# PRE-DEMOLITION SURVEY VARIOUS BUILDINGS Marine Corps Air Station in Yuma, Arizona

Canonical: https://abierto.us/opportunities/w912dy26ra107

- Solicitation number: W912DY26RA107
- Notice type: Solicitation
- Status: Closed. Deadline was July 27, 2026 at 10:00 AM EDT
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W2V6 USA Eng SPT CTR Huntsvil (W912DY)
- NAICS: 238910 Site Preparation Contractors
- Product or service code: P400 Demolition of Buildings
- Set-aside: Women-owned small business set-aside
- Place of performance: Yuma, Arizona
- County: Yuma County (FIPS 04027). https://abierto.us/counties/yuma-county-az-04027
- City: Yuma. https://abierto.us/cities/yuma-az-0485540
- First posted: July 9, 2026
- Last posted: July 15, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/d163bbe08eee4f0cac774eb131a9a25e/view

## Description

The purpose of this amendment is to extend the proposal submission deadline from 15 July 2026 to 27 July 2026.PRE-DEMOLITION SURVEY VARIOUS BUILDINGS Marine Corps Air Station in Yuma, Arizona. The objective of this Performance Work Statement (PWS) is to plan and complete the environmental sampling of excess facilities at the specified installation.

The structures of concern are listed in Table I. The sampling will identify and determine the extent of Asbestos-Containing Materials (ACM) and Other Regulated Materials (ORM). Additionally, the Contractor shall complete a Waste Stream Analysis for RCRA 8 metals, Lead-Based Paint (LBP), and PCBs-in-paint for those parts of the structure currently identified as potentially having painted components.

Following sampling, the Contractor shall be able to characterize and quantify the environmental contamination present to the extent necessary for demolition planning and waste disposal profiling. The Contractor shall identify the methods required to abate, remove, and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with applicable Federal, State, and local regulations.

All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. The results of the site investigation and sampling effort will be provided in a comprehensive Pre- Demolition Assessment Report encompassing all assessed facilities. The Contractor?s proposed schedule, submitted with their proposal, shall establish the timeline for laboratory testing, analysis, and the final report submittal.

The intent of this contract?s effort is to provide comprehensive sampling for all ACM/ORM materials, including the facility exterior, roof, basements, and crawl spaces. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within the structures that were not accessible during the survey, detailing the size of the area not accessed and the current or immediate previous use of the area not sampled.

## Publications

- July 9, 2026: Solicitation, due July 22, 2026 at 10:00 AM EDT. Notice cefea61876024538a833dd3282268ed9. https://sam.gov/workspace/contract/opp/cefea61876024538a833dd3282268ed9/view
- July 13, 2026: Solicitation, due July 22, 2026 at 10:00 AM EDT. Notice e4a5de77160b4460b7f9514d36f28946. https://sam.gov/workspace/contract/opp/e4a5de77160b4460b7f9514d36f28946/view
- July 15, 2026: Solicitation, due July 27, 2026 at 10:00 AM EDT. Notice d163bbe08eee4f0cac774eb131a9a25e. https://sam.gov/workspace/contract/opp/d163bbe08eee4f0cac774eb131a9a25e/view

## Points of contact

- TYRONE M. BROWN, tyrone.m.brown@usace.army.mil, 25698951918
- Christy N. Tallant, Christy.N.Tallant@usace.army.mil, 256-895-5238

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/w912dy26ra107.