# Industry Day for DRSAA Environmental Infrastructure Water Improvements

Canonical: https://abierto.us/opportunities/w912p525m0005

- Solicitation number: W912P525M0005
- Notice type: Special notice (first published as sources sought)
- Status: Closed. Deadline was July 1, 2025 at 12:00 PM EDT
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W072 Endist Nashville (W912P5)
- NAICS: 237110 Water and Sewer Line and Related Structures Construction
- Product or service code: Y1PD Construction Of Waste Treatment And Storage Facilities
- Set-aside: Total small business set-aside
- Place of performance: Weaverville, North Carolina
- County: Buncombe County (FIPS 37021). https://abierto.us/counties/buncombe-county-nc-37021
- City: Weaverville. https://abierto.us/cities/weaverville-nc-3771560
- First posted: June 18, 2025
- Last posted: July 7, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/4b5b24450a2a4bbeb3cd02de90fbb02c/view

## Description

DRSAA Environmental Infrastructure Water Improvements Industry Day The U.S. Army Corps of Engineers Nashville District (CELRN) is hosting an Industry Engagement Day, on Wenesday, July 30, 2025 from 9:00 AM to 12:00 PM ET at the Weaverville Town Hall, Weaverville, NC 28787. Attendees will meet in the Community Room no later than 9 AM. A presentation will be provided which will include general timeline of future solicitations, how to contract with the U.S. Army Corps of Engineers and a general overview of the projects. An opportunity for a gudied site visit will also be provided.

**Place of Performance/Industry Day Location:** Weaverville Town Hall, 30 South Main Street, Weaverville, NC 28787 See Registration Form attached to include in your response.

During Industry Day we will discuss the following upcoming contracting opportunities: NAME SCOPE Construction Magnitude Weaverville, NC Waterline replacement and new waterline $5M - $10M Robbinsville, NA New waterline and waterline replacement $1M - $5M Smith County Waterline replacement $1M - $5M Canton, NC TBD - Water, wastewater and stormwater $10 - $25M Responses shall include the following information and shall not exceed a total of ten (10) pages: 1. Please provide business information in the following format: a. Business Name b. Points of Contact (Names/Phone Numbers/Email Addresses) c. Address d. Business Size and Category (Large/Small/8(A)/etc.) in relation to the NAICS code e. CAGE and/or UEI Code f. Indication of the intent to be a prime contractor or subcontractor 2. Past Performance Information that documents the respondents experience performing projects similar to required work comparable for this MATOC.

The referenced projects should be of similar scope and magnitude and should have been completed within the last ten years.

Information should be provided in the form of Contract Performance Assessment Reporting System (CPARS), Past Performance Questionnaires (PPQs) or by providing the following information: Project title, location, general description of the construction to demonstrate similarity to the project listed above, the Offeror's role (i.e., prime contractor, subcontractor, etc.), dollar value of contract, duration, name of the company, agency or government entity for which the work was performed with contact information (reference name, phone number and e-mail address), identify/discuss the acquisition method (e.g sealed bid, best value), contract type (e.g. Firm Fixed Price), and delivery method (e.g. Design-Bid-Build, Design-Build, etc).

In the discussion of acquisition method, identify the advantages/disadvantages (from the contractor’s and the owner’s perspective) of the contract type/acquisition approach used for the representative project. 3. Address the firm’s plan to include small business participation to the maximum extent practicable. 4. Does the firm have concerns regarding waterline, sewer line, or stormwater replacements or extensions being completed as Design Build instead of Design Bid Build? If so, please explain.

5. Does the firm have concerns regarding other environmental infrastructure projects to include water tank, wastewater storage tanks, water plant upgrades, or wastewater plant upgrades being completed as Design Build instead of Design Bid Build? If so, please explain. 6. What is the firm’s interest in this Environmental Infrastructure Design Build MATOC? Does the firms interest change if it was Design Bid Build?

7. How would the firm plan to handle design of these Environmental Infrastructure projects (in house, sub-contractor AE, etc)? 8. Does the firm have interest in the North Carolina and Tennessee (Smith County) projects?

## Publications

- June 18, 2025: Sources sought, due July 1, 2025 at 12:00 PM EDT. Notice 4d6b3a584405490c9f5be67e429a32ef. https://sam.gov/workspace/contract/opp/4d6b3a584405490c9f5be67e429a32ef/view
- July 7, 2025: Special notice, due July 22, 2025 at 3:00 PM EDT. Notice 4b5b24450a2a4bbeb3cd02de90fbb02c. https://sam.gov/workspace/contract/opp/4b5b24450a2a4bbeb3cd02de90fbb02c/view

## Points of contact

- Diana Namara, diana.l.namara@usace.army.mil, 6157365603
- Dellaria Martin, dellaria.l.martin@usace.army.mil, 6157367986

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/w912p525m0005.
