06-28T20:00:00Z","due_date":"2024-06-28","cancelled":null,"archived":null,"archive_date":"2024-07-13","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/5bf2627d3d8c4c979bd26f115646168b/view","enriched":false,"history":[]},{"notice_id":"758a5ea517984f03b34a13a49261030f","title":"Acquisition Management Complex Phase V (AMC-V)","solicitation_number":"W912QR24-AMCV-WPAFB","notice_type":"k","base_type":"k","posted":"2024-07-11","posted_at":null,"due_at":"2024-08-10T17:00:00Z","due_date":"2024-08-10","cancelled":null,"archived":null,"archive_date":"2024-08-11","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/758a5ea517984f03b34a13a49261030f/view","enriched":false,"history":[]},{"notice_id":"cb1b7fa5a3174fc882e79df35fa79e5b","title":"Acquisition Management Complex Phase V (AMC-V)","solicitation_number":"W912QR24-AMCV-WPAFB","notice_type":"k","base_type":"k","posted":"2024-07-12","posted_at":null,"due_at":"2024-08-10T17:00:00Z","due_date":"2024-08-10","cancelled":null,"archived":null,"archive_date":"2024-08-11","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/cb1b7fa5a3174fc882e79df35fa79e5b/view","enriched":false,"history":[]},{"notice_id":"1c67a3f90ec3441ab62b234830396fa9","title":"Acquisition Management Complex Phase V (AMC-V)","solicitation_number":"W912QR24-AMCV-WPAFB","notice_type":"k","base_type":"k","posted":"2024-07-31","posted_at":null,"due_at":"2024-08-12T17:00:00Z","due_date":"2024-08-12","cancelled":null,"archived":null,"archive_date":"2024-08-13","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/1c67a3f90ec3441ab62b234830396fa9/view","enriched":false,"history":[]}],"latest_notice_id":"1c67a3f90ec3441ab62b234830396fa9","first_type":"r","notices":[{"dates":{"posted":"2024-06-14","response_deadline":{"raw":"2024-06-28T16:00:00-04:00","utc":"2024-06-28T20:00:00Z","date":"2024-06-28","time":"16:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/5bf2627d3d8c4c979bd26f115646168b/view"},"naics":{"codes":["541330"],"primary":"541330"},"title":"P2# 519675 Acquisition Management Complex Phase V (AMC-V) - WPAFB, OH","agency":{"office":{"code":"W912QR","name":"W072 ENDIST LOUISVILLE"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"40202-2230","city":"LOUISVILLE","state":"KY","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-07-13","archive_type":"auto15"},"contacts":[{"name":"Morgan Greenwell","role":"primary","email":"morgan.l.greenwell@usace.army.mil"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"5bf2627d3d8c4c979bd26f115646168b","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"d0e5f15676289ea24b0bf8182c12b666dbf2132900d07b5d884809016b369f27","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"Description: A market survey is being conducted to make acquisition decisions about this future project and to determine if there are a reasonable number of interested small business concerns to set this future project aside for them. If your firm is a Small Business, certified HUBZone, 8(a), Woman-Owned Small Business, or Service-Disabled Veteran Owned Small Business and you are interested in this project, please respond appropriately. Proposed Requirement: This announcement is open to all business regardless of size. The Louisville District, U.S. Army Corps of Engineers has a need to award a firm fixed standalone contract to an Architectural & Engineering firm to develop a 35% design. Contract to also include options for: 65% design, 90% design, Corrected Final design, and Certified Final design and Construction Phase Support Services (CPSS). The estimated construction cost for the project is between $100,000,000 and $250,000,000. The selection authority will, in order of preference, list the firms most highly qualified to perform the work. At least one of the most highly qualified firms will be requested to submit a proposal. Negotiations will begin with the most highly qualified firm in the final selection. If a mutually satisfactory contract cannot be negotiated, the contracting officer will terminate negotiations with that firm and initiate negotiations with the next most preferred firm on the list. If a mutually satisfactory contract is negotiated with the most preferred firm, no additional negotiations will occur. Only one firm will be selected. Firms will be selected for negotiation based on demonstrated competence and qualifications for the required work. If necessary, secondary selection criteria will be used as a tiebreaker between firms considered as technically equal. Significant emphasis will be placed on the A/E’s quality control procedures, as the district will perform the quality assurance role only. Estimated start date is January 2025. In accordance with FAR 36.604 and supplements thereto, and upon final acceptance or termination, all A/E services contracts above $35,000 will receive a performance evaluation. An interim performance evaluations may be prepared at any time. Performance evaluations will be maintained for use in future source selections for A/E services. Project Specific Information: The Design Acquisition Management Complex Phase V (AMC-V) project will: demolish 3 facilities an approximately total of 29,533 SM (317,893 SF) to clear the site location; construct a primary facility of 19,900 SM (214,201.82 SF) which includes administrative space, special purpose space, miscellaneous infrastructure connections, and all necessary support; sitework includes the repair of the storm drainage and the resurface of the existing parking lot. The preliminary building concept design consists of reinforced concrete foundation and floor slab, structural frame, roof system and secure space. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building requirements. This project will comply with DoD Antiterrorism/Force Protection requirements per UFC 4-010-01 and Intelligence Community Directive 705 (ICD 705). Services Needed: Responses: Responses should include: Identification and verification of the company’s small business status. Contractor’s Unique Entity ID and CAGE Code(s). Identification of Senior Architects or Engineers. The government's evaluation of professional qualifications will consider education, training, certifications, registrations, overall experience, relevant experience, and longevity with the firm and longevity in current role/design discipline in the firm. Descriptions of Project Experience – Interested firms must provide no more than three (3) example projects with either greater than 90 percent construction completion or projects completed in the past seven (7) years. Each project must include the name, title, project role, e-mail address, and telephone number of at least one reference and % of design done by your firm on the project. References may be used to verify project size, scope, design-build or design-bid-build, dollar value, percentages, and quality of performance. Example projects must be of similar size and scope. List the project name and short description (1 paragraph) for each of the projects submitted; at least one project must have been done in the last two (2) years. Total submittal package shall be no longer than 10 pages. Projects similar in scope to this project include: Design of new construction of complete buildings with administrative offices with combined with secure spaces. Projects of similar size: New building of at least 15,920 SM (171,361 SF) of finished space. Email responses to Morgan Greenwell at Morgan.L.Greenwell@usace.army.mil no later than 28 June 2024 at 4:00 PM EDT. This is NOT a Request for Proposal and does not constitute any commitment by the Government. Responses to this Sources Sought notice will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitation announcements separately from responses to this market survey. NOTICE: The following information is provided for situational awareness and is not required to respond to this Sources Sought. All contractors must be registered in the System for Award Management (https://sam.gov) prior to award of a contract.","origin":"extract"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"W912QR24-AMCV-WPAFB","place_of_performance":{"zip":"45433","city":{"name":"Dayton"},"state":{"code":"OH"},"country":{"code":"USA"}},"product_service_code":"C219"},{"dates":{"posted":"2024-07-11","response_deadline":{"raw":"2024-08-10T13:00:00-04:00","utc":"2024-08-10T17:00:00Z","date":"2024-08-10","time":"13:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/758a5ea517984f03b34a13a49261030f/view"},"naics":{"codes":["541330"],"primary":"541330"},"title":"Acquisition Management Complex Phase V (AMC-V)","agency":{"office":{"code":"W912QR","name":"W072 ENDIST LOUISVILLE"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"40202-2230","city":"LOUISVILLE","state":"KY","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-08-11","archive_type":"auto_custom"},"contacts":[{"name":"Ranzel L. Merideth","role":"primary","email":"Ranzel.l.merideth@usace.army.mil"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"758a5ea517984f03b34a13a49261030f","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"1f6e4db8f0dac982393ad0384cdb6e7692560952ae0bb00db74fa6f300a90b08","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"Synopsis: The Design Acquisition Management Complex Phase V (AMC-V) project will construct a new 214,201 S.F. facility utilizing economical design and construction methods. The building will be the latest phase of the AMC Complex and shall be joined to the existing AMC buildings through the three-level precast concrete connecting arcade and tunnel. The building will consist of one level below grade and four-levels built above grade. The most recently constructed facility in the complex, AMC-IV (F/20553) will be used as a model for the massing, basic layout, exterior finishes, and architectural details. The exterior finishes will be required to match the existing AMC buildings, consisting of precast concrete wall panels, aluminum curtain wall systems, and accented entries with standing seam metal roofs. The program will primarily be secure administrative space and the required support spaces (restrooms, conference rooms, auditorium, etc.). There will be multiple customer groups involved, whose requirements will need to be determined and incorporated into the final design. While the basic site for the new building has been determined, a new site design will be required that includes sidewalk layout, revised parking layout, repairing the storm water drainage in addition to resurfacing of the parking lot will be included in the project. Stormwater shall be managed through storm drainage inlets and piping as sheet drainage cannot be accommodated. Utilities will need to be connected to the existing infrastructure. The AMC complex has a central utilities distribution plant denoted as CUSDC. Heat shall be provided by a new electric boiler to be located in the CUSDC Building with heating water piping extended through the tunnel. Sanitary service is provided through a lift station north of AMC-IV. Electrical power shall be extended from the CUSDC Building through feeders run through the service tunnel and AMC-V shall have a unit substation to provide the required building voltage. Telecommunications shall be served through a cable vault in the CUSDC Building. Separate plans for the demolition of three facilities will be developed as part of this effort. All three facilities will be demolished, graded, and seeded. F/20039 (18,982 SF) and F/20091 (3,918 SF) are stand-alone facilities. F/20016 (295,933 SF) will be a complex demolition effort. The facility shares walls with two existing facilities that are to remain and three pedestrian connectors to other facilities. The facilities removal will create additional different base systems that will create wider impact beyond just immediately adjacent facilities and will need to be addressed. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01: General Building requirements, all other UFCs as applicable, Air Force Corporate Facilities Standards (AFCFS) and the Wright-Patterson AFB Installation Facilities Standards (IFS). This project will comply with DoD Antiterrorism/Force Protection requirements per UFC 4-010-01 and Intelligence Community Directive 705 (ICD 705). A comprehensive interior design will need to be completed, to include both the structural interior design and a furniture, fixtures & equipment (FF&E) design package to be completed. Selection Criteria: Selection criteria in descending order of importance are listed below. \"a\" through \"d\" are primary, and \"e\" is secondary. a. Professional Qualifications: The government's evaluation of professional qualifications will consider education, training, certifications, registrations, overall experience, relevant experience, and longevity with the firm and longevity in current role/design discipline in the firm. b. Specialized Experience and Technical Competence and Partnered Relationships: The government's evaluation of Specialized Experience and Technical Competency will consider example projects in SF330 Section F which include the Specialized Experience and Technical Competencies noted below. Specialized Experience and Technical Competencies will also be evaluated under the SF330 Section E resumes as indicated in the brackets below. Successful execution of a 100% design of Large (approximately 100,000 square feet) Administrative Buildings with secure space (greater than 20,000 square feet), HQ or Command and Control Headquarters Building [Project Manager, Architect Designer, All Engineering Disciplines]. Design of Anti-Terrorism and Force Protection (ATFP) measures [Structural Designer, Civil Designer, and Architect Designer] Sustainable Design [Mechanical Designer, Electrical Designer, Architect Designer] Use of USACE CADBIM Policies and Procedures [CAD - Mechanical Designer, Electrical Designer, Structural Designer, Architect Designer] Construction cost estimating using MCASES MII [Cost Engineer] Performance of Design Charrettes [Project Manager] Use of SpecsIntact [Mechanical Designer, Electrical Designer, Structural Designer, Civil Designer, and Architect Designer] Additional consideration will be given to offerors who provide a Design Quality Management Plan in SF330 Section H that demonstrates a clear understanding of USACE quality management policies and that details quality management activities that will be used in addition to those required by USACE policy. Additional consideration will be given to offerors who demonstrate successful execution on previous projects that are comprised of the same AE team that is proposed for this project in Section G of the SF330. c. Capacity: The government's evaluation of the offeror's capacity narrative included in the Design Quality Management Plan in SF330 Section H will consider the offeror's ability to complete the work in the required time with the understanding that this contract may require multiple design teams to complete this project on time and within budget. d. Past Performance: The government's evaluation of past performance will consider the offeror's ability to design this project within funding limitations, comply with performance schedules, provide high quality design products, and minimize cost and time growth of the project during construction. e. Small Business Participation: The government's evaluation of the offeror's Small Business Participation plan will consider level of participation of Small Business, Small Disadvantaged Business, Woman-Owned Small Business, HUBZone Small Business, Service-Disabled Veteran-Owned Small Business and Veteran Owned Small Business team members. SUBMISSION REQUIREMENTS: Each branch office that will have a key role in the proposed contract must also submit a copy of the SF 330 Part II. Offerors must submit a current and accurate SF 330, Part II, for each proposed sub-consultant. Any firm with an electronic mailbox responding to the solicitation should identify such address in the SF 330, Part I. Please identify the Dun & Bradstreet number of the office(s) performing the work in Block 5 of the SF 330, Part I. Dun & Bradstreet numbers may be obtained by contacting (866) 705-5711, or via the internet at http://fedgov.dnb.com/webform. The proposal shall be submitted as one file using Microsoft Word (.docx) or Adobe Acrobat (.pdf). Font size shall be 10 or larger on white letter-sized paper (8 inches by 11 inches). The SF 330 will be no longer than 100 pages in length (excluding the SF 330, Part IIs) and Section H will be 20 pages or less in length and shall only include the Narratives described and required in this Presolicitation Notice. Dividers, bindings and cover sheets do not count against the total page count of the response to the RFP. Do not furnish design portfolios, prints, magazines, newspaper clippings, or CDs of completed projects. All requirements of this notice must be met for a firm to be considered responsive. Additional instructions and clarifications for SF330: SF330 Section D: The offerors shall submit an organizational chart as required by SF330 Section D. SF330 Section E: The individuals identified by the project roles on the SF330 may not have multiple duties or be \"dualhatted.\" Offerors shall provide individual resumes in SF330 Section E for each of the individuals listed below in lines 1 thru 23. Individuals included in SF330 Section E must possess the certifications and registrations listed below and must have performed in their respective role (i.e. project manager, architect designer, etc.) on projects similar to those listed in Paragraph 2 of this solicitation for the amount of time listed below. Projects listed on the SF330 must include if roles and responsibilities performed were design phase services or construction phase services and the duration of services performed. Additional consideration will be given to offerors who provide communications designer with a Registered Communication Distribution Designer (RCDD) certification. Additional consideration may be given for resumes that demonstrate more than the required minimum experience. 1. Project Manager; Registered Architect or Professional Engineer, 15 Years 2. Architect Designer, Registered Architect, 15 Years 3. Architect Designer, Registered Architect, 10 Years 4. Civil Designer, Registered Professional Engineer, 15 Years 5. Civil Designer, Registered Professional Engineer, 10 Years 6. Structural Designer, Registered Professional Engineer, 15 Years 7. Structural Designer, Registered Professional Engineer, 10 Years 8. Mechanical Designer, Registered Professional Engineer, 15 Years 9. Mechanical Designer, Registered Professional Engineer, 10 Years 10. Electrical Designer, Registered Professional Engineer, 15 Years 11. Electrical Designer, Registered Professional Engineer, 10 Years 12. Geotechnical Designer, Registered Professional Engineer, 15 Years 13. Geotechnical Designer, Registered Professional Engineer, 10 Years 14. Interior Designer, certified by the National Council of Interior Design Qualifications (NCIDQ), registered interior designers, or registered architect with at least five years of experience and training in interior design, 10 Years 15. Interior Designer certified by the National Council of Interior Design Qualifications (NCIDQ), registered interior designers, or registered architect with at least five years of experience and training in interior design, 10 Years 16. Communication Distribution Designer, No certification required, 10 years 17. Communication Distribution Checker, No certification required, 10 years 18. Cost Engineer, Certified Cost Engineer (CCE), Certified Cost Consultant (CCC), or comparable certification (American Society of Professional Estimators or Association for Advancement of Cost Engineering), 10 Years 19. Fire Protection Engineer, Registered Fire Protection Engineer, 10 years 20. Fire Protection Engineer, Registered Fire Protection Engineer, 10 years 21. Commissioning Agent, 5 years 22. CAD / BIM Technician Senior, 15 years 23. CAD / BIM Technician Junior, 5 years SF330 Section F: For all projects included in SF330 Section F, construction must be substantially complete. Substantially complete is defined as a construction project when the project and/or facility can be used for its intended purpose. Of the up to ten projects included in SF330 Section F, projects must be substantially complete within 10 years, a minimum of two must be fully designed by the offeror. The date in the Professional Services Block, Block 22, for the designers must be within 10 years of the date of this proposal submittal. Projects substantially complete outside of 10 years may be submitted but may be considered less relevant. An IDIQ contract may NOT be substituted as one of the ten projects; however, individual task orders meeting these requirements may be submitted. Additional consideration will be given to offerors who provide projects that are similar to the project features as described in Paragraph 2. SF330 Section H: In SF330 Section H, include an evaluation of performance from the client/owner for all example projects included in SF330 Section F. Performance evaluations will not be counted against the 20 page limit of SF330 Section H or the 100 page limit for the entire SF330. In SF330 Section H, each offeror shall present a Design Quality Management Plan including an explanation of the firm's management approach; management of sub-consultants (if applicable); quality control procedures (for plans, specification, design analysis and electronic documents); procedures to insure that internal resources are not over committed; and an organizational chart showing the inter-relationship of management and various team components (including sub-consultants). The Design Quality Management Plan shall also include a Capacity Narrative describing the offeror's ability to complete the work with available resources. In SF330 Section H, all large businesses shall present a Small Business and Small Disadvantaged Business Subcontracting Plan in accordance with Public Law 95-507 as part of the response to this RFQ. The number of pages of the Small Business Small Disadvantaged Business Plan do not count against the total page count for the response to the RFP. Additionally, estimate the proposed extent of participation of Small Business, Small Disadvantaged Business, Woman-Owned Small Business, HUBZone Small Business, Service-Disabled Veteran-Owned Small Business and Veteran Owned Small Business team members in the contract team using a chart showing each firm that is a team member, their small business category, and their proposed level of participation measured as a percentage of the overall estimated effort (i.e. a chart with 3 columns, respectively entitled 'Firm Name', 'Small Business Category', and '% Participation'). In SF330, Section H, the proposal may include up to a one page narrative on past performance on Indefinite Delivery/Indefinite Quantity contracts with federal agencies. Release of firm status will occur within 10 days after approval of any selection. All responses on SF 330 to this announcement must be received no later than 12:00 p.m. (noon) Eastern Time on 14 January 2019. No other general notification to firms under consideration for this project will be made. Facsimile transmissions will not be accepted. Solicitation packages are not provided and no additional project information will be given to firms during the announcement period. Projnet.org can be used to submit requests for information. www.projnet.org Bidder Inquiry Key: QYR425-E8QQBX","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"W912QR24-AMCV-WPAFB","place_of_performance":{"city":{"name":"Wright Patterson AFB"},"state":{"code":"OH"},"country":{"code":"USA"}},"product_service_code":"C219"},{"dates":{"posted":"2024-07-12","response_deadline":{"raw":"2024-08-10T13:00:00-04:00","utc":"2024-08-10T17:00:00Z","date":"2024-08-10","time":"13:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/cb1b7fa5a3174fc882e79df35fa79e5b/view"},"naics":{"codes":["541330"],"primary":"541330"},"title":"Acquisition Management Complex Phase V (AMC-V)","agency":{"office":{"code":"W912QR","name":"W072 ENDIST LOUISVILLE"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"40202-2230","city":"LOUISVILLE","state":"KY","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-08-11","archive_type":"auto_custom"},"contacts":[{"name":"Ranzel L. Merideth","role":"primary","email":"Ranzel.l.merideth@usace.army.mil"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"cb1b7fa5a3174fc882e79df35fa79e5b","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"0cfac91d02c0d5e03da857f3bd8ca9b163858d1b0fa1415e1bd174a3c29dff27","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"Synopsis: The Design Acquisition Management Complex Phase V (AMC-V) project will construct a new 214,201 S.F. facility utilizing economical design and construction methods. The building will be the latest phase of the AMC Complex and shall be joined to the existing AMC buildings through the three-level precast concrete connecting arcade and tunnel. The building will consist of one level below grade and four-levels built above grade. The most recently constructed facility in the complex, AMC-IV (F/20553) will be used as a model for the massing, basic layout, exterior finishes, and architectural details. The exterior finishes will be required to match the existing AMC buildings, consisting of precast concrete wall panels, aluminum curtain wall systems, and accented entries with standing seam metal roofs. The program will primarily be secure administrative space and the required support spaces (restrooms, conference rooms, auditorium, etc.). There will be multiple customer groups involved, whose requirements will need to be determined and incorporated into the final design. While the basic site for the new building has been determined, a new site design will be required that includes sidewalk layout, revised parking layout, repairing the storm water drainage in addition to resurfacing of the parking lot will be included in the project. Stormwater shall be managed through storm drainage inlets and piping as sheet drainage cannot be accommodated. Utilities will need to be connected to the existing infrastructure. The AMC complex has a central utilities distribution plant denoted as CUSDC. Heat shall be provided by a new electric boiler to be located in the CUSDC Building with heating water piping extended through the tunnel. Sanitary service is provided through a lift station north of AMC-IV. Electrical power shall be extended from the CUSDC Building through feeders run through the service tunnel and AMC-V shall have a unit substation to provide the required building voltage. Telecommunications shall be served through a cable vault in the CUSDC Building. Separate plans for the demolition of three facilities will be developed as part of this effort. All three facilities will be demolished, graded, and seeded. F/20039 (18,982 SF) and F/20091 (3,918 SF) are stand-alone facilities. F/20016 (295,933 SF) will be a complex demolition effort. The facility shares walls with two existing facilities that are to remain and three pedestrian connectors to other facilities. The facilities removal will create additional different base systems that will create wider impact beyond just immediately adjacent facilities and will need to be addressed. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01: General Building requirements, all other UFCs as applicable, Air Force Corporate Facilities Standards (AFCFS) and the Wright-Patterson AFB Installation Facilities Standards (IFS). This project will comply with DoD Antiterrorism/Force Protection requirements per UFC 4-010-01 and Intelligence Community Directive 705 (ICD 705). A comprehensive interior design will need to be completed, to include both the structural interior design and a furniture, fixtures & equipment (FF&E) design package to be completed. Selection Criteria: Selection criteria in descending order of importance are listed below. \"a\" through \"d\" are primary, and \"e\" is secondary. a. Professional Qualifications: The government's evaluation of professional qualifications will consider education, training, certifications, registrations, overall experience, relevant experience, and longevity with the firm and longevity in current role/design discipline in the firm. b. Specialized Experience and Technical Competence and Partnered Relationships: The government's evaluation of Specialized Experience and Technical Competency will consider example projects in SF330 Section F which include the Specialized Experience and Technical Competencies noted below. Specialized Experience and Technical Competencies will also be evaluated under the SF330 Section E resumes as indicated in the brackets below. Successful execution of a 100% design of Large (approximately 100,000 square feet) Administrative Buildings with secure space (greater than 20,000 square feet), HQ or Command and Control Headquarters Building [Project Manager, Architect Designer, All Engineering Disciplines]. Design of Anti-Terrorism and Force Protection (ATFP) measures [Structural Designer, Civil Designer, and Architect Designer] Sustainable Design [Mechanical Designer, Electrical Designer, Architect Designer] Use of USACE CADBIM Policies and Procedures [CAD - Mechanical Designer, Electrical Designer, Structural Designer, Architect Designer] Construction cost estimating using MCASES MII [Cost Engineer] Performance of Design Charrettes [Project Manager] Use of SpecsIntact [Mechanical Designer, Electrical Designer, Structural Designer, Civil Designer, and Architect Designer] Additional consideration will be given to offerors who provide a Design Quality Management Plan in SF330 Section H that demonstrates a clear understanding of USACE quality management policies and that details quality management activities that will be used in addition to those required by USACE policy. Additional consideration will be given to offerors who demonstrate successful execution on previous projects that are comprised of the same AE team that is proposed for this project in Section G of the SF330. c. Capacity: The government's evaluation of the offeror's capacity narrative included in the Design Quality Management Plan in SF330 Section H will consider the offeror's ability to complete the work in the required time with the understanding that this contract may require multiple design teams to complete this project on time and within budget. d. Past Performance: The government's evaluation of past performance will consider the offeror's ability to design this project within funding limitations, comply with performance schedules, provide high quality design products, and minimize cost and time growth of the project during construction. e. Small Business Participation: The government's evaluation of the offeror's Small Business Participation plan will consider level of participation of Small Business, Small Disadvantaged Business, Woman-Owned Small Business, HUBZone Small Business, Service-Disabled Veteran-Owned Small Business and Veteran Owned Small Business team members. SUBMISSION REQUIREMENTS: Each branch office that will have a key role in the proposed contract must also submit a copy of the SF 330 Part II. Offerors must submit a current and accurate SF 330, Part II, for each proposed sub-consultant. Any firm with an electronic mailbox responding to the solicitation should identify such address in the SF 330, Part I. Please identify the Dun & Bradstreet number of the office(s) performing the work in Block 5 of the SF 330, Part I. Dun & Bradstreet numbers may be obtained by contacting (866) 705-5711, or via the internet at http://fedgov.dnb.com/webform. The proposal shall be submitted as one file using Microsoft Word (.docx) or Adobe Acrobat (.pdf). Font size shall be 10 or larger on white letter-sized paper (8 inches by 11 inches). The SF 330 will be no longer than 100 pages in length (excluding the SF 330, Part IIs) and Section H will be 20 pages or less in length and shall only include the Narratives described and required in this Presolicitation Notice. Dividers, bindings and cover sheets do not count against the total page count of the response to the RFP. Do not furnish design portfolios, prints, magazines, newspaper clippings, or CDs of completed projects. All requirements of this notice must be met for a firm to be considered responsive. Additional instructions and clarifications for SF330: SF330 Section D: The offerors shall submit an organizational chart as required by SF330 Section D. SF330 Section E: The individuals identified by the project roles on the SF330 may not have multiple duties or be \"dualhatted.\" Offerors shall provide individual resumes in SF330 Section E for each of the individuals listed below in lines 1 thru 23. Individuals included in SF330 Section E must possess the certifications and registrations listed below and must have performed in their respective role (i.e. project manager, architect designer, etc.) on projects similar to those listed in Paragraph 2 of this solicitation for the amount of time listed below. Projects listed on the SF330 must include if roles and responsibilities performed were design phase services or construction phase services and the duration of services performed. Additional consideration will be given to offerors who provide communications designer with a Registered Communication Distribution Designer (RCDD) certification. Additional consideration may be given for resumes that demonstrate more than the required minimum experience. 1. Project Manager; Registered Architect or Professional Engineer, 15 Years 2. Architect Designer, Registered Architect, 15 Years 3. Architect Designer, Registered Architect, 10 Years 4. Civil Designer, Registered Professional Engineer, 15 Years 5. Civil Designer, Registered Professional Engineer, 10 Years 6. Structural Designer, Registered Professional Engineer, 15 Years 7. Structural Designer, Registered Professional Engineer, 10 Years 8. Mechanical Designer, Registered Professional Engineer, 15 Years 9. Mechanical Designer, Registered Professional Engineer, 10 Years 10. Electrical Designer, Registered Professional Engineer, 15 Years 11. Electrical Designer, Registered Professional Engineer, 10 Years 12. Geotechnical Designer, Registered Professional Engineer, 15 Years 13. Geotechnical Designer, Registered Professional Engineer, 10 Years 14. Interior Designer, certified by the National Council of Interior Design Qualifications (NCIDQ), registered interior designers, or registered architect with at least five years of experience and training in interior design, 10 Years 15. Interior Designer certified by the National Council of Interior Design Qualifications (NCIDQ), registered interior designers, or registered architect with at least five years of experience and training in interior design, 10 Years 16. Communication Distribution Designer, No certification required, 10 years 17. Communication Distribution Checker, No certification required, 10 years 18. Cost Engineer, Certified Cost Engineer (CCE), Certified Cost Consultant (CCC), or comparable certification (American Society of Professional Estimators or Association for Advancement of Cost Engineering), 10 Years 19. Fire Protection Engineer, Registered Fire Protection Engineer, 10 years 20. Fire Protection Engineer, Registered Fire Protection Engineer, 10 years 21. Commissioning Agent, 5 years 22. CAD / BIM Technician Senior, 15 years 23. CAD / BIM Technician Junior, 5 years SF330 Section F: For all projects included in SF330 Section F, construction must be substantially complete. Substantially complete is defined as a construction project when the project and/or facility can be used for its intended purpose. Of the up to ten projects included in SF330 Section F, projects must be substantially complete within 10 years, a minimum of two must be fully designed by the offeror. The date in the Professional Services Block, Block 22, for the designers must be within 10 years of the date of this proposal submittal. Projects substantially complete outside of 10 years may be submitted but may be considered less relevant. An IDIQ contract may NOT be substituted as one of the ten projects; however, individual task orders meeting these requirements may be submitted. Additional consideration will be given to offerors who provide projects that are similar to the project features as described in Paragraph 2. SF330 Section H: In SF330 Section H, include an evaluation of performance from the client/owner for all example projects included in SF330 Section F. Performance evaluations will not be counted against the 20 page limit of SF330 Section H or the 100 page limit for the entire SF330. In SF330 Section H, each offeror shall present a Design Quality Management Plan including an explanation of the firm's management approach; management of sub-consultants (if applicable); quality control procedures (for plans, specification, design analysis and electronic documents); procedures to insure that internal resources are not over committed; and an organizational chart showing the inter-relationship of management and various team components (including sub-consultants). The Design Quality Management Plan shall also include a Capacity Narrative describing the offeror's ability to complete the work with available resources. In SF330 Section H, all large businesses shall present a Small Business and Small Disadvantaged Business Subcontracting Plan in accordance with Public Law 95-507 as part of the response to this RFQ. The number of pages of the Small Business Small Disadvantaged Business Plan do not count against the total page count for the response to the RFP. Additionally, estimate the proposed extent of participation of Small Business, Small Disadvantaged Business, Woman-Owned Small Business, HUBZone Small Business, Service-Disabled Veteran-Owned Small Business and Veteran Owned Small Business team members in the contract team using a chart showing each firm that is a team member, their small business category, and their proposed level of participation measured as a percentage of the overall estimated effort (i.e. a chart with 3 columns, respectively entitled 'Firm Name', 'Small Business Category', and '% Participation'). In SF330, Section H, the proposal may include up to a one page narrative on past performance on Indefinite Delivery/Indefinite Quantity contracts with federal agencies. Release of firm status will occur within 10 days after approval of any selection. All responses on SF 330 to this announcement must be received no later than 1:00 p.m. (noon) Eastern Time on 10 August 2024. No other general notification to firms under consideration for this project will be made. Facsimile transmissions will not be accepted. Solicitation packages are not provided and no additional project information will be given to firms during the announcement period. Projnet.org can be used to submit requests for information. www.projnet.org Bidder Inquiry Key: QYR425-E8QQBX","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"W912QR24-AMCV-WPAFB","place_of_performance":{"city":{"name":"Wright Patterson AFB"},"state":{"code":"OH"},"country":{"code":"USA"}},"product_service_code":"C219"},{"dates":{"posted":"2024-07-31","response_deadline":{"raw":"2024-08-12T13:00:00-04:00","utc":"2024-08-12T17:00:00Z","date":"2024-08-12","time":"13:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/1c67a3f90ec3441ab62b234830396fa9/view"},"naics":{"codes":["541330"],"primary":"541330"},"title":"Acquisition Management Complex Phase V (AMC-V)","agency":{"office":{"code":"W912QR","name":"W072 ENDIST LOUISVILLE"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"40202-2230","city":"LOUISVILLE","state":"KY","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-08-13","archive_type":"auto_custom"},"contacts":[{"name":"Ranzel L. Merideth","role":"primary","email":"Ranzel.l.merideth@usace.army.mil"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"1c67a3f90ec3441ab62b234830396fa9","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"a2c7c468098444fa89986d429cb805d3684666f61159ba815d8c8329b93adbbb","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"AMDT 0001*************************************************************** SYNOPSIS: This announcement is open to all businesses regardless of size. The proposed services, which will be obtained by a negotiated Firm Fixed Price Contract, is for Full Design Architect/Engineer Services Contract for the construction of the Acquisition Management Complex Phase V (AMC-V) located at the Wright-Patterson Air Force Base, Ohio. This design contract will be for the AMC-V, associated facilities and site work. The contract duration is up to 60 months, including Title II Services. The estimated construction cost for the project is between $100,000,000 and $250,000,000. The selection authority will, in order of preference, list the firms most highly qualified to perform the work. At least three of the most highly qualified firms will be requested to submit a proposal. Negotiations will begin with the most preferred firm in the final selection. If a mutually satisfactory contract cannot be negotiated, the contracting officer will terminate negotiations with that firm and initiate negotiations with the next most preferred firm on the list. If a mutually satisfactory contract is negotiated with the most preferred firm, no additional negotiations will occur. Only on firm will be selected. Firms will be selected for negotiation based on demonstrated competence and qualifications for the required work. If necessary, secondary selection criteria will be used as a tiebreaker between firms considered as technically equal. Significant emphasis will be placed on the A/E’s quality control procedures, as the District will perform the quality assurance role only. Estimated start date is December 2024. In accordance with FAR 36.604 and supplements thereto, and upon final acceptance or termination, all A/E services contracts above $35,000 will receive a performance evaluation. Interim performance evaluations may be prepared at any time. Performance evaluations will be maintained for use in future source selections for A/E services. *********************************************************************AMDT 0001 PROJECT SPECIFIC INFORMATION: The Design Acquisition Management Complex Phase V (AMC-V) project will construct a new 214,201 S.F. facility utilizing economical design and construction methods. The building will be the latest phase of the AMC Complex and shall be joined to the existing AMC buildings through the three-level precast concrete connecting arcade and tunnel. The building will consist of one level below grade and four-levels built above grade. The most recently constructed facility in the complex, AMC-IV (F/20553) will be used as a model for the massing, basic layout, exterior finishes, and architectural details. The exterior finishes will be required to match the existing AMC buildings, consisting of precast concrete wall panels, aluminum curtain wall systems, and accented entries with standing seam metal roofs. The program will primarily be secure administrative space and the required support spaces (restrooms, conference rooms, auditorium, etc.). There will be multiple customer groups involved, whose requirements will need to be determined and incorporated into the final design. While the basic site for the new building has been determined, a new site design will be required that includes sidewalk layout, revised parking layout, repairing the storm water drainage in addition to resurfacing of the parking lot will be included in the project. Stormwater shall be managed through storm drainage inlets and piping as sheet drainage cannot be accommodated. Utilities will need to be connected to the existing infrastructure. The AMC complex has a central utilities distribution plant denoted as CUSDC. Heat shall be provided by a new electric boiler to be located in the CUSDC Building with heating water piping extended through the tunnel. Sanitary service is provided through a lift station north of AMC-IV. Electrical power shall be extended from the CUSDC Building through feeders run through the service tunnel and AMC-V shall have a unit substation to provide the required building voltage. Telecommunications shall be served through a cable vault in the CUSDC Building. Separate plans for the demolition of three facilities will be developed as part of this effort. All three facilities will be demolished, graded, and seeded. F/20039 (18,982 SF) and F/20091 (3,918 SF) are stand-alone facilities. F/20016 (295,933 SF) will be a complex demolition effort. The facility shares walls with two existing facilities that are to remain and three pedestrian connectors to other facilities. The facilities removal will create additional different base systems that will create wider impact beyond just immediately adjacent facilities and will need to be addressed. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01: General Building requirements, all other UFCs as applicable, Air Force Corporate Facilities Standards (AFCFS) and the Wright-Patterson AFB Installation Facilities Standards (IFS). This project will comply with DoD Antiterrorism/Force Protection requirements per UFC 4-010-01 and Intelligence Community Directive 705 (ICD 705). A comprehensive interior design will need to be completed, to include both the structural interior design and a furniture, fixtures & equipment (FF&E) design package to be completed. Selection Criteria: Selection criteria in descending order of importance are listed below. \"a\" through \"d\" are primary, and \"e\" is secondary. a. Professional Qualifications: The government's evaluation of professional qualifications will consider education, training, certifications, registrations, overall experience, relevant experience, and longevity with the firm and longevity in current role/design discipline in the firm. b. Specialized Experience and Technical Competence and Partnered Relationships: The government's evaluation of Specialized Experience and Technical Competency will consider example projects in SF330 Section F which include the Specialized Experience and Technical Competencies noted below. Specialized Experience and Technical Competencies will also be evaluated under the SF330 Section E resumes as indicated in the brackets below. Successful execution of a 100% design of Large (approximately 100,000 square feet) Administrative Buildings with secure space (greater than 20,000 square feet), HQ or Command and Control Headquarters Building [Project Manager, Architect Designer, All Engineering Disciplines]. Design of Anti-Terrorism and Force Protection (ATFP) measures [Structural Designer, Civil Designer, and Architect Designer] Sustainable Design [Mechanical Designer, Electrical Designer, Architect Designer] Use of USACE CADBIM Policies and Procedures [CAD - Mechanical Designer, Electrical Designer, Structural Designer, Architect Designer] Construction cost estimating using MCASES MII [Cost Engineer] Performance of Design Charrettes [Project Manager] Use of SpecsIntact [Mechanical Designer, Electrical Designer, Structural Designer, Civil Designer, and Architect Designer] Additional consideration will be given to offerors who provide a Design Quality Management Plan in SF330 Section H that demonstrates a clear understanding of USACE quality management policies and that details quality management activities that will be used in addition to those required by USACE policy. Additional consideration will be given to offerors who demonstrate successful execution on previous projects that are comprised of the same AE team that is proposed for this project in Section G of the SF330. c. Capacity: The government's evaluation of the offeror's capacity narrative included in the Design Quality Management Plan in SF330 Section H will consider the offeror's ability to complete the work in the required time with the understanding that this contract may require multiple design teams to complete this project on time and within budget. d. Past Performance: The government's evaluation of past performance will consider the offeror's ability to design this project within funding limitations, comply with performance schedules, provide high quality design products, and minimize cost and time growth of the project during construction. e. Small Business Participation: The government's evaluation of the offeror's Small Business Participation plan will consider level of participation of Small Business, Small Disadvantaged Business, Woman-Owned Small Business, HUBZone Small Business, Service-Disabled Veteran-Owned Small Business and Veteran Owned Small Business team members. AMDT 0001************************************************************************* SUBMISSION REQUIREMENTS: Each branch office that will have a key role in the proposed contract must also submit a copy of the SF 330 Part II. Offerors must submit a current and accurate SF 330, Part II, for each proposed sub-consultant. Any firm with an electronic mailbox responding to the solicitation should identify such address in the SF 330, Part I. Please identify the Dun & Bradstreet Unique Entity ID (UEI) number of the office(s) performing the work in Block 5 of the SF 330, Part I. Dun & Bradstreet numbers may be obtained by contacting (866) 705-5711, or via the internet at http://fedgov.dnb.com/webform. The UEI is a 12-character alphanumeric ID assigned to an entity by SAM.gov. Existing registered entities can find their UEI at SAM.gov. New entities can get their UEI at SAM.gov and, if required, complete an entity registration. ******************************************************************************AMDT 0001 The proposal shall be submitted as one file using Microsoft Word (.docx) or Adobe Acrobat (.pdf). Font size shall be 10 or larger on white letter-sized paper (8 inches by 11 inches). The SF 330 will be no longer than 100 pages in length (excluding the SF 330, Part IIs) and Section H will be 20 pages or less in length and shall only include the Narratives described and required in this Presolicitation Notice. Dividers, bindings and cover sheets do not count against the total page count of the response to the RFP. Do not furnish design portfolios, prints, magazines, newspaper clippings, or CDs of completed projects. All requirements of this notice must be met for a firm to be considered responsive. AMDT 0001********************************************************************************** Additional instructions and clarifications for SF330: SF330 Section D: The offerors shall submit an organizational chart as required by SF330 Section D. Offerors can submit an 11”x17” organizational chart as part of their submission. This will be considered only one page of their submission. SF330 Section E: The individuals identified by the project roles on the SF330 may not have multiple duties or be \"dualhatted.\" Offerors shall provide individual resumes in SF330 Section E for each of the individuals listed below in lines 1 thru 23. Individuals included in SF330 Section E must possess the certifications and registrations listed below and must have performed in their respective role (i.e. project manager, architect designer, etc.) on projects similar to those listed in Paragraph 2 and within 10 years of this solicitation for the amount of time listed below. ***********************************************************************************AMDT 0001 Projects listed on the SF330 must include if roles and responsibilities performed were design phase services or construction phase services and the duration of services performed. Additional consideration will be given to offerors who provide communications designer with a Registered Communication Distribution Designer (RCDD) certification. Additional consideration may be given for resumes that demonstrate more than the required minimum experience. 1. Project Manager; Registered Architect or Professional Engineer, 15 Years 2. Architect Designer, Registered Architect, 15 Years 3. Architect Designer, Registered Architect, 10 Years 4. Civil Designer, Registered Professional Engineer, 15 Years 5. Civil Designer, Registered Professional Engineer, 10 Years 6. Structural Designer, Registered Professional Engineer, 15 Years 7. Structural Designer, Registered Professional Engineer, 10 Years 8. Mechanical Designer, Registered Professional Engineer, 15 Years 9. Mechanical Designer, Registered Professional Engineer, 10 Years 10. Electrical Designer, Registered Professional Engineer, 15 Years 11. Electrical Designer, Registered Professional Engineer, 10 Years 12. Geotechnical Designer, Registered Professional Engineer, 15 Years 13. Geotechnical Designer, Registered Professional Engineer, 10 Years 14. Interior Designer, certified by the National Council of Interior Design Qualifications (NCIDQ), registered interior designers, or registered architect with at least five years of experience and training in interior design, 10 Years 15. Interior Designer certified by the National Council of Interior Design Qualifications (NCIDQ), registered interior designers, or registered architect with at least five years of experience and training in interior design, 10 Years 16. Communication Distribution Designer, No certification required, 10 years 17. Communication Distribution Checker, No certification required, 10 years 18. Cost Engineer, Certified Cost Engineer (CCE), Certified Cost Consultant (CCC), or comparable certification (American Society of Professional Estimators or Association for Advancement of Cost Engineering), 10 Years 19. Fire Protection Engineer, Registered Fire Protection Engineer, 10 years 20. Fire Protection Engineer, Registered Fire Protection Engineer, 10 years 21. Commissioning Agent, 5 years 22. CAD / BIM Technician Senior, 15 years 23. CAD / BIM Technician Junior, 5 years SF330 Section F: For all projects included in SF330 Section F, construction must be substantially complete. Substantially complete is defined as a construction project when the project and/or facility can be used for its intended purpose. Of the up to ten projects included in SF330 Section F, projects must be substantially complete within 10 years, a minimum of two must be fully designed by the offeror. The date in the Professional Services Block, Block 22, for the designers must be within 10 years of the date of this proposal submittal. Projects substantially complete outside of 10 years may be submitted but may be considered less relevant. An IDIQ contract may NOT be substituted as one of the ten projects; however, individual task orders meeting these requirements may be submitted. Additional consideration will be given to offerors who provide projects that are similar to the project features as described in Paragraph 2. SF330 Section H: In SF330 Section H, include an evaluation of performance from the client/owner for all example projects included in SF330 Section F. Performance evaluations will not be counted against the 20 page limit of SF330 Section H or the 100 page limit for the entire SF330. In SF330 Section H, each offeror shall present a Design Quality Management Plan including an explanation of the firm's management approach; management of sub-consultants (if applicable); quality control procedures (for plans, specification, design analysis and electronic documents); procedures to insure that internal resources are not over committed; and an organizational chart showing the inter-relationship of management and various team components (including sub-consultants). The Design Quality Management Plan shall also include a Capacity Narrative describing the offeror's ability to complete the work with available resources. In SF330 Section H, all large businesses shall present a Small Business and Small Disadvantaged Business Subcontracting Plan in accordance with Public Law 95-507 as part of the response to this RFQ. The number of pages of the Small Business Small Disadvantaged Business Plan do not count against the total page count for the response to the RFP. Additionally, estimate the proposed extent of participation of Small Business, Small Disadvantaged Business, Woman-Owned Small Business, HUBZone Small Business, Service-Disabled Veteran-Owned Small Business and Veteran Owned Small Business team members in the contract team using a chart showing each firm that is a team member, their small business category, and their proposed level of participation measured as a percentage of the overall estimated effort (i.e. a chart with 3 columns, respectively entitled 'Firm Name', 'Small Business Category', and '% Participation'). In SF330, Section H, the proposal may include up to a one page narrative on past performance on Indefinite Delivery/Indefinite Quantity contracts with federal agencies. Release of firm status will occur within 10 days after approval of any selection. All responses on SF 330 to this announcement must be received no later than 12:00 p.m. (noon) Eastern Time on 14 January 2019. No other general notification to firms under consideration for this project will be made. Facsimile transmissions will not be accepted. Solicitation packages are not provided and no additional project information will be given to firms during the announcement period. AMDT 0001******************************************************************************* OFFEROR'S QUESTIONS AND COMMENTS Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their proposals via ProjNet. Offerors shall submit their proposals in accordance with the provisions stated in the solicitation. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. The Solicitation Number is: W912QR24-AMCV-WPAFB Bidder Inquiry Key: QYR425-E8QQBX Specific Instructions for ProjNet Bid Inquiry Access: 1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen. 2. Identify the Agency. This should be marked as USACE. 3. Key. Enter the Bidder Inquiry Key listed above. 4. Email. Enter the email address you would like to use for communication. 5. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form. 6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system. 7. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system. Specific Instructions for Future ProjNet Bid Inquiry Access: 1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in. 2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen. 3. Identify the Agency. This should be marked as USACE. 4. Key. Enter the Bidder Inquiry Key listed above. 5. Email. Enter the email address you used to register previously in ProjNet. 6. Select Continue. A page will then open asking you to enter the answer to your Secret Question. 7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system. From this page you may view all bidder inquiries or add an inquiry. Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team. Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP. Information concerning the status of the evaluation and/or award will NOT be available after receipt of bids/proposals. NOTES: 1. Offerors shall not submit their proposals via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation. 2. Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the solicitation governs. Any changes or revisions to the solicitation will be made by formal amendment. Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the solicitation; or (c) Notice that a response is not necessary. The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled five (5) days prior to the closing date stated in the solicitation. No Government responses will be entered into the ProjNet system within two (2) days prior to the closing date stated in the solicitation. Proposals can be submitted via email to Mr. Ranzel Merideth at Ranzel.L.Merideth@usace.army.mil. Proposals are due 12-AUGUST-2024 at 1:00 PM Eastern time. ***********************************************************************************AMDT 0001","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"W912QR24-AMCV-WPAFB","place_of_performance":{"city":{"name":"Wright Patterson AFB"},"state":{"code":"OH"},"country":{"code":"USA"}},"product_service_code":"C219"}],"due_at":"2024-08-12T17:00:00Z","due_date":"2024-08-12","closes_at":"2024-08-12T17:00:00Z","awardable":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912QR","office_name":"W072 ENDIST LOUISVILLE","state":"OH","county":"39057","county_name":"Greene County","city":"3986660","city_name":"Wright-Patterson AFB","country":"USA","winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z","principal_notice_id":"1c67a3f90ec3441ab62b234830396fa9","description":{"text":"AMDT 0001*************************************************************** SYNOPSIS: This announcement is open to all businesses regardless of size. The proposed services, which will be obtained by a negotiated Firm Fixed Price Contract, is for Full Design Architect/Engineer Services Contract for the construction of the Acquisition Management Complex Phase V (AMC-V) located at the Wright-Patterson Air Force Base, Ohio. This design contract will be for the AMC-V, associated facilities and site work. The contract duration is up to 60 months, including Title II Services. The estimated construction cost for the project is between $100,000,000 and $250,000,000. The selection authority will, in order of preference, list the firms most highly qualified to perform the work. At least three of the most highly qualified firms will be requested to submit a proposal. Negotiations will begin with the most preferred firm in the final selection. If a mutually satisfactory contract cannot be negotiated, the contracting officer will terminate negotiations with that firm and initiate negotiations with the next most preferred firm on the list. If a mutually satisfactory contract is negotiated with the most preferred firm, no additional negotiations will occur. Only on firm will be selected. Firms will be selected for negotiation based on demonstrated competence and qualifications for the required work. If necessary, secondary selection criteria will be used as a tiebreaker between firms considered as technically equal. Significant emphasis will be placed on the A/E’s quality control procedures, as the District will perform the quality assurance role only. Estimated start date is December 2024. In accordance with FAR 36.604 and supplements thereto, and upon final acceptance or termination, all A/E services contracts above $35,000 will receive a performance evaluation. Interim performance evaluations may be prepared at any time. Performance evaluations will be maintained for use in future source selections for A/E services. *********************************************************************AMDT 0001 PROJECT SPECIFIC INFORMATION: The Design Acquisition Management Complex Phase V (AMC-V) project will construct a new 214,201 S.F. facility utilizing economical design and construction methods. The building will be the latest phase of the AMC Complex and shall be joined to the existing AMC buildings through the three-level precast concrete connecting arcade and tunnel. The building will consist of one level below grade and four-levels built above grade. The most recently constructed facility in the complex, AMC-IV (F/20553) will be used as a model for the massing, basic layout, exterior finishes, and architectural details. The exterior finishes will be required to match the existing AMC buildings, consisting of precast concrete wall panels, aluminum curtain wall systems, and accented entries with standing seam metal roofs. The program will primarily be secure administrative space and the required support spaces (restrooms, conference rooms, auditorium, etc.). There will be multiple customer groups involved, whose requirements will need to be determined and incorporated into the final design. While the basic site for the new building has been determined, a new site design will be required that includes sidewalk layout, revised parking layout, repairing the storm water drainage in addition to resurfacing of the parking lot will be included in the project. Stormwater shall be managed through storm drainage inlets and piping as sheet drainage cannot be accommodated. Utilities will need to be connected to the existing infrastructure. The AMC complex has a central utilities distribution plant denoted as CUSDC. Heat shall be provided by a new electric boiler to be located in the CUSDC Building with heating water piping extended through the tunnel. Sanitary service is provided through a lift station north of AMC-IV. Electrical power shall be extended from the CUSDC Building through feeders run through the service tunnel and AMC-V shall have a unit substation to provide the required building voltage. Telecommunications shall be served through a cable vault in the CUSDC Building. Separate plans for the demolition of three facilities will be developed as part of this effort. All three facilities will be demolished, graded, and seeded. F/20039 (18,982 SF) and F/20091 (3,918 SF) are stand-alone facilities. F/20016 (295,933 SF) will be a complex demolition effort. The facility shares walls with two existing facilities that are to remain and three pedestrian connectors to other facilities. The facilities removal will create additional different base systems that will create wider impact beyond just immediately adjacent facilities and will need to be addressed. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01: General Building requirements, all other UFCs as applicable, Air Force Corporate Facilities Standards (AFCFS) and the Wright-Patterson AFB Installation Facilities Standards (IFS). This project will comply with DoD Antiterrorism/Force Protection requirements per UFC 4-010-01 and Intelligence Community Directive 705 (ICD 705). A comprehensive interior design will need to be completed, to include both the structural interior design and a furniture, fixtures & equipment (FF&E) design package to be completed. Selection Criteria: Selection criteria in descending order of importance are listed below. \"a\" through \"d\" are primary, and \"e\" is secondary. a. Professional Qualifications: The government's evaluation of professional qualifications will consider education, training, certifications, registrations, overall experience, relevant experience, and longevity with the firm and longevity in current role/design discipline in the firm. b. Specialized Experience and Technical Competence and Partnered Relationships: The government's evaluation of Specialized Experience and Technical Competency will consider example projects in SF330 Section F which include the Specialized Experience and Technical Competencies noted below. Specialized Experience and Technical Competencies will also be evaluated under the SF330 Section E resumes as indicated in the brackets below. Successful execution of a 100% design of Large (approximately 100,000 square feet) Administrative Buildings with secure space (greater than 20,000 square feet), HQ or Command and Control Headquarters Building [Project Manager, Architect Designer, All Engineering Disciplines]. Design of Anti-Terrorism and Force Protection (ATFP) measures [Structural Designer, Civil Designer, and Architect Designer] Sustainable Design [Mechanical Designer, Electrical Designer, Architect Designer] Use of USACE CADBIM Policies and Procedures [CAD - Mechanical Designer, Electrical Designer, Structural Designer, Architect Designer] Construction cost estimating using MCASES MII [Cost Engineer] Performance of Design Charrettes [Project Manager] Use of SpecsIntact [Mechanical Designer, Electrical Designer, Structural Designer, Civil Designer, and Architect Designer] Additional consideration will be given to offerors who provide a Design Quality Management Plan in SF330 Section H that demonstrates a clear understanding of USACE quality management policies and that details quality management activities that will be used in addition to those required by USACE policy. Additional consideration will be given to offerors who demonstrate successful execution on previous projects that are comprised of the same AE team that is proposed for this project in Section G of the SF330. c. Capacity: The government's evaluation of the offeror's capacity narrative included in the Design Quality Management Plan in SF330 Section H will consider the offeror's ability to complete the work in the required time with the understanding that this contract may require multiple design teams to complete this project on time and within budget. d. Past Performance: The government's evaluation of past performance will consider the offeror's ability to design this project within funding limitations, comply with performance schedules, provide high quality design products, and minimize cost and time growth of the project during construction. e. Small Business Participation: The government's evaluation of the offeror's Small Business Participation plan will consider level of participation of Small Business, Small Disadvantaged Business, Woman-Owned Small Business, HUBZone Small Business, Service-Disabled Veteran-Owned Small Business and Veteran Owned Small Business team members. AMDT 0001************************************************************************* SUBMISSION REQUIREMENTS: Each branch office that will have a key role in the proposed contract must also submit a copy of the SF 330 Part II. Offerors must submit a current and accurate SF 330, Part II, for each proposed sub-consultant. Any firm with an electronic mailbox responding to the solicitation should identify such address in the SF 330, Part I. Please identify the Dun & Bradstreet Unique Entity ID (UEI) number of the office(s) performing the work in Block 5 of the SF 330, Part I. Dun & Bradstreet numbers may be obtained by contacting (866) 705-5711, or via the internet at http://fedgov.dnb.com/webform. The UEI is a 12-character alphanumeric ID assigned to an entity by SAM.gov. Existing registered entities can find their UEI at SAM.gov. New entities can get their UEI at SAM.gov and, if required, complete an entity registration. ******************************************************************************AMDT 0001 The proposal shall be submitted as one file using Microsoft Word (.docx) or Adobe Acrobat (.pdf). Font size shall be 10 or larger on white letter-sized paper (8 inches by 11 inches). The SF 330 will be no longer than 100 pages in length (excluding the SF 330, Part IIs) and Section H will be 20 pages or less in length and shall only include the Narratives described and required in this Presolicitation Notice. Dividers, bindings and cover sheets do not count against the total page count of the response to the RFP. Do not furnish design portfolios, prints, magazines, newspaper clippings, or CDs of completed projects. All requirements of this notice must be met for a firm to be considered responsive. AMDT 0001********************************************************************************** Additional instructions and clarifications for SF330: SF330 Section D: The offerors shall submit an organizational chart as required by SF330 Section D. Offerors can submit an 11”x17” organizational chart as part of their submission. This will be considered only one page of their submission. SF330 Section E: The individuals identified by the project roles on the SF330 may not have multiple duties or be \"dualhatted.\" Offerors shall provide individual resumes in SF330 Section E for each of the individuals listed below in lines 1 thru 23. Individuals included in SF330 Section E must possess the certifications and registrations listed below and must have performed in their respective role (i.e. project manager, architect designer, etc.) on projects similar to those listed in Paragraph 2 and within 10 years of this solicitation for the amount of time listed below. ***********************************************************************************AMDT 0001 Projects listed on the SF330 must include if roles and responsibilities performed were design phase services or construction phase services and the duration of services performed. Additional consideration will be given to offerors who provide communications designer with a Registered Communication Distribution Designer (RCDD) certification. Additional consideration may be given for resumes that demonstrate more than the required minimum experience. 1. Project Manager; Registered Architect or Professional Engineer, 15 Years 2. Architect Designer, Registered Architect, 15 Years 3. Architect Designer, Registered Architect, 10 Years 4. Civil Designer, Registered Professional Engineer, 15 Years 5. Civil Designer, Registered Professional Engineer, 10 Years 6. Structural Designer, Registered Professional Engineer, 15 Years 7. Structural Designer, Registered Professional Engineer, 10 Years 8. Mechanical Designer, Registered Professional Engineer, 15 Years 9. Mechanical Designer, Registered Professional Engineer, 10 Years 10. Electrical Designer, Registered Professional Engineer, 15 Years 11. Electrical Designer, Registered Professional Engineer, 10 Years 12. Geotechnical Designer, Registered Professional Engineer, 15 Years 13. Geotechnical Designer, Registered Professional Engineer, 10 Years 14. Interior Designer, certified by the National Council of Interior Design Qualifications (NCIDQ), registered interior designers, or registered architect with at least five years of experience and training in interior design, 10 Years 15. Interior Designer certified by the National Council of Interior Design Qualifications (NCIDQ), registered interior designers, or registered architect with at least five years of experience and training in interior design, 10 Years 16. Communication Distribution Designer, No certification required, 10 years 17. Communication Distribution Checker, No certification required, 10 years 18. Cost Engineer, Certified Cost Engineer (CCE), Certified Cost Consultant (CCC), or comparable certification (American Society of Professional Estimators or Association for Advancement of Cost Engineering), 10 Years 19. Fire Protection Engineer, Registered Fire Protection Engineer, 10 years 20. Fire Protection Engineer, Registered Fire Protection Engineer, 10 years 21. Commissioning Agent, 5 years 22. CAD / BIM Technician Senior, 15 years 23. CAD / BIM Technician Junior, 5 years SF330 Section F: For all projects included in SF330 Section F, construction must be substantially complete. Substantially complete is defined as a construction project when the project and/or facility can be used for its intended purpose. Of the up to ten projects included in SF330 Section F, projects must be substantially complete within 10 years, a minimum of two must be fully designed by the offeror. The date in the Professional Services Block, Block 22, for the designers must be within 10 years of the date of this proposal submittal. Projects substantially complete outside of 10 years may be submitted but may be considered less relevant. An IDIQ contract may NOT be substituted as one of the ten projects; however, individual task orders meeting these requirements may be submitted. Additional consideration will be given to offerors who provide projects that are similar to the project features as described in Paragraph 2. SF330 Section H: In SF330 Section H, include an evaluation of performance from the client/owner for all example projects included in SF330 Section F. Performance evaluations will not be counted against the 20 page limit of SF330 Section H or the 100 page limit for the entire SF330. In SF330 Section H, each offeror shall present a Design Quality Management Plan including an explanation of the firm's management approach; management of sub-consultants (if applicable); quality control procedures (for plans, specification, design analysis and electronic documents); procedures to insure that internal resources are not over committed; and an organizational chart showing the inter-relationship of management and various team components (including sub-consultants). The Design Quality Management Plan shall also include a Capacity Narrative describing the offeror's ability to complete the work with available resources. In SF330 Section H, all large businesses shall present a Small Business and Small Disadvantaged Business Subcontracting Plan in accordance with Public Law 95-507 as part of the response to this RFQ. The number of pages of the Small Business Small Disadvantaged Business Plan do not count against the total page count for the response to the RFP. Additionally, estimate the proposed extent of participation of Small Business, Small Disadvantaged Business, Woman-Owned Small Business, HUBZone Small Business, Service-Disabled Veteran-Owned Small Business and Veteran Owned Small Business team members in the contract team using a chart showing each firm that is a team member, their small business category, and their proposed level of participation measured as a percentage of the overall estimated effort (i.e. a chart with 3 columns, respectively entitled 'Firm Name', 'Small Business Category', and '% Participation'). In SF330, Section H, the proposal may include up to a one page narrative on past performance on Indefinite Delivery/Indefinite Quantity contracts with federal agencies. Release of firm status will occur within 10 days after approval of any selection. All responses on SF 330 to this announcement must be received no later than 12:00 p.m. (noon) Eastern Time on 14 January 2019. No other general notification to firms under consideration for this project will be made. Facsimile transmissions will not be accepted. Solicitation packages are not provided and no additional project information will be given to firms during the announcement period. AMDT 0001******************************************************************************* OFFEROR'S QUESTIONS AND COMMENTS Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their proposals via ProjNet. Offerors shall submit their proposals in accordance with the provisions stated in the solicitation. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. The Solicitation Number is: W912QR24-AMCV-WPAFB Bidder Inquiry Key: QYR425-E8QQBX Specific Instructions for ProjNet Bid Inquiry Access: 1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen. 2. Identify the Agency. This should be marked as USACE. 3. Key. Enter the Bidder Inquiry Key listed above. 4. Email. Enter the email address you would like to use for communication. 5. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form. 6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system. 7. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system. Specific Instructions for Future ProjNet Bid Inquiry Access: 1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in. 2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen. 3. Identify the Agency. This should be marked as USACE. 4. Key. Enter the Bidder Inquiry Key listed above. 5. Email. Enter the email address you used to register previously in ProjNet. 6. Select Continue. A page will then open asking you to enter the answer to your Secret Question. 7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system. From this page you may view all bidder inquiries or add an inquiry. Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team. Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP. Information concerning the status of the evaluation and/or award will NOT be available after receipt of bids/proposals. NOTES: 1. Offerors shall not submit their proposals via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation. 2. Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the solicitation governs. Any changes or revisions to the solicitation will be made by formal amendment. Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the solicitation; or (c) Notice that a response is not necessary. The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled five (5) days prior to the closing date stated in the solicitation. No Government responses will be entered into the ProjNet system within two (2) days prior to the closing date stated in the solicitation. Proposals can be submitted via email to Mr. Ranzel Merideth at Ranzel.L.Merideth@usace.army.mil. Proposals are due 12-AUGUST-2024 at 1:00 PM Eastern time. ***********************************************************************************AMDT 0001","html":null,"origin":"extract"},"contacts":[{"name":"Ranzel L. Merideth","role":"primary","email":"Ranzel.l.merideth@usace.army.mil"}],"place_of_performance":{"city":{"name":"Wright Patterson AFB"},"state":{"code":"OH"},"country":{"code":"USA"}},"office_address":{"zip":"40202-2230","city":"LOUISVILLE","state":"KY","country":"USA"},"naics_codes":["541330"],"award":null,"attachments":[],"awards":[],"related":[{"key":"W912QR27BA001","latest_notice_id":"aab80b2293e04946bbe535f61127d02c","title":"Renovate Building 1203-DOAS/AHU and Fire Suppression Water System, March Air Reserve Base, California","solicitation_number":"W912QR27BA001","notice_type":"p","first_type":"p","first_posted":"2026-09-03","last_posted":"2026-09-03","notices":1,"due_at":"2026-09-19T14:00:00Z","due_date":"2026-09-19","closes_at":"2026-09-19T14:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912QR","office_name":"W072 ENDIST LOUISVILLE","naics":"236220","psc":"Z2NB","set_aside":"SBA","state":"CA","county":"06065","county_name":"Riverside County","city":null,"city_name":null,"country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"W912QR26QA108","latest_notice_id":"6165f9ed360e440b902325a9cfad36b5","title":"Green River Lake- Floating Courtesy Dock","solicitation_number":"W912QR26QA108","notice_type":"o","first_type":"o","first_posted":"2026-09-03","last_posted":"2026-09-03","notices":1,"due_at":"2026-09-21T14:00:00Z","due_date":"2026-09-21","closes_at":"2026-09-21T14:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912QR","office_name":"W072 ENDIST LOUISVILLE","naics":"237990","psc":"Y1PZ","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"W912QR26QA109","latest_notice_id":"97509e22da974172a8af3c47ed55c224","title":"McAlpine Locks and Dam Life Safety and Canal Entrance Sign Installation","solicitation_number":"W912QR26QA109","notice_type":"o","first_type":"o","first_posted":"2026-09-03","last_posted":"2026-09-03","notices":1,"due_at":"2026-09-22T14:00:00Z","due_date":"2026-09-22","closes_at":"2026-09-22T14:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912QR","office_name":"W072 ENDIST LOUISVILLE","naics":"238990","psc":"M1KA","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"W912QR26QA113","latest_notice_id":"3b16cf332bec45d7918b6967e0ba0b04","title":"McAlpine Lock and Dam Control Tower HVAC Replacement","solicitation_number":"W912QR26QA113","notice_type":"k","first_type":"k","first_posted":"2026-09-08","last_posted":"2026-09-08","notices":3,"due_at":"2026-09-22T17:00:00Z","due_date":"2026-09-22","closes_at":"2026-09-22T17:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912QR","office_name":"W072 ENDIST LOUISVILLE","naics":"238220","psc":"Z2JZ","set_aside":"SBA","state":"KY","county":"21111","county_name":"Jefferson County","city":"2148000","city_name":"Louisville","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"W912QR26QA111","latest_notice_id":"f25e203d59ea4112963fe98d3c8e2cd9","title":"Caesar Creek Lake Dike Gravel Overlay","solicitation_number":"W912QR26QA111","notice_type":"k","first_type":"k","first_posted":"2026-09-08","last_posted":"2026-09-17","notices":5,"due_at":"2026-09-22T17:00:00Z","due_date":"2026-09-22","closes_at":"2026-09-22T17:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912QR","office_name":"W072 ENDIST LOUISVILLE","naics":"237310","psc":"Z2KA","set_aside":"SBA","state":"OH","county":"39165","county_name":"Warren County","city":"3982418","city_name":"Waynesville","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-18T04:00:44.545196Z"}]}