# Lower Snake River Navigation Lock Tainter Valve System Upgrades

Canonical: https://abierto.us/opportunities/w912ef24r0010

- Solicitation number: W912EF24R0010
- Notice type: Award notice (first published as presolicitation)
- Status: Awarded to Knight Const. & Supply, Inc. for $56,839,500.00
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: US Army Engineer District Walla Wal (W912EF)
- NAICS: 237990 Other Heavy and Civil Engineering Construction
- Product or service code: Z2KA Repair Or Alteration Of Dams
- Place of performance: Walla Walla, Washington
- County: Walla Walla County (FIPS 53071). https://abierto.us/counties/walla-walla-county-wa-53071
- City: Walla Walla. https://abierto.us/cities/walla-walla-wa-5375775
- First posted: July 17, 2024
- Last posted: October 1, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/9bca004ae36d42bd979bf1c9e752b3f7/view

## Description

The US Army corps of Engineers, Walla Walla District is planning to award a Hybrid Construction with Supply project entitled Lower Snake River Navigation Lock Tainter Valve System Upgrades. The work is located at the Ice Harbor Project (HLD) in Burbank Washington; Lower Monumental Project (LMA) in Kahlotus, Washington; Little Goose Project (LGA) in Starbuck, Washington; and Lower Granite Project (LLA) in Pomeroy, Washington.

The North American Industry Classification System (NAICS) code for this project is 237990-Other Heavy and Civil Engineering Construction with $45,00,000 in annual receipts. The scope of work includes replacing four culvert valve bodies with new valves (four at each site, sixteen total) at HLD, LMA, LGA and LLA. This will be a firm-fixed-price hybrid construction with supply contract. The construction portion has an estimated magnitude of the construction between $10,000,000 and $25,000,000.

Performance and payment bonds will be required for the construction portion of the contract only. The tainter valves are located in the navigation lock at the referenced projects, inside the fill/drain culverts, at varying depths below the spillway deck. The main access is down the valve shaft via crane and basket. The tainter valves have an approximate size of 15 feet tall, 12 feet wide, and 19.5 foot in radius. The weight of each tainter valve is approximately 54,000 lbs.

This project also includes the replacement of the associated mechanical equipment, including linkages, hydraulic cylinders, and hydraulic power units. The trunnion yokes, pins, bushing, and keeper plates shall also be replaced. The electrical systems will also be updated, which includes power and control for each of the valves. The work described herein involves the repair of four tainter valves and associated operating assemblies at each of the above referenced locks and dams.

The contractor or their subcontractor who will be responsible for fabrication shall be certified under American Institute Steel Construction (AISC) quality certification program with one of the following certifications: Major Bridge Fabricator (CBR), Certified Bridge Fabricator – Advanced (ABR), Certified Bridge Fabricator – Intermediate (IBR), or Certified Hydraulic Fabricator (HYD). In addition to the above required certifications, the fabricator shall be certified with the Fracture Critical Endorsement (F).

There are three major actions included in this contract scope of work: 1. Fabrication of the replacement parts 2. Removal of the existing equipment 3. Installation of the replacement equipment Only one pair of the tainter valves will be replaced at a time at each project, such that the other pair of valves on the project will remain fully operational to allow normal navigation movement through the lock.

HLD-LMA-LGA-LLA Tainter Valves Combined Requirements Summary Scope of Work: Replace tainter valve trunnions for each replaced valve, including the bases, pins, bushings, anchor bolts and epoxy backing Rehabilitate the stainless-steel sealing surfaces in the culverts by performing weld repair and machining. Replace the lifting eyes for each tainter valve. Replace the entire linage assembly that connects each valve with its hydraulic operating cylinder.

This includes the connecting rod and pin assemblies, crosshead assemblies, push rods and push rod guides. Replace both hydraulic operating cylinders. Replace the hydraulic power unit (HPU) for each tainter valve. This includes the motor, pump, tank and associated piping connections to the operating cylinder and electrical controls.

Replace electrical components including the motor cables, thermal overloads, motor starter and circuit breaker, transformer, auxiliary relay, pressure and temperature switch, and time delay relays. Provide commissioning services to test the entire tainter valve system to verify satisfactory installation and operation.

All on-site work shall be performed in accordance with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1) The contractor will be responsible for establishing and managing an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance.

In addition, the contractor will be required to develop and submit for Government acceptance, and Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that complies with EM 385-1-1. A site Safety and Health Officer (SSHO) employed by the prime contractor shall be required for each shift of the contractor’385-1-1s on-site operations.

The SSHO shall possess a minimum of 5-years experience in construction safety on similar projects, shall have completed the 30-hour OSHA Construction Safety training within the last 5-years, and shall have completed at least 24-hours of formal safety training each year for the past 5-years. A qualified Fall Protection Competent Person shall be provided by the contractor for each shift of the contractor’s on-site operations that involves work that exposes workers to fall hazards.

This contract will require the contractor to furnish mobile crane equipment, crane operators, and rigging equipment that comply with the certification and testing requirements of EM 385-1-1. The contractor will be responsible for establishing and managing an effective Contractor Quality Control (CQC) System A CQC System Manager employed by the prime contractor shall be required to be on-site for each shift of the Contractor’s operations.

The CQC System Manager must possess a minimum of 5-years relevant experience in a supervisory or management position such as Quality Control Manager, Quality Assurance Manager, or Construction Manager directly involved in the management of construction quality at the project site. In addition, the CQC System Manager shall have completed the course entitled “Construction Quality Management for Contractors” within the last 5-years.

The Contractor will be required to use the Government-furnished Construction Contractor Module (referred to as QCS) of the Resident Management System (RMS) to record, maintain, and submit various information throughout the contract period. QCS is a Windows-based program that can be run on a stand-alone personal computer or on a network. The Government will make the QCS software available to the Contractor after contract award.

The project will involve the development and management of Contractor furnished submittals for items such as pre-construction plans, product data, test reports, and contract close-out documentation as required by the technical specifications of the contract. Miscellaneous work within the project includes the delivery of Record Drawings to the customer.

ATTACHED IS AMENDMENT 0001 ATTACHED IS AMENDMENT 0002 ATTACHED IS AMENDMENT 0003 ATTACHED IS AMENDMENT 0004 ATTACHED IS AMENDMENT 0005 ATTACHED IS AMENDMENT 0006 ATTACHED IS AMENDMENT 0007

## Award on USAspending

- Recipient: Knight Const. & Supply, Inc. (UEI S6HKH3KV35N3)
- Contract: W912EF24C0012, definitive contract
- Obligated: $64,595,701.00, current value $64,622,881
- Competition: Full and Open Competition, 3 offers received
- Link: solicitation number W912EF24R0010 equals the FPDS solicitation identifier; same awarding office W912EF (high confidence)
- Record: https://www.usaspending.gov/award/CONT_AWD_W912EF24C0012_9700_-NONE-_-NONE-/


## Publications

- July 17, 2024: Presolicitation, due August 30, 2024 at 3:00 PM EDT. Notice f40970bd2a54402a87e98e6048cecafc. https://sam.gov/workspace/contract/opp/f40970bd2a54402a87e98e6048cecafc/view
- July 18, 2024: Presolicitation, due August 30, 2024 at 3:00 PM EDT. Notice b83ba5b2ae204ee3bc8a6bdc399f35f0. https://sam.gov/workspace/contract/opp/b83ba5b2ae204ee3bc8a6bdc399f35f0/view
- July 31, 2024: Solicitation, due August 30, 2024 at 2:30 PM EDT. Notice 4f04749e9fd747b78f5a21ac1f5592e5. https://sam.gov/workspace/contract/opp/4f04749e9fd747b78f5a21ac1f5592e5/view
- August 8, 2024: Solicitation, due August 30, 2024 at 2:30 PM EDT. Notice 07fc6369a2854862ac4f5431ab6a7a28. https://sam.gov/workspace/contract/opp/07fc6369a2854862ac4f5431ab6a7a28/view
- August 9, 2024: Solicitation, due August 30, 2024 at 2:30 PM EDT. Notice 7a83a24a19b74a47ac8d0f371ccac60a. https://sam.gov/workspace/contract/opp/7a83a24a19b74a47ac8d0f371ccac60a/view
- August 19, 2024: Solicitation, due September 6, 2024 at 2:30 PM EDT. Notice 1b03ebb2f9174d10bb038100d5ec468b. https://sam.gov/workspace/contract/opp/1b03ebb2f9174d10bb038100d5ec468b/view
- August 21, 2024: Solicitation, due September 6, 2024 at 2:30 PM EDT. Notice 83bcaeafd27e4529a63d6ff53162aedd. https://sam.gov/workspace/contract/opp/83bcaeafd27e4529a63d6ff53162aedd/view
- August 28, 2024: Solicitation, due September 6, 2024 at 2:30 PM EDT. Notice 06744ac7a9f843c4987788157b63cf1c. https://sam.gov/workspace/contract/opp/06744ac7a9f843c4987788157b63cf1c/view
- August 29, 2024: Solicitation, due September 6, 2024 at 2:30 PM EDT. Notice 3cad938d2155457a9c879c2b6750ddf5. https://sam.gov/workspace/contract/opp/3cad938d2155457a9c879c2b6750ddf5/view
- September 3, 2024: Solicitation, due September 6, 2024 at 2:30 PM EDT. Notice ac8f55d6e9374bea96975219f5fc0156. https://sam.gov/workspace/contract/opp/ac8f55d6e9374bea96975219f5fc0156/view
- September 4, 2024: Solicitation, due September 6, 2024 at 2:30 PM EDT. Notice 6c8c034f9eb24b128357da40b8c30c22. https://sam.gov/workspace/contract/opp/6c8c034f9eb24b128357da40b8c30c22/view
- September 5, 2024: Solicitation, due September 6, 2024 at 2:30 PM EDT. Notice ad9be4487853429895d38d987c549a60. https://sam.gov/workspace/contract/opp/ad9be4487853429895d38d987c549a60/view
- October 1, 2024: Solicitation, due September 6, 2024 at 2:30 PM EDT. Notice 2f910a235b5a48818617ba4e347a92e4. https://sam.gov/workspace/contract/opp/2f910a235b5a48818617ba4e347a92e4/view
- October 1, 2024: Solicitation, due September 6, 2024 at 2:30 PM EDT. Notice 4d9e462a66174268b67e4819430d040f. https://sam.gov/workspace/contract/opp/4d9e462a66174268b67e4819430d040f/view
- October 1, 2024: Award notice. Notice 9bca004ae36d42bd979bf1c9e752b3f7. https://sam.gov/workspace/contract/opp/9bca004ae36d42bd979bf1c9e752b3f7/view

## Points of contact

- Cynthia Jacobsen, cynthia.h.jacobsen@usace.army.mil, 5095277214
- David Boone, david.c.boone@usace.army.mil, 5095277227

---
Source: SAM.gov Contract Opportunities bulk extract and USAspending.gov award data. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/w912ef24r0010.