{"canonical":"https://abierto.us/opportunities/w912p725ba003","key":"W912P725BA003","url":"https://abierto.us/opportunities/w912p725ba003","title":"San Joaquin/Port of Stockton DWSC FY25 Maintenance Dredging Project","solicitation_number":"W912P725BA003","notice_type":"a","open":false,"response_deadline":"2025-05-19T20:00:00Z","first_posted":"2025-03-21","last_posted":"2025-06-04","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"W075 ENDIST SAN FRAN","naics":"237990","psc":"Z1KF","set_aside":null,"place_state":"CA","place_county":"06077","place_county_name":"San Joaquin County","place_city":"0675000","place_city_name":"Stockton","winner":"CURTIN MARITIME CORP","award_amount":"5924354.60","publications":[{"notice_id":"bd2450f929714b6c99043980b665f46f","title":"San Joaquin/Port of Stockton DWSC FY25 Maintenance Dredging Project","solicitation_number":"W912P725BA003","notice_type":"p","base_type":"p","posted":"2025-03-21","posted_at":null,"due_at":"2025-04-08T23:30:00Z","due_date":"2025-04-08","cancelled":null,"archived":null,"archive_date":"2025-04-23","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/bd2450f929714b6c99043980b665f46f/view","enriched":false,"history":[]},{"notice_id":"5d0147b802e64f1a933cabcb7ece649c","title":"San Joaquin/Port of Stockton DWSC FY25 Maintenance Dredging Project","solicitation_number":"W912P725BA003","notice_type":"o","base_type":"o","posted":"2025-04-17","posted_at":null,"due_at":"2025-05-19T20:00:00Z","due_date":"2025-05-19","cancelled":null,"archived":null,"archive_date":"2025-06-03","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/5d0147b802e64f1a933cabcb7ece649c/view","enriched":false,"history":[]},{"notice_id":"4aaef6f177a4403393bed186e65850c9","title":"San Joaquin/Port of Stockton DWSC FY25 Maintenance Dredging Project","solicitation_number":"W912P725BA003","notice_type":"o","base_type":"o","posted":"2025-04-29","posted_at":null,"due_at":"2025-05-19T20:00:00Z","due_date":"2025-05-19","cancelled":null,"archived":null,"archive_date":"2025-06-03","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/4aaef6f177a4403393bed186e65850c9/view","enriched":false,"history":[]},{"notice_id":"01472873a9524da48c075091e1fd6f3b","title":"San Joaquin/Port of Stockton DWSC FY25 Maintenance Dredging Project","solicitation_number":"W912P725BA003","notice_type":"o","base_type":"o","posted":"2025-05-05","posted_at":null,"due_at":"2025-05-19T20:00:00Z","due_date":"2025-05-19","cancelled":null,"archived":null,"archive_date":"2025-06-03","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/01472873a9524da48c075091e1fd6f3b/view","enriched":false,"history":[]},{"notice_id":"0789da31b49744e1bd50a90207d148f0","title":"San Joaquin/Port of Stockton DWSC FY25 Maintenance Dredging Project","solicitation_number":"W912P725BA003","notice_type":"o","base_type":"o","posted":"2025-05-12","posted_at":null,"due_at":"2025-05-19T20:00:00Z","due_date":"2025-05-19","cancelled":null,"archived":null,"archive_date":"2025-06-03","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/0789da31b49744e1bd50a90207d148f0/view","enriched":false,"history":[]},{"notice_id":"698db04969334885a562dfce90513979","title":"San Joaquin/Port of Stockton DWSC FY25 Maintenance Dredging Project","solicitation_number":"W912P725BA003","notice_type":"o","base_type":"o","posted":"2025-05-13","posted_at":null,"due_at":"2025-05-19T20:00:00Z","due_date":"2025-05-19","cancelled":null,"archived":null,"archive_date":"2025-06-03","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/698db04969334885a562dfce90513979/view","enriched":false,"history":[]},{"notice_id":"16795cd8ff2141e793fd30b3eba83dae","title":"San Joaquin/Port of Stockton DWSC FY25 Maintenance Dredging Project","solicitation_number":"W912P725BA003","notice_type":"o","base_type":"o","posted":"2025-05-14","posted_at":null,"due_at":"2025-05-19T20:00:00Z","due_date":"2025-05-19","cancelled":null,"archived":null,"archive_date":"2025-06-03","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/16795cd8ff2141e793fd30b3eba83dae/view","enriched":false,"history":[]},{"notice_id":"6279bb3616f1449eabb0782651e5592c","title":"San Joaquin/Port of Stockton DWSC FY25 Maintenance Dredging Project","solicitation_number":"W912P725BA003","notice_type":"o","base_type":"o","posted":"2025-05-19","posted_at":null,"due_at":"2025-05-19T20:00:00Z","due_date":"2025-05-19","cancelled":null,"archived":null,"archive_date":"2025-06-03","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/6279bb3616f1449eabb0782651e5592c/view","enriched":false,"history":[]},{"notice_id":"af27b1e31bf3494899feced23b769c2e","title":"San Joaquin/Port of Stockton DWSC FY25 Maintenance Dredging Project","solicitation_number":"W912P725CA009","notice_type":"a","base_type":"o","posted":"2025-06-04","posted_at":null,"due_at":null,"due_date":null,"cancelled":null,"archived":null,"archive_date":"2025-06-19","award_number":"W912P725CA009","awardee_name":"CURTIN MARITIME CORP Long Beach","amount":"5924354.60","link_sam":"https://sam.gov/workspace/contract/opp/af27b1e31bf3494899feced23b769c2e/view","enriched":false,"history":[]}],"latest_notice_id":"af27b1e31bf3494899feced23b769c2e","first_type":"p","notices":[{"dates":{"posted":"2025-03-21","response_deadline":{"raw":"2025-04-08T16:30:00-07:00","utc":"2025-04-08T23:30:00Z","date":"2025-04-08","time":"16:30:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/bd2450f929714b6c99043980b665f46f/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"San Joaquin/Port of Stockton DWSC FY25 Maintenance Dredging Project","agency":{"office":{"code":"W912P7","name":"W075 ENDIST SAN FRAN"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"94102-3406","city":"SAN FRANCISCO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-04-23","archive_type":"auto15"},"contacts":[{"name":"Suntok Mcguinness","role":"primary","email":"suntok.mcguinness@usace.army.mil","phone":"4155032953"},{"fax":"4155036688","name":"Mary C. Fronck","role":"secondary","email":"mary.fronck@usace.army.mil","phone":"4155036554"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"bd2450f929714b6c99043980b665f46f","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"370302428e3e77be6e1bffd8e89395f68b0154e4b7e7953434ebafb7160cd0f9","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"This Procurement will be conducted under FSC CODE: Z1KF, NAICS Code: 237990. The size standard for this code is $37,000,000. All questions should be directed to the Contract Specialist, Suntok McGuinness: Suntok.mcguinness@usace.army.mil. Estimated Cost Range is between $5,000,000 - $10,000,000. JOB DESCRIPTION: The work includes maintenance dredging of the San Joaquin/Stockton DWSC FY25 Maintenance Dredging to -35-ft (MLLW) plus 1-ft of paid over-depth, except the Sediment Trap, which shall be dredged to -38.5-ft (MLLW) plus 1-ft of paid over depth. All dredge material is suitable for the upland sites shown on plan sheets. Dredge material may be suitable for beneficial reuses at Contractor furnished sites in accordance with the permit requirements of the specific reuse sites and per the requirements in specification Section 01 11 00 SUMMARY OF WORK, which will be included in the IFB. This requirement is for Full and Open Competition. It will be issued as an Invitation for Bid (IFB) which will result in the award of a single Firm Fixed Price (FFP) contract. The solicitation will be available on/about 15 April, 2025 for viewing/downloading. ALL BIDS will be due on/about 15 May, 2025 at 1:00 PM PST. The specific date and time will be identified in the solicitation. BIDDERS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED, OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, AND/OR FINAL AWARDPROCESS. Plans and specs will not be provided in hard copy or CD format. NOTE: In preparation for prospective to submit offers when the IFB is issued, it is imperative that all prospective Offerors (including their subcontractors) must be registered in the System for Award Management (SAM - www.SAM.gov) and the Procurement Integrated Enterprise Environment (PIEE) website in order to be able to view and download solicitation information, and to submit offers. 1) Solicitation documents, plans, and specifications are only available to be download from PIEE, which may be accessed at https://wawf.eb.mil OR https://piee.eb.mil OR https://piee.eb.mil/xhtml/unauth/home/login.xhtml. 2) Offers MUST BE submitted electronically through the PIEE website. 3) Registration should be completed one (1) week prior to the anticipated solicitation release date. USACE will not notify Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments. 4) See attachments “PIEE Solicitation Module Vendor Access Instructions”, “SOP PIEE Proposal Manager Offeror”, and “SOP PIEE Posting Offer” for instructions on getting access to the PIEE Solicitation Module and submitting Offeror proposals.","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"W912P725BA003","place_of_performance":{"zip":"95203","city":{"name":"Stockton"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Z1KF"},{"dates":{"posted":"2025-04-17","response_deadline":{"raw":"2025-05-19T13:00:00-07:00","utc":"2025-05-19T20:00:00Z","date":"2025-05-19","time":"13:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/5d0147b802e64f1a933cabcb7ece649c/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"San Joaquin/Port of Stockton DWSC FY25 Maintenance Dredging Project","agency":{"office":{"code":"W912P7","name":"W075 ENDIST SAN FRAN"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"94102-3406","city":"SAN FRANCISCO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-06-03","archive_type":"auto15"},"contacts":[{"name":"Suntok Mcguinness","role":"primary","email":"suntok.mcguinness@usace.army.mil","phone":"4155032953"},{"name":"Mary C. Fronck","role":"secondary","email":"mary.fronck@usace.army.mil","phone":"4155036554"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"5d0147b802e64f1a933cabcb7ece649c","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"673dab5235255fbb9029df371175a0ad32d6d79d2f745d874fd3fa51ef0dff47","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"The work includes annual maintenance dredging of the San Joaquin/Port of Stockton River DWSC to -35-ft (MLLW) plus 1-ft of paid over-depth, except the Sediment Trap, which shall be dredged to -38.5-ft (MLLW) plus 1-ft of paid over depth. All dredge material is suitable for the upland sites shown on plan sheets. Dredge material may be suitable for beneficial reuses at Contractor furnished sites in accordance with the permit requirements of the specific reuse sites and per the requirements in specification Section 01 11 00 SUMMARY OF WORK.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912P725BA003","place_of_performance":{"zip":"95203","city":{"name":"Stockton"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Z1KF"},{"dates":{"posted":"2025-04-29","response_deadline":{"raw":"2025-05-19T13:00:00-07:00","utc":"2025-05-19T20:00:00Z","date":"2025-05-19","time":"13:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/4aaef6f177a4403393bed186e65850c9/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"San Joaquin/Port of Stockton DWSC FY25 Maintenance Dredging Project","agency":{"office":{"code":"W912P7","name":"W075 ENDIST SAN FRAN"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"94102-3406","city":"SAN FRANCISCO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-06-03","archive_type":"auto15"},"contacts":[{"name":"Suntok Mcguinness","role":"primary","email":"suntok.mcguinness@usace.army.mil","phone":"4155032953"},{"name":"Mary C. Fronck","role":"secondary","email":"mary.fronck@usace.army.mil","phone":"4155036554"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"4aaef6f177a4403393bed186e65850c9","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"b7dd4650a978a3f4cf5e1891bab51be9db003dd077007d8147d6f046580442a0","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"Amendment 0001 - Updated Pricing (Bid) Schedule The work includes annual maintenance dredging of the San Joaquin/Port of Stockton River DWSC to -35-ft (MLLW) plus 1-ft of paid over-depth, except the Sediment Trap, which shall be dredged to -38.5-ft (MLLW) plus 1-ft of paid over depth. All dredge material is suitable for the upland sites shown on plan sheets. Dredge material may be suitable for beneficial reuses at Contractor furnished sites in accordance with the permit requirements of the specific reuse sites and per the requirements in specification Section 01 11 00 SUMMARY OF WORK.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912P725BA003","place_of_performance":{"zip":"95203","city":{"name":"Stockton"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Z1KF"},{"dates":{"posted":"2025-05-05","response_deadline":{"raw":"2025-05-19T13:00:00-07:00","utc":"2025-05-19T20:00:00Z","date":"2025-05-19","time":"13:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/01472873a9524da48c075091e1fd6f3b/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"San Joaquin/Port of Stockton DWSC FY25 Maintenance Dredging Project","agency":{"office":{"code":"W912P7","name":"W075 ENDIST SAN FRAN"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"94102-3406","city":"SAN FRANCISCO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-06-03","archive_type":"auto15"},"contacts":[{"name":"Suntok Mcguinness","role":"primary","email":"suntok.mcguinness@usace.army.mil","phone":"4155032953"},{"name":"Mary C. Fronck","role":"secondary","email":"mary.fronck@usace.army.mil","phone":"4155036554"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"01472873a9524da48c075091e1fd6f3b","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"eedd06414bcad8c76b05da13d976885e8bf4e068755b369090faaf4f1db16048","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"Amendment 0002 - A) INCORPORATE THE GOVERNMENT'S RESPONSE TO TWO SETS OF RFIS (REQUEST FOR INFORMATION) THAT WERE RECEIVED B) CORRECT THE TITLE OF THE DREDGING PLAN AND EQUIPMENT SCHEDULE FROM \"RICHMOND INNER HARBOR DREDGING PROJECT\" TO READ \"SAN JOAQUIN/PORT OF STOCKTON DWSC FY 25 MAINTENANCE DREDGING PROJECT\" C) DELETE FAR 52.246-21 WARRANTY OF CONSTRUCTION ---------------------------------------------------------------------------------------------------------------------------------------------------------------------- Amendment 0001 - Updated Pricing (Bid) Schedule ___________________________________________________________________________________________________ The work includes annual maintenance dredging of the San Joaquin/Port of Stockton River DWSC to -35-ft (MLLW) plus 1-ft of paid over-depth, except the Sediment Trap, which shall be dredged to -38.5-ft (MLLW) plus 1-ft of paid over depth. All dredge material is suitable for the upland sites shown on plan sheets. Dredge material may be suitable for beneficial reuses at Contractor furnished sites in accordance with the permit requirements of the specific reuse sites and per the requirements in specification Section 01 11 00 SUMMARY OF WORK.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912P725BA003","place_of_performance":{"zip":"95203","city":{"name":"Stockton"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Z1KF"},{"dates":{"posted":"2025-05-12","response_deadline":{"raw":"2025-05-19T13:00:00-07:00","utc":"2025-05-19T20:00:00Z","date":"2025-05-19","time":"13:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/0789da31b49744e1bd50a90207d148f0/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"San Joaquin/Port of Stockton DWSC FY25 Maintenance Dredging Project","agency":{"office":{"code":"W912P7","name":"W075 ENDIST SAN FRAN"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"94102-3406","city":"SAN FRANCISCO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-06-03","archive_type":"auto15"},"contacts":[{"name":"Suntok Mcguinness","role":"primary","email":"suntok.mcguinness@usace.army.mil","phone":"4155032953"},{"name":"Mary C. Fronck","role":"secondary","email":"mary.fronck@usace.army.mil","phone":"4155036554"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"0789da31b49744e1bd50a90207d148f0","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"3a2110eee328abae2bf8cafbc44cc1455929cec16dcf3a26b38bc7b4a40a8b77","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"**SPECIAL ANNOUNCEMENT: CONTRACT SPECIALIST POINT OF CONTACT DESIGNATION CHANGE. THE CONTRACT SPECIALIST ASSIGNED TO THIS SOLICITATION IS CHANGED FROM SUNTOK MCGUINNESS TO LISA IP (Lisa.I.Ip@usace.army.mil) WHERE FUTURE INQUIRIES OR CORRESPONDENCES CAN BE TRANSMITTED. MARY FRONK AS CONTRACTING OFFICER REMAIN UNCHANGED. --------- Amendment 0002 - A) INCORPORATE THE GOVERNMENT'S RESPONSE TO TWO SETS OF RFIS (REQUEST FOR INFORMATION) THAT WERE RECEIVED B) CORRECT THE TITLE OF THE DREDGING PLAN AND EQUIPMENT SCHEDULE FROM \"RICHMOND INNER HARBOR DREDGING PROJECT\" TO READ \"SAN JOAQUIN/PORT OF STOCKTON DWSC FY 25 MAINTENANCE DREDGING PROJECT\" C) DELETE FAR 52.246-21 WARRANTY OF CONSTRUCTION ---------------------------------------------------------------------------------------------------------------------------------------------------------------------- Amendment 0001 - Updated Pricing (Bid) Schedule ___________________________________________________________________________________________________ The work includes annual maintenance dredging of the San Joaquin/Port of Stockton River DWSC to -35-ft (MLLW) plus 1-ft of paid over-depth, except the Sediment Trap, which shall be dredged to -38.5-ft (MLLW) plus 1-ft of paid over depth. All dredge material is suitable for the upland sites shown on plan sheets. Dredge material may be suitable for beneficial reuses at Contractor furnished sites in accordance with the permit requirements of the specific reuse sites and per the requirements in specification Section 01 11 00 SUMMARY OF WORK.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912P725BA003","place_of_performance":{"zip":"95203","city":{"name":"Stockton"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Z1KF"},{"dates":{"posted":"2025-05-13","response_deadline":{"raw":"2025-05-19T13:00:00-07:00","utc":"2025-05-19T20:00:00Z","date":"2025-05-19","time":"13:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/698db04969334885a562dfce90513979/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"San Joaquin/Port of Stockton DWSC FY25 Maintenance Dredging Project","agency":{"office":{"code":"W912P7","name":"W075 ENDIST SAN FRAN"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"94102-3406","city":"SAN FRANCISCO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-06-03","archive_type":"auto15"},"contacts":[{"name":"Suntok Mcguinness","role":"primary","email":"suntok.mcguinness@usace.army.mil","phone":"4155032953"},{"name":"Mary C. Fronck","role":"secondary","email":"mary.fronck@usace.army.mil","phone":"4155036554"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"698db04969334885a562dfce90513979","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"8ed799f33a6f03f67e07eca9a7a35f92306c86e79ca737e1f030f1b4385dec84","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"**UPDATES ON 1.7 SPECIAL INSTRUCTIONS FOR SUBMITTING YOUR BID: PLEASE SEE ATTACHED. ----------------------------------- **SPECIAL ANNOUNCEMENT: CONTRACT SPECIALIST POINT OF CONTACT DESIGNATION CHANGE. THE CONTRACT SPECIALIST ASSIGNED TO THIS SOLICITATION IS CHANGED FROM SUNTOK MCGUINNESS TO LISA IP (Lisa.I.Ip@usace.army.mil) WHERE FUTURE INQUIRIES OR CORRESPONDENCES CAN BE TRANSMITTED. MARY FRONK AS CONTRACTING OFFICER REMAIN UNCHANGED. --------- Amendment 0002 - A) INCORPORATE THE GOVERNMENT'S RESPONSE TO TWO SETS OF RFIS (REQUEST FOR INFORMATION) THAT WERE RECEIVED B) CORRECT THE TITLE OF THE DREDGING PLAN AND EQUIPMENT SCHEDULE FROM \"RICHMOND INNER HARBOR DREDGING PROJECT\" TO READ \"SAN JOAQUIN/PORT OF STOCKTON DWSC FY 25 MAINTENANCE DREDGING PROJECT\" C) DELETE FAR 52.246-21 WARRANTY OF CONSTRUCTION ---------------------------------------------------------------------------------------------------------------------------------------------------------------------- Amendment 0001 - Updated Pricing (Bid) Schedule ___________________________________________________________________________________________________ The work includes annual maintenance dredging of the San Joaquin/Port of Stockton River DWSC to -35-ft (MLLW) plus 1-ft of paid over-depth, except the Sediment Trap, which shall be dredged to -38.5-ft (MLLW) plus 1-ft of paid over depth. All dredge material is suitable for the upland sites shown on plan sheets. Dredge material may be suitable for beneficial reuses at Contractor furnished sites in accordance with the permit requirements of the specific reuse sites and per the requirements in specification Section 01 11 00 SUMMARY OF WORK.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912P725BA003","place_of_performance":{"zip":"95203","city":{"name":"Stockton"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Z1KF"},{"dates":{"posted":"2025-05-14","response_deadline":{"raw":"2025-05-19T13:00:00-07:00","utc":"2025-05-19T20:00:00Z","date":"2025-05-19","time":"13:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/16795cd8ff2141e793fd30b3eba83dae/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"San Joaquin/Port of Stockton DWSC FY25 Maintenance Dredging Project","agency":{"office":{"code":"W912P7","name":"W075 ENDIST SAN FRAN"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"94102-3406","city":"SAN FRANCISCO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-06-03","archive_type":"auto15"},"contacts":[{"name":"Lisa Ip","role":"primary","email":"lisa.i.ip@usace.army.mil","phone":"4155036877"},{"name":"Mary C. Fronck","role":"secondary","email":"mary.fronck@usace.army.mil","phone":"4155036554"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"16795cd8ff2141e793fd30b3eba83dae","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"bc21fda13547df7a3b6ca6b69c7e4b99052868c34bb6e6d994e8235100d8cb71","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"AMENDMENT 0003- THE PURPOSE OF THIS AMENDMENT IS TO: A) INCORPORATE THE GOVERNMENT'S RESPONSE TO ADDITIONAL RFIS (REQUEST FOR INFORMATION) THAT WERE RECEIVED AFTER AMENDMENT 0002 WAS ISSUED; B) INCORPORATE SECTION 00 73 00 - SPECIAL CONTRACT REQUIREMENTS. FOR EMPHASIS, PLEASE NOTE PARAGRAPH 1.7 SPECIAL INSTRUCTIONS FOR SUBMITTING YOUR BID. CHANGE IN CONTRACT SPECIALIST FROM SUNTOK MCGUINNESS TO LISA IP EMAIL: LISA.I.IP@USACE.ARMY.MIL NOTE: BID DUE DATE REMAIN UNCHANGED (19 MAY 2025). ---------------------- **UPDATES ON 1.7 SPECIAL INSTRUCTIONS FOR SUBMITTING YOUR BID: PLEASE SEE ATTACHED. ----------------------------------- **SPECIAL ANNOUNCEMENT: CONTRACT SPECIALIST POINT OF CONTACT DESIGNATION CHANGE. THE CONTRACT SPECIALIST ASSIGNED TO THIS SOLICITATION IS CHANGED FROM SUNTOK MCGUINNESS TO LISA IP (Lisa.I.Ip@usace.army.mil) WHERE FUTURE INQUIRIES OR CORRESPONDENCES CAN BE TRANSMITTED. MARY FRONK AS CONTRACTING OFFICER REMAIN UNCHANGED. --------- Amendment 0002 - A) INCORPORATE THE GOVERNMENT'S RESPONSE TO TWO SETS OF RFIS (REQUEST FOR INFORMATION) THAT WERE RECEIVED B) CORRECT THE TITLE OF THE DREDGING PLAN AND EQUIPMENT SCHEDULE FROM \"RICHMOND INNER HARBOR DREDGING PROJECT\" TO READ \"SAN JOAQUIN/PORT OF STOCKTON DWSC FY 25 MAINTENANCE DREDGING PROJECT\" C) DELETE FAR 52.246-21 WARRANTY OF CONSTRUCTION ---------------------------------------------------------------------------------------------------------------------------------------------------------------------- Amendment 0001 - Updated Pricing (Bid) Schedule ___________________________________________________________________________________________________ The work includes annual maintenance dredging of the San Joaquin/Port of Stockton River DWSC to -35-ft (MLLW) plus 1-ft of paid over-depth, except the Sediment Trap, which shall be dredged to -38.5-ft (MLLW) plus 1-ft of paid over depth. All dredge material is suitable for the upland sites shown on plan sheets. Dredge material may be suitable for beneficial reuses at Contractor furnished sites in accordance with the permit requirements of the specific reuse sites and per the requirements in specification Section 01 11 00 SUMMARY OF WORK.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912P725BA003","place_of_performance":{"zip":"95203","city":{"name":"Stockton"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Z1KF"},{"dates":{"posted":"2025-05-19","response_deadline":{"raw":"2025-05-19T13:00:00-07:00","utc":"2025-05-19T20:00:00Z","date":"2025-05-19","time":"13:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/6279bb3616f1449eabb0782651e5592c/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"San Joaquin/Port of Stockton DWSC FY25 Maintenance Dredging Project","agency":{"office":{"code":"W912P7","name":"W075 ENDIST SAN FRAN"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"94102-3406","city":"SAN FRANCISCO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-06-03","archive_type":"auto15"},"contacts":[{"name":"Lisa Ip","role":"primary","email":"lisa.i.ip@usace.army.mil","phone":"4155036877"},{"name":"Mary C. Fronck","role":"secondary","email":"mary.fronck@usace.army.mil","phone":"4155036554"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"6279bb3616f1449eabb0782651e5592c","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"92d7db268baa30c0eb97da3ebecbda55f750553aa9f1f42022551e65426efb67","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"BID ABSTRACT POSTED 19-MAY-2025 _________________________________________________________________________________ AMENDMENT 0003- THE PURPOSE OF THIS AMENDMENT IS TO: A) INCORPORATE THE GOVERNMENT'S RESPONSE TO ADDITIONAL RFIS (REQUEST FOR INFORMATION) THAT WERE RECEIVED AFTER AMENDMENT 0002 WAS ISSUED; B) INCORPORATE SECTION 00 73 00 - SPECIAL CONTRACT REQUIREMENTS. FOR EMPHASIS, PLEASE NOTE PARAGRAPH 1.7 SPECIAL INSTRUCTIONS FOR SUBMITTING YOUR BID. CHANGE IN CONTRACT SPECIALIST FROM SUNTOK MCGUINNESS TO LISA IP EMAIL: LISA.I.IP@USACE.ARMY.MIL NOTE: BID DUE DATE REMAIN UNCHANGED (19 MAY 2025). ---------------------- **UPDATES ON 1.7 SPECIAL INSTRUCTIONS FOR SUBMITTING YOUR BID: PLEASE SEE ATTACHED. ----------------------------------- **SPECIAL ANNOUNCEMENT: CONTRACT SPECIALIST POINT OF CONTACT DESIGNATION CHANGE. THE CONTRACT SPECIALIST ASSIGNED TO THIS SOLICITATION IS CHANGED FROM SUNTOK MCGUINNESS TO LISA IP (Lisa.I.Ip@usace.army.mil) WHERE FUTURE INQUIRIES OR CORRESPONDENCES CAN BE TRANSMITTED. MARY FRONK AS CONTRACTING OFFICER REMAIN UNCHANGED. --------- Amendment 0002 - A) INCORPORATE THE GOVERNMENT'S RESPONSE TO TWO SETS OF RFIS (REQUEST FOR INFORMATION) THAT WERE RECEIVED B) CORRECT THE TITLE OF THE DREDGING PLAN AND EQUIPMENT SCHEDULE FROM \"RICHMOND INNER HARBOR DREDGING PROJECT\" TO READ \"SAN JOAQUIN/PORT OF STOCKTON DWSC FY 25 MAINTENANCE DREDGING PROJECT\" C) DELETE FAR 52.246-21 WARRANTY OF CONSTRUCTION ---------------------------------------------------------------------------------------------------------------------------------------------------------------------- Amendment 0001 - Updated Pricing (Bid) Schedule ___________________________________________________________________________________________________ The work includes annual maintenance dredging of the San Joaquin/Port of Stockton River DWSC to -35-ft (MLLW) plus 1-ft of paid over-depth, except the Sediment Trap, which shall be dredged to -38.5-ft (MLLW) plus 1-ft of paid over depth. All dredge material is suitable for the upland sites shown on plan sheets. Dredge material may be suitable for beneficial reuses at Contractor furnished sites in accordance with the permit requirements of the specific reuse sites and per the requirements in specification Section 01 11 00 SUMMARY OF WORK.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912P725BA003","place_of_performance":{"zip":"95203","city":{"name":"Stockton"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Z1KF"},{"award":{"date":"2025-06-04","amount":"5924354.60","number":"W912P725CA009","awardee":{"raw":"CURTIN MARITIME CORP Long Beach CA 90802 USA","name":"CURTIN MARITIME CORP Long Beach","location":{"zip":"90802","state":{"code":"CA"},"country":{"code":"USA"}}}},"dates":{"posted":"2025-06-04","award_date":"2025-06-04"},"links":{"sam":"https://sam.gov/workspace/contract/opp/af27b1e31bf3494899feced23b769c2e/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"San Joaquin/Port of Stockton DWSC FY25 Maintenance Dredging Project","agency":{"office":{"code":"W912P7","name":"W075 ENDIST SAN FRAN"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"94102-3406","city":"SAN FRANCISCO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-06-19","archive_type":"auto15"},"contacts":[{"name":"Lisa Ip","role":"primary","email":"lisa.i.ip@usace.army.mil","phone":"4155036877"},{"name":"Mary C. Fronck","role":"secondary","email":"mary.fronck@usace.army.mil","phone":"4155036554"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"af27b1e31bf3494899feced23b769c2e","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"03747f52d2988fa72b3bd74efc0aff16fe94885f61008d938b2a2cb09b1db078","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"W912P725CA009","place_of_performance":{"zip":"95203","city":{"name":"Stockton"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Z1KF"}],"due_at":"2025-05-19T20:00:00Z","due_date":"2025-05-19","closes_at":"2025-05-19T20:00:00Z","awardable":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912P7","office_name":"W075 ENDIST SAN FRAN","state":"CA","county":"06077","county_name":"San Joaquin County","city":"0675000","city_name":"Stockton","country":"USA","winner_key":"CMCFMRN32267","amount":"5924354.60","linked_awards":9,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z","principal_notice_id":"6279bb3616f1449eabb0782651e5592c","description":{"text":"BID ABSTRACT POSTED 19-MAY-2025 _________________________________________________________________________________ AMENDMENT 0003- THE PURPOSE OF THIS AMENDMENT IS TO: A) INCORPORATE THE GOVERNMENT'S RESPONSE TO ADDITIONAL RFIS (REQUEST FOR INFORMATION) THAT WERE RECEIVED AFTER AMENDMENT 0002 WAS ISSUED; B) INCORPORATE SECTION 00 73 00 - SPECIAL CONTRACT REQUIREMENTS. FOR EMPHASIS, PLEASE NOTE PARAGRAPH 1.7 SPECIAL INSTRUCTIONS FOR SUBMITTING YOUR BID. CHANGE IN CONTRACT SPECIALIST FROM SUNTOK MCGUINNESS TO LISA IP EMAIL: LISA.I.IP@USACE.ARMY.MIL NOTE: BID DUE DATE REMAIN UNCHANGED (19 MAY 2025). ---------------------- **UPDATES ON 1.7 SPECIAL INSTRUCTIONS FOR SUBMITTING YOUR BID: PLEASE SEE ATTACHED. ----------------------------------- **SPECIAL ANNOUNCEMENT: CONTRACT SPECIALIST POINT OF CONTACT DESIGNATION CHANGE. THE CONTRACT SPECIALIST ASSIGNED TO THIS SOLICITATION IS CHANGED FROM SUNTOK MCGUINNESS TO LISA IP (Lisa.I.Ip@usace.army.mil) WHERE FUTURE INQUIRIES OR CORRESPONDENCES CAN BE TRANSMITTED. MARY FRONK AS CONTRACTING OFFICER REMAIN UNCHANGED. --------- Amendment 0002 - A) INCORPORATE THE GOVERNMENT'S RESPONSE TO TWO SETS OF RFIS (REQUEST FOR INFORMATION) THAT WERE RECEIVED B) CORRECT THE TITLE OF THE DREDGING PLAN AND EQUIPMENT SCHEDULE FROM \"RICHMOND INNER HARBOR DREDGING PROJECT\" TO READ \"SAN JOAQUIN/PORT OF STOCKTON DWSC FY 25 MAINTENANCE DREDGING PROJECT\" C) DELETE FAR 52.246-21 WARRANTY OF CONSTRUCTION ---------------------------------------------------------------------------------------------------------------------------------------------------------------------- Amendment 0001 - Updated Pricing (Bid) Schedule ___________________________________________________________________________________________________ The work includes annual maintenance dredging of the San Joaquin/Port of Stockton River DWSC to -35-ft (MLLW) plus 1-ft of paid over-depth, except the Sediment Trap, which shall be dredged to -38.5-ft (MLLW) plus 1-ft of paid over depth. All dredge material is suitable for the upland sites shown on plan sheets. Dredge material may be suitable for beneficial reuses at Contractor furnished sites in accordance with the permit requirements of the specific reuse sites and per the requirements in specification Section 01 11 00 SUMMARY OF WORK.","html":null,"origin":"extract"},"contacts":[{"name":"Lisa Ip","role":"primary","email":"lisa.i.ip@usace.army.mil","phone":"4155036877"},{"name":"Mary C. Fronck","role":"secondary","email":"mary.fronck@usace.army.mil","phone":"4155036554"}],"place_of_performance":{"zip":"95203","city":{"name":"Stockton"},"state":{"code":"CA"},"country":{"code":"USA"}},"office_address":{"zip":"94102-3406","city":"SAN FRANCISCO","state":"CA","country":"USA"},"naics_codes":["237990"],"award":null,"attachments":[],"awards":[{"award_key":"CONT_AWD_W912P725CA009_9700_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_W912P725CA009_9700_-NONE-_-NONE-/","piid":"W912P725CA009","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"CMCFMRN32267","recipient_name":"CURTIN MARITIME CORP","recipient_uei":"CMCFMRN32267","recipient_cage":"4ADU6","recipient_city":"LONG BEACH","recipient_state":"CA","sub_name":"Department of the Army","office_name":"W075 ENDIST SAN FRAN","office_key":"o-W912P7","first_action_date":"2025-06-04","last_action_date":"2025-12-22","actions":3,"obligated":"5207650.75","current_total_value":"5207650.75","potential_total_value":"5207650.75","naics":"237990","psc":"Y1KF","extent_competed":"FULL AND OPEN COMPETITION","set_aside":"NO SET ASIDE USED.","offers_received":5,"description":"SAN JOAQUIN/PORT OF STOCKTON RIVER DWSC MAINTENANCE DREDGING","method":"piid","confidence":"high","evidence":["award number W912P725CA009 equals the contract number","same awarding office W912P7"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"W912P726S0014","latest_notice_id":"412f9c331ab2410fb5e65844ec68d75c","title":"San Francisco Deep Ocean Disposal Site (SF-DODS) 2027-2029 Benthic Monitoring Cruise and Research Vessel","solicitation_number":"W912P726S0014","notice_type":"r","first_type":"r","first_posted":"2026-08-19","last_posted":"2026-08-19","notices":1,"due_at":"2026-09-18T22:00:00Z","due_date":"2026-09-18","closes_at":"2026-09-18T22:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912P7","office_name":"W075 ENDIST SAN FRAN","naics":"541620","psc":"B510","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"}]}