# FY26 NASA AMES RESEARCH CENTER SURVEY

Canonical: https://abierto.us/opportunities/w912dy26ra061

- Solicitation number: W912DY26RA061
- Notice type: Award notice (first published as combined synopsis and solicitation)
- Status: Awarded to Gse Inc. 3795 Gordon Terry Pkwy Trinity 35673 USA for $585,658.13
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W2V6 USA Eng SPT CTR Huntsvil (W912DY)
- NAICS: 541330 Engineering Services
- Product or service code: P400 Demolition of Buildings
- First posted: May 19, 2026
- Last posted: July 24, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/4dbc47b0c8754eeb87f0daa38d5e4c7c/view

## Description

NASA has tasked the US Army Corps of Engineers, Engineering andSupport Center, Huntsville, to initiate a Facility Reduction requirement at the AMES research center inSan Francisco, CA. Buildings are considered excess and will be demolished.

The purpose of thiscontract is to procure Pre-demolition surveys according to the requirements set forth in thisPerformance Work Statement (PWS).The objective is to plan and complete the environmental sampling facilities as identified in the PWS.The objective of the Performance Work Statement is to plan and complete the environmentalsampling of facilities at the installation. The structures of concern are listed in Table I of the PWS.

Thesampling will determine ACM and ORM materials and complete a Waste Stream Analysis for RCRA 8metals, lead-based paint (LBP) and PCB?s-in-paint for those parts of the structure currently identifiedas potentially having any painted components. Following sampling, the Contractor shall be able tocompletely quantify the environmental contamination present and the methods required to removeand dispose of contamination in a safe manner.

All sampling shall be planned and performed inaccordance with Federal, State, and local regulations for the installation. All recommendations forfollow-on actions shall also be in accordance with Federal, State, and local regulations. Laboratorytesting and analysis shall be completed within the workdays identified in table two following therespective site sampling field activity completion.

The results of the site investigation and samplingeffort will be provided in an individual Pre-Demolition Assessment Report for the installationRefer to the PWS and attached documents for requirement specifics.*Projnet Questions due by 25 May 2026.**Note the solcitation is in CST - Central Standard Time*

## Publications

- May 19, 2026: Combined synopsis and solicitation, due June 1, 2026 at 2:00 PM EDT. Notice 527147bd730b411fb1ce1e70a7f53683. https://sam.gov/workspace/contract/opp/527147bd730b411fb1ce1e70a7f53683/view
- July 24, 2026: Award notice. Notice 4dbc47b0c8754eeb87f0daa38d5e4c7c. https://sam.gov/workspace/contract/opp/4dbc47b0c8754eeb87f0daa38d5e4c7c/view

## Points of contact

- Benjamin Hoell, benjamin.g.hoell@usace.army.mil, 9783188084

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/w912dy26ra061.