{"canonical":"https://abierto.us/opportunities/w912dw25r15f0","key":"W912DW25R15F0","url":"https://abierto.us/opportunities/w912dw25r15f0","title":"Repair Fire Suppression System, Hangars 3 and 4 on McChord Field, Joint Base Lewis-McChord (JBLM), WA.","solicitation_number":"W912DW25R15F0","notice_type":"a","open":false,"response_deadline":"2025-08-11T19:00:00Z","first_posted":"2025-04-04","last_posted":"2025-09-26","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"W071 ENDIST SEATTLE","naics":"236220","psc":"Y1BZ","set_aside":"SBA","place_state":"WA","place_county":"53053","place_county_name":"Pierce County","place_city":"5341155","place_city_name":"McChord AFB","winner":"VET INDUSTRIAL INC","award_amount":"18057264.13","publications":[{"notice_id":"897bdf4dcfc246cbb23bc9e3f93fbe81","title":"Repair Fire Suppression Systems, Hangars 3 and 4 on McChord Field, Joint Base Lewis-McChord (JBLM), WA.","solicitation_number":"W912DW25R15F0","notice_type":"r","base_type":"r","posted":"2025-04-04","posted_at":null,"due_at":"2025-04-25T21:00:00Z","due_date":"2025-04-25","cancelled":null,"archived":null,"archive_date":"2025-05-10","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/897bdf4dcfc246cbb23bc9e3f93fbe81/view","enriched":false,"history":[]},{"notice_id":"b764215893844c05925d442bcfdeff0c","title":"Repair Fire Suppression Systems, Hangars 3 and 4 on McChord Field, Joint Base Lewis-McChord (JBLM), WA.","solicitation_number":"W912DW25R15F0","notice_type":"p","base_type":"r","posted":"2025-06-04","posted_at":null,"due_at":"2025-07-21T21:00:00Z","due_date":"2025-07-21","cancelled":null,"archived":null,"archive_date":"2025-08-05","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/b764215893844c05925d442bcfdeff0c/view","enriched":false,"history":[]},{"notice_id":"7b925676a4a44aa3978b8445777a9061","title":"Repair Fire Suppression System, Hangars 3 and 4 on McChord Field, Joint Base Lewis-McChord (JBLM), WA.","solicitation_number":"W912DW25R15F0","notice_type":"o","base_type":"o","posted":"2025-07-08","posted_at":null,"due_at":"2025-08-08T21:00:00Z","due_date":"2025-08-08","cancelled":null,"archived":null,"archive_date":"2025-10-31","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/7b925676a4a44aa3978b8445777a9061/view","enriched":false,"history":[]},{"notice_id":"2e68f42ea5b2477ebd8c392c35fe90d4","title":"Repair Fire Suppression System, Hangars 3 and 4 on McChord Field, Joint Base Lewis-McChord (JBLM), WA.","solicitation_number":"W912DW25R15F0","notice_type":"o","base_type":"o","posted":"2025-07-30","posted_at":null,"due_at":"2025-08-11T19:00:00Z","due_date":"2025-08-11","cancelled":null,"archived":null,"archive_date":"2025-10-31","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/2e68f42ea5b2477ebd8c392c35fe90d4/view","enriched":false,"history":[]},{"notice_id":"8b7bc8ba872640928a5289f25342bcb0","title":"Repair Fire Suppression System, Hangars 3 and 4 on McChord Field, Joint Base Lewis-McChord (JBLM), WA.","solicitation_number":"W912DW25R15F0","notice_type":"o","base_type":"o","posted":"2025-08-04","posted_at":null,"due_at":"2025-08-11T19:00:00Z","due_date":"2025-08-11","cancelled":null,"archived":null,"archive_date":"2025-10-31","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/8b7bc8ba872640928a5289f25342bcb0/view","enriched":false,"history":[]},{"notice_id":"2aed413bc2544197af23ec8c581e099d","title":"Repair Fire Suppression System, Hangars 3 and 4 on McChord Field, Joint Base Lewis-McChord (JBLM), WA.","solicitation_number":"W912DW25R15F0","notice_type":"o","base_type":"o","posted":"2025-08-07","posted_at":null,"due_at":"2025-08-11T19:00:00Z","due_date":"2025-08-11","cancelled":null,"archived":null,"archive_date":"2025-10-31","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/2aed413bc2544197af23ec8c581e099d/view","enriched":false,"history":[]},{"notice_id":"470e5142ce8b49cfa2de6aa50e1f79bd","title":"Repair Fire Suppression System, Hangars 3 and 4 on McChord Field, Joint Base Lewis-McChord (JBLM), WA.","solicitation_number":"W912DW25C0033","notice_type":"a","base_type":"o","posted":"2025-09-26","posted_at":null,"due_at":null,"due_date":null,"cancelled":null,"archived":null,"archive_date":"2025-10-11","award_number":"W912DW25C0033","awardee_name":"VET INDUSTRIAL INC Bremerton","amount":"18057264.13","link_sam":"https://sam.gov/workspace/contract/opp/470e5142ce8b49cfa2de6aa50e1f79bd/view","enriched":false,"history":[]}],"latest_notice_id":"470e5142ce8b49cfa2de6aa50e1f79bd","first_type":"r","notices":[{"dates":{"posted":"2025-04-04","response_deadline":{"raw":"2025-04-25T14:00:00-07:00","utc":"2025-04-25T21:00:00Z","date":"2025-04-25","time":"14:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/897bdf4dcfc246cbb23bc9e3f93fbe81/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Repair Fire Suppression Systems, Hangars 3 and 4 on McChord Field, Joint Base Lewis-McChord (JBLM), WA.","agency":{"office":{"code":"W912DW","name":"W071 ENDIST SEATTLE"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"98134-2329","city":"SEATTLE","state":"WA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-05-10","archive_type":"auto15"},"contacts":[{"name":"Christopher Baroldy","role":"primary","email":"christopher.l.baroldy@usace.army.mil","phone":"253.966.3220"},{"name":"Shannan Jones","role":"secondary","email":"shannan.m.jones@usace.army.mil"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"897bdf4dcfc246cbb23bc9e3f93fbe81","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"8796cfb0b85b6496449cd33c46bcba88327bad06efe46659a4f58508b4cfd1af","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"This is a Sources Sought Notice for market research purposes ONLY. This is NOT a Request for Proposals, Request for Quotes or Invitation for Bids. A solicitation, specifications or drawings are not available at this time. After review of the responses to this notice, and if the Government intends to proceed with the acquisition, a separate presolicitation notice will be published on the System for Award Management (SAM) website, https://sam.gov. Responses to this Sources Sought Notice are not adequate responses to any future solicitation announcement. All interested parties and potential bidders/offerors are responsible to monitor SAM for any future postings. The purpose of this Sources Sought Notice is for the U.S. Army Corps of Engineers (USACE) to gain knowledge and determine the availability of interested business sources for a proposed firm fixed-price construction project to repair the fire suppression systems at Hangars 3 and 4 on McChord Field at Joint Base Lewis-McChord (JBLM), WA. In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204, the magnitude of construction for this anticipated project is estimated to be between $10,000,000.00 and $25,000,000.00. Payment and performance bonds for the value of the contract will be required. The North American Industry Classification System (NAICS) code for this project is 236220, Commercial and Institutional Building Construction, with an associated small business size standard of $45,000,000.00. This Sources Sought Notice is strictly for informational and market research purposes ONLY, to assist the Government in identifying contractors with the interest and capability to accomplish the type of work that will be required by the anticipated project. Responses received to this Sources Sought Notice will also assist the Government in determining the appropriate acquisition method for the subject requirement, including whether a small business set-aside is possible and/or appropriate, and what type of solicitation will be issued for this requirement. Please note that this Sources Sought Notice does not constitute a solicitation for competitive bids or proposals and is not to be construed as a commitment by the Government. No reimbursement will be made for any costs associated with providing information in response to this notice or any requested follow-up information. Unsolicited proposals will not be accepted. Further, proprietary information is not being requested at this time and respondents shall refrain from providing proprietary information in response to this notice. No award will be made from this Sources Sought Notice. This notice is also not a request to be placed on a solicitation mailing list. However, all interested firms, regardless of business size under NAICS code 236220, should respond to this notice. Responses to this Sources Sought Notice will be shared with the Government project team, but otherwise will be held in strict confidence. SUMMARY DESCRIPTION OF PROPOSED PROJECT: The Seattle District USACE expects to issue a solicitation for a firm-fixed price contract to repair the fire suppression systems in Hangars 3 and 4 at McChord Field on Joint Base Lewis-McChord (JBLM), WA, which will include the following scope of work requirements: a. Repair Fire Suppression System, Hangars 3 and 4, Building J00003. Background: Building J00003 includes Hangar #3 and Hangar #4. Hangar #3 consists of approximately 16,742 square feet of first floor support spaces, 973 square feet of second floor support spaces, 73,459 square feet of Hangar Area that also includes 4,531 square feet of mechanical spaces above the center support areas yielding a total square footage of 95,705 square feet. Hangar #4 consists of approximately 16,376 square feet of first floor support spaces, 12,030 square feet of second floor support spaces, 75,010 square feet of Hangar Area that also includes 6,128 square feet of mechanical spaces above the center support areas yielding a total square footage of 109,544 square feet. Scope: Project will repair the failing fire suppression system in Hangars 3 and 4 (Building J00003). Work will include demolishing and repair by replacement of the high expansion foam system with an automatic sprinkler system, the wet-pipe automatic sprinkler system throughout the administrative support areas, and the fire alarm system with a fully addressable system that incorporates the fire alarm system control panel, remote power supply, initiation devices, and notification appliances. Work will also include repairing components of the ventilation and electrical systems and remediating asbestos contaminated material based on the assumption that there is underground asbestos-cement piping. Repair of the fire alarm system circuits and cabling shall be in accordance with the Unified Facilities Criteria (UFC). The fire suppression system will comply with UFC 4-211-01 Aircraft Maintenance Hangars, Chapter 5 (Air Force Specific Criteria), and Headquarters Air Force/A4 Memorandum Aircraft Hangar Fire Suppression System Modernization (3 June 2021). b. Repair Fire Pump House and Pumps, Building J00024. Background: The Fire Pump House (Building J00024) is 2,240 square feet and was built in 1968. The building is constructed of concrete and CMU with a 14-foot-high wall measured at the parapet. The building is built on a concrete slab that has multiple housekeeping pads, cut outs and anchors. Scope: The two (2) existing Fairbanks Morse diesel driven fire pumps at the East end of the Fire Pump House and the single Fairbanks Morse diesel driven foam fire pump at the east end of the Fire Pump House and their related equipment and piping, the existing foam storage tank, and concrete pads will be demolished and removed from the site. The remaining three (3) diesel fire pumps at the west end of the pump house will remain and continue to serve Hangar #1 and Hangar #2. The single exterior man door located in the South wall shall be replaced with a double wide exterior man door to allow work at the East end of the Fire pump house to occur. New fire pump work will include the installation of two (2) electrically driven fire pumps. Each of the two (2) electrically driven fire pumps shall be horizontal split case fire pumps that have an output rating of approximately 75 p.s.i. at 750 g.p.m. with a churn pressure of 88 p.s.i., a 150% rated capacity of 65 p.s.i., and a horsepower rating of approximately 65. The sprinkler, alarm and other support systems will also be replaced during the building repair. c. Repair Waterlines between Buildings J00003 and J00024. Scope: All existing 24-in. diameter underground mains serving Hangars 3 and 4 shall be demolished and removed from site. A new 8-in. Class 52 Ductile Iron Piping (DIP) will be installed from the Pump House (Building J00024) to serve Hangar #3 and Hangar #4. Each dedicated lead-in shall be brought into a new open trench with a metal grate wed walking surface allowing the piping to be visually seen and not be placed under the slab of either building. Replacement of the lines will require patching of the existing parking areas. d. Relocate Office Equipment to Support Repair Efforts. SCOPE: Existing Hangars 3 and 4 (Building J00003) are occupied. Prior to starting repair work, the contractor will need to relocate a significant amount of office furniture, equipment and specialty tools between hangars. Some furniture disassembly/reassembly will be required. The process will be reversed, moving staff equipment back into the hangars at the end of the project. SUBMITTAL REQUIREMENTS: Interested firms should submit a capabilities package limited to five (5) pages (exclude any Joint Venture and Bonding information from page count) that includes the following: 1. Firm’s name, address (mailing and URL), point of contact, phone number and email address. 2. CAGE code and UEI of your firm. 3. Your firm’s primary North American Industry Classification System (NAICS) code(s). 4. Business classification, i.e., state whether your firm is classified by the Small Business Administration as any of the following or is Other Than Small Business: ? Small Business (SB) ? Small Disadvantage Business (SDB) ? Woman-Owned SB (WOSB) ? Veteran-Owned SB (VOSB) ? Service-Disabled VOSB (SDVOSB) ? Historically Underutilized Business Zone (HUBZone) ? 8(a) Program ? Other Than Small Business (Large Business) 5. Regions in which your company normally performs work or would perform work: ? West ? Midwest ? Northeast ? Southwest ? Southeast ? OCONUS (Outside the Continental United States) ? All of the Above 6. Firm’s Joint Venture Information, if applicable. 7. Bonding Information. Provide the following, on your Bonding Company’s letterhead: (a) Bonding Limit – Single Bond (b) Bonding Limit – Aggregate 8. A brief capabilities narrative describing your firm’s ability to meet anticipated contract requirements as described above. 9. A narrative describing a minimum of two (2) projects your firm has completed that were similar in size, scope and complexity to the anticipated contract requirements described above. Of particular interest to the Government are projects where your firm completed replacement of fire suppression system(s) in a large facility, hangar or warehouse. If a single project(s) does not cover all scope of work areas described above for the subject project, the narrative may include additional projects noting experience on individual systems or groups of tasks. Submission of your interest is not a prerequisite to any potential future posting, but participation will assist the Government in identifying sources with required capabilities and in determining the appropriate acquisition strategy for this requirement. Interested contractors must be registered in the SAM database, https://sam.gov, to be eligible for award of any Government contract. PLEASE SUBMIT RESPONSES TO: Responses to the Sources Sought Notice should be received as soon as possible but no later than 2:00 pm (Pacific Time) on 25 April 2025. Phone calls will not be accepted. Submit responses to the attention of Contract Specialist, Christopher Baroldy, at Christopher.L.Baroldy@usace.army.mil. The NWS Small Business Programs Point of Contact is Enshane Hill-Nomoto, Enshane.Nomoto@usace.army.mil or cenws-sb@usace.army.mil.","origin":"extract"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"W912DW25R15F0","place_of_performance":{"zip":"98438","city":{"name":"McChord AFB"},"state":{"code":"WA"},"country":{"code":"USA"}},"product_service_code":"Y1BZ"},{"dates":{"posted":"2025-06-04","response_deadline":{"raw":"2025-07-21T14:00:00-07:00","utc":"2025-07-21T21:00:00Z","date":"2025-07-21","time":"14:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/b764215893844c05925d442bcfdeff0c/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Repair Fire Suppression Systems, Hangars 3 and 4 on McChord Field, Joint Base Lewis-McChord (JBLM), WA.","agency":{"office":{"code":"W912DW","name":"W071 ENDIST SEATTLE"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"98134-2329","city":"SEATTLE","state":"WA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-08-05","archive_type":"auto15"},"contacts":[{"name":"Christopher Baroldy","role":"primary","email":"christopher.l.baroldy@usace.army.mil","phone":"253.966.3220"},{"name":"Shannan Jones","role":"secondary","email":"shannan.m.jones@usace.army.mil"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"b764215893844c05925d442bcfdeff0c","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"24a1654747297b30d45215b04f3bd4aeea92a242a7dc2e7ddc5dcebf70c7ee5d","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"FOR INFORMATION ONLY: This Synopsis is a NOTIFICATION ONLY of an anticipated and forthcoming solicitation. All questions regarding this Synopsis should be submitted in writing via email to the Contract Specialist as noted below. The United States Army Corps of Engineers (USACE), Seattle District, anticipates issuing a solicitation for the award of a firm-fixed-price (FFP) contract to repair the fire suppression system in Hangars 3 & 4 on McChord Field, Joint Base Lewis-McChord, WA. This requirement will include the following scope of work: a. Repair Fire Suppression System, Hangars 3 and 4, Building J00003. Background: Building J00003 includes Hangar #3 and Hangar #4. Hangar #3 consists of approximately 16,742 square feet of first floor support spaces, 973 square feet of second floor support spaces, 73,459 square feet of Hangar Area that also includes 4,531 square feet of mechanical spaces above the center support areas yielding a total square footage of 95,705 square feet. Hangar #4 consists of approximately 16,376 square feet of first floor support spaces, 12,030 square feet of second floor support spaces, 75,010 square feet of Hangar Area that also includes 6,128 square feet of mechanical spaces above the center support areas yielding a total square footage of 109,544 square feet. Scope: Project will repair the failing fire suppression system in Hangars 3 and 4 (Building J00003). Work will include demolishing and repair by replacement of the high expansion foam system with an automatic sprinkler system, the wet-pipe automatic sprinkler system throughout the administrative support areas, and the fire alarm system with a fully addressable system that incorporates the fire alarm system control panel, remote power supply, initiation devices, and notification appliances. Work will also include repairing components of the ventilation and electrical systems and remediating asbestos contaminated material based on the assumption that there is underground asbestos-cement piping. Repair of the fire alarm system circuits and cabling shall be in accordance with the Unified Facilities Criteria (UFC). The fire suppression system will comply with UFC 4-211-01 Aircraft Maintenance Hangars, Chapter 5 (Air Force Specific Criteria), and Headquarters Air Force/A4 Memorandum Aircraft Hangar Fire Suppression System Modernization (3 June 2021). b. Repair Fire Pump House and Pumps, Building J00024. Background: The Fire Pump House (Building J00024) is 2,240 square feet and was built in 1968. The building is constructed of concrete and CMU with a 14-foot-high wall measured at the parapet. The building is built on a concrete slab that has multiple housekeeping pads, cut outs and anchors. Scope: The two (2) existing Fairbanks Morse diesel driven fire pumps at the East end of the Fire Pump House and the single Fairbanks Morse diesel driven foam fire pump at the east end of the Fire Pump House and their related equipment and piping, the existing foam storage tank, and concrete pads will be demolished and removed from the site. The remaining three (3) diesel fire pumps at the west end of the pump house will remain and continue to serve Hangar #1 and Hangar #2. The single exterior man door located in the South wall shall be replaced with a double wide exterior man door to allow work at the East end of the Fire pump house to occur. New fire pump work will include the installation of two (2) electrically driven fire pumps. Each of the two (2) electrically driven fire pumps shall be horizontal split case fire pumps that have an output rating of approximately 75 p.s.i. at 750 g.p.m. with a churn pressure of 88 p.s.i., a 150% rated capacity of 65 p.s.i., and a horsepower rating of approximately 65. The sprinkler, alarm and other support systems will also be replaced during the building repair. c. Repair Waterlines between Buildings J00003 and J00024. Scope: All existing 24-in. diameter underground mains serving Hangars 3 and 4 shall be demolished and removed from site. A new 8-in. Class 52 Ductile Iron Piping (DIP) will be installed from the Pump House (Building J00024) to serve Hangar #3 and Hangar #4. Each dedicated lead-in shall be brought into a new open trench with a metal grate wed walking surface allowing the piping to be visually seen and not be placed under the slab of either building. Replacement of the lines will require patching of the existing parking areas. d. Relocate Office Equipment to Support Repair Efforts. Scope: Existing Hangars 3 and 4 (Building J00003) are occupied. Prior to starting repair work, the contractor will need to relocate a significant amount of office furniture, equipment and specialty tools between hangars. Some furniture disassembly/reassembly will be required. The process will be reversed, moving staff equipment back into the hangars at the end of the project. The solicitation for this requirement will be issued as a Request for Proposals (RFP) and offers received in response to the RFP will be evaluated using a best value tradeoff source selection process as outlined in Federal Acquisition Regulation (FAR) Part 15. The RFP will result in the award of a single firm-fixed-price contract. Project specifications and drawings will be issued with the RFP, and the date upon which proposals are due will be announced in the RFP. The construction cost of this project is subject to the disclosure of the magnitude of construction projects in accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204 and is estimated to be between $10,000,000.00 and $25,000,000.00. The North American Industry Classification System (NAICS) Code for this project is 236220, with a small business size standard of $45 million. Competition for this forthcoming RFP will be limited to SMALL BUSINESS CONCERNS ONLY under the assigned NAICS code of 236220. Other than small business firms will be deemed ineligible to submit offers. On or about 19 June 2025, the RFP documents for this project will be available via the System for Award Management website (SAM.gov), https://sam.gov/, under Contract Opportunities W912DW25R15F0. To view and download the RFP documents when posted, your firm must be registered with https://sam.gov/. NO CD'S OR HARD COPIES WILL BE MADE AVAILABLE. Downloads are available only through https://sam.gov/. Offerors are responsible for checking https://sam.gov/ frequently for any update(s) to this notice. The Government is not responsible for any loss of internet connectivity or for an offeror's inability to access the document(s) at the referenced website. To obtain automatic notifications of updates to this RFP, you MUST log in to https://sam.gov/ and add the RFP to your \"Watchlist.\" If you would like to list your firm so others can see you are an interested vendor, you must click the \"Add Me to Interested Vendors\" button in the listing for this RFP. Firms will be required to submit their proposals electronically through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module at https://piee.eb.mil/. For PIEE registration, training, and instructions for posting an offer, refer to https://piee.eb.mil/. Note: There are two vendor roles (Proposal Manager, Proposal View Only) for the PIEE Solicitation Module. The Proposal Manager role is required to submit an offer to a solicitation. It is recommended that the Electronic Business (EB) point of contact in https://sam.gov/ also serves as the Contract Administrator (CAM) in PIEE for simplicity. As previously stated, this requirement will be set-aside for competition among eligible small business concerns ONLY. In accordance with FAR 5.203, the solicitation will be posted no earlier than 15 days after the posting of this notice. Point of Contact: The Point of Contact for administrative or contractual questions is Contract Specialist, Chris Baroldy, at email christopher.l.baroldy@usace.army.mil. Please do not ask technical questions, as answers to technical questions are only available through an online system during the solicitation process.","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"W912DW25R15F0","place_of_performance":{"zip":"98438","city":{"name":"McChord AFB"},"state":{"code":"WA"},"country":{"code":"USA"}},"product_service_code":"Y1BZ"},{"dates":{"posted":"2025-07-08","response_deadline":{"raw":"2025-08-08T14:00:00-07:00","utc":"2025-08-08T21:00:00Z","date":"2025-08-08","time":"14:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/7b925676a4a44aa3978b8445777a9061/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Repair Fire Suppression System, Hangars 3 and 4 on McChord Field, Joint Base Lewis-McChord (JBLM), WA.","agency":{"office":{"code":"W912DW","name":"W071 ENDIST SEATTLE"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"98134-2329","city":"SEATTLE","state":"WA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-10-31","archive_type":"auto_custom"},"contacts":[{"name":"Christopher Baroldy","role":"primary","email":"christopher.l.baroldy@usace.army.mil","phone":"2539663220"},{"name":"Shannan Jones","role":"secondary","email":"SHANNAN.M.JONES@USACE.ARMY.MIL","phone":"2533551169"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"7b925676a4a44aa3978b8445777a9061","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"f8f62036850a53121d08043be1db287695ee98dc213bae5e09a950060e625229","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"This is a solicitation for the award of a firm-fixed-price (FFP) contract to repair the fire suppression system in Hangars 3 and 4 on McChord Field, Joint Base Lewis-McChord, WA. This requirement will include the following scope of work:a. Repair Fire Suppression System, Hangars 3 and 4, Building J00003.Background: Building J00003 includes Hangar #3 and Hangar #4. Hangar #3 consists of approximately 16,742 square feet of first floor support spaces, 973 square feet of second floor support spaces, 73,459 square feet of Hangar Area that also includes 4,531 square feet of mechanical spaces above the center support areas yielding a total square footage of 95,705 square feet. Hangar #4 consists of approximately 16,376 square feet of first floor support spaces, 12,030 square feet of second floor support spaces, 75,010 square feet of Hangar Area that also includes 6,128 square feet of mechanical spaces above the center support areas yielding a total square footage of 109,544 square feet.Scope: Project will repair the failing fire suppression system in Hangars 3 and 4 (Building J00003). Work will include demolishing and repair by replacement of the high expansion foam system with an automatic sprinkler system, the wet-pipe automatic sprinkler system throughout the administrative support areas, and the fire alarm system with a fully addressable system that incorporates the fire alarm system control panel, remote power supply, initiation devices, and notification appliances. Work will also include repairing components of the ventilation and electrical systems and remediating asbestos contaminated material based on the assumption that there is underground asbestos-cement piping. Repair of the fire alarm system circuits and cabling shall be in accordance with the Unified Facilities Criteria (UFC). The fire suppression system will comply with UFC 4-211-01 Aircraft Maintenance Hangars, Chapter 5 (Air Force Specific Criteria), and Headquarters Air Force/A4 Memorandum Aircraft Hangar Fire Suppression System Modernization (3 June 2021).b. Repair Fire Pump House and Pumps, Building J00024.Background: The Fire Pump House (Building J00024) is 2,240 square feet and was built in 1968. The building is constructed of concrete and CMU with a 14-foot-high wall measured at the parapet. The building is built on a concrete slab that has multiple housekeeping pads, cut outs and anchors.Scope: The two (2) existing Fairbanks Morse diesel driven fire pumps at the East end of the Fire Pump House and the single Fairbanks Morse diesel driven foam fire pump at the east end of the Fire Pump House and their related equipment and piping, the existing foam storage tank, and concrete pads will be demolished and removed from the site. The remaining three (3) diesel fire pumps at the west end of the pump house will remain and continue to serve Hangar #1 and Hangar #2. The single exterior man door located in the South wall shall be replaced with a double wide exterior man door to allow work at the East end of the Fire pump house to occur. New fire pump work will include the installation of two (2) electrically driven fire pumps. Each of the two (2) electrically driven fire pumps shall be horizontal split case fire pumps that have an output rating of approximately 75 p.s.i. at 750 g.p.m. with a churn pressure of 88 p.s.i., a 150% rated capacity of 65 p.s.i., and a horsepower rating of approximately 65. The sprinkler, alarm and other support systems will also be replaced during the building repair.c. Repair Waterlines between Buildings J00003 and J00024.Scope: All existing 24-in. diameter underground mains serving Hangars 3 and 4 shall be demolished and removed from site. A new 8-in. Class 52 Ductile Iron Piping (DIP) will be installed from the Pump House (Building J00024) to serve Hangar #3 and Hangar #4. Each dedicated lead-in shall be brought into a new open trench with a metal grate wed walking surface allowing the piping to be visually seen and not be placed under the slab of either building. Replacement of the lines will require patching of the existing parking areas.d. Relocate Office Equipment to Support Repair Efforts.Scope: Existing Hangars 3 and 4 (Building J00003) are occupied. Prior to starting repair work, the contractor will need to relocate a significant amount of office furniture, equipment and specialty tools between hangars. Some furniture disassembly/reassembly will be required. The process will be reversed, moving staff equipment back into the hangars at the end of the project.The construction cost of this project is subject to the disclosure of the magnitude of construction projects in accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204 and is estimated to be between $10,000,000.00 and $25,000,000.00.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912DW25R15F0","place_of_performance":{"zip":"98438","street":"Hangars 3 and 4 (Building J00003), McChord Air Field, Joint Base Lewis McChord, WA"},"product_service_code":"Y1BZ"},{"dates":{"posted":"2025-07-30","response_deadline":{"raw":"2025-08-11T12:00:00-07:00","utc":"2025-08-11T19:00:00Z","date":"2025-08-11","time":"12:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/2e68f42ea5b2477ebd8c392c35fe90d4/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Repair Fire Suppression System, Hangars 3 and 4 on McChord Field, Joint Base Lewis-McChord (JBLM), WA.","agency":{"office":{"code":"W912DW","name":"W071 ENDIST SEATTLE"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"98134-2329","city":"SEATTLE","state":"WA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-10-31","archive_type":"auto_custom"},"contacts":[{"name":"Christopher Baroldy","role":"primary","email":"christopher.l.baroldy@usace.army.mil"},{"name":"Shannan Jones","role":"secondary","email":"shannan.m.jones@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"2e68f42ea5b2477ebd8c392c35fe90d4","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"41edb2a7ede094b65beced50ad519178b24584df9cd6e3c6b0a29c500ddac2f1","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"W912DW25R15F0_A0001****Amendment 0001 to RFP No. W912DW25R15F0 for project titled, Repair Fire Suppression System, Hangars 3 and 4, Joint Base Lewis-McChord, WA; PKG No. CE0737, is hereby issued to accomplish the following:_ Provide the first site visit sign in sheet._ Provide notification of a second site visit at Hangars 3 and 4 (Bldg. J00003), McChord Field, Joint Base Lewis McChord, WA. The second site visit will be conducted at 10:00 a.m. Pacific Daylight Time on 4 August 2025._ Provide a Geotechnical Report and a Hazardous Material Report._ Provide a map showing all the buildings the furniture and equipment is to be moved to._ Revise CE0737_Specifications EBS to remove any ambiguity concerning PM, Super, QCM, and SSHO roles. _ Extend the proposal due date from 2:00 p.m. Pacific Daylight Time (PDT) on 8 August 2025 to 12:00 p.m. PDT on 11 August 2025. No response will be posted to inquiries after the Close of Business on the third business day preceding the solicitation due date. End of W912DW25R15F0_A0001****This is a solicitation for the award of a firm-fixed-price (FFP) contract to repair the fire suppression system in Hangars 3 and 4 on McChord Field, Joint Base Lewis-McChord, WA. This requirement will include the following scope of work:a. Repair Fire Suppression System, Hangars 3 and 4, Building J00003.Background: Building J00003 includes Hangar #3 and Hangar #4. Hangar #3 consists of approximately 16,742 square feet of first floor support spaces, 973 square feet of second floor support spaces, 73,459 square feet of Hangar Area that also includes 4,531 square feet of mechanical spaces above the center support areas yielding a total square footage of 95,705 square feet. Hangar #4 consists of approximately 16,376 square feet of first floor support spaces, 12,030 square feet of second floor support spaces, 75,010 square feet of Hangar Area that also includes 6,128 square feet of mechanical spaces above the center support areas yielding a total square footage of 109,544 square feet.Scope: Project will repair the failing fire suppression system in Hangars 3 and 4 (Building J00003). Work will include demolishing and repair by replacement of the high expansion foam system with an automatic sprinkler system, the wet-pipe automatic sprinkler system throughout the administrative support areas, and the fire alarm system with a fully addressable system that incorporates the fire alarm system control panel, remote power supply, initiation devices, and notification appliances. Work will also include repairing components of the ventilation and electrical systems and remediating asbestos contaminated material based on the assumption that there is underground asbestos-cement piping. Repair of the fire alarm system circuits and cabling shall be in accordance with the Unified Facilities Criteria (UFC). The fire suppression system will comply with UFC 4-211-01 Aircraft Maintenance Hangars, Chapter 5 (Air Force Specific Criteria), and Headquarters Air Force/A4 Memorandum Aircraft Hangar Fire Suppression System Modernization (3 June 2021).b. Repair Fire Pump House and Pumps, Building J00024.Background: The Fire Pump House (Building J00024) is 2,240 square feet and was built in 1968. The building is constructed of concrete and CMU with a 14-foot-high wall measured at the parapet. The building is built on a concrete slab that has multiple housekeeping pads, cut outs and anchors.Scope: The two (2) existing Fairbanks Morse diesel driven fire pumps at the East end of the Fire Pump House and the single Fairbanks Morse diesel driven foam fire pump at the east end of the Fire Pump House and their related equipment and piping, the existing foam storage tank, and concrete pads will be demolished and removed from the site. The remaining three (3) diesel fire pumps at the west end of the pump house will remain and continue to serve Hangar #1 and Hangar #2. The single exterior man door located in the South wall shall be replaced with a double wide exterior man door to allow work at the East end of the Fire pump house to occur. New fire pump work will include the installation of two (2) electrically driven fire pumps. Each of the two (2) electrically driven fire pumps shall be horizontal split case fire pumps that have an output rating of approximately 75 p.s.i. at 750 g.p.m. with a churn pressure of 88 p.s.i., a 150% rated capacity of 65 p.s.i., and a horsepower rating of approximately 65. The sprinkler, alarm and other support systems will also be replaced during the building repair.c. Repair Waterlines between Buildings J00003 and J00024.Scope: All existing 24-in. diameter underground mains serving Hangars 3 and 4 shall be demolished and removed from site. A new 8-in. Class 52 Ductile Iron Piping (DIP) will be installed from the Pump House (Building J00024) to serve Hangar #3 and Hangar #4. Each dedicated lead-in shall be brought into a new open trench with a metal grate wed walking surface allowing the piping to be visually seen and not be placed under the slab of either building. Replacement of the lines will require patching of the existing parking areas.d. Relocate Office Equipment to Support Repair Efforts.Scope: Existing Hangars 3 and 4 (Building J00003) are occupied. Prior to starting repair work, the contractor will need to relocate a significant amount of office furniture, equipment and specialty tools between hangars. Some furniture disassembly/reassembly will be required. The process will be reversed, moving staff equipment back into the hangars at the end of the project.The construction cost of this project is subject to the disclosure of the magnitude of construction projects in accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204 and is estimated to be between $10,000,000.00 and $25,000,000.00.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912DW25R15F0","place_of_performance":{"zip":"98438","street":"Hangars 3 and 4 (Building J00003), McChord Air Field, Joint Base Lewis McChord, WA"},"product_service_code":"Y1BZ"},{"dates":{"posted":"2025-08-04","response_deadline":{"raw":"2025-08-11T12:00:00-07:00","utc":"2025-08-11T19:00:00Z","date":"2025-08-11","time":"12:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/8b7bc8ba872640928a5289f25342bcb0/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Repair Fire Suppression System, Hangars 3 and 4 on McChord Field, Joint Base Lewis-McChord (JBLM), WA.","agency":{"office":{"code":"W912DW","name":"W071 ENDIST SEATTLE"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"98134-2329","city":"SEATTLE","state":"WA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-10-31","archive_type":"auto_custom"},"contacts":[{"name":"Christopher Baroldy","role":"primary","email":"christopher.l.baroldy@usace.army.mil"},{"name":"Shannan Jones","role":"secondary","email":"shannan.m.jones@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"8b7bc8ba872640928a5289f25342bcb0","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"7c70e2050e61fbd6c3ce4759a63d4dd3c0006dd8a1579ef6d4c4f75f307ed342","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"W912DW25R15F0_A0002****Amendment 0002 to RFP No. W912DW25R15F0 for project titled, Repair Fire Suppression System, Hangars 3 and 4, Joint Base Lewis-McChord, WA; PKG No. CE0737, is hereby issued to accomplish the following:_ Section 00 10 00 ? Solicitation. Incorporates Item No 0005 and Item Number 0006 into the Price Schedule; _ Revise Section 00 21 00 Instructions. Para 1.1 General Information and Description of Work. Associated CLINs incorporated to paragraphs 1.1a through 1.1d, and adds paragraphs 1.1e and 1.1f; _ Revise Section 00 22 00 Supplementary Instructions. Paragraph 4.2 Volume II (PRICE PROPOSAL) is revised to incorporate a paragraph titled, ?Pricing Based on Estimated Costs? which provides instructions for CLINs 0005 and 0006; _ Revise Section 00 73 00 ? Supplementary Conditions. Bacon Davis Act Wage Det, General Decision Number WA20250111 dated 06/27/2025 is replaced in its entirety with Bacon Davis Act Wage Det, General Decision Number WA20250111 dated 07/18/2025; _ Section 01 00 00 ? General Requirements. Statement of Work. Revises the RFP Final date; incorporates paragraph 1.4.1.5 and associated sub-paragraph; Incorporates paragraph 1.4.1.6 and associated sub-paragraphs; revises paragraph 6.4 to reserved; revises paragraph 6.5 to reserved; adds language to paragraph 8.8.2c; and adds language to paragraph 8.8.3.3; _ Revise CE0737_Specifications EBS. Paragraph 1.6.1 Commissioning is deleted from Section 01 33 29 of the Specifications EBS; _Revise MDH150035J_Hangars 3 and 4 EBS Drawings. MDH150035J_Hangars 3 and 4 EBS Drawings to provide clarifications regarding utilities requirements (AW and CLP); _ All other terms and conditions under this solicitation remain unchanged. End of W912DW25R15F0_A0002****","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912DW25R15F0","place_of_performance":{"zip":"98438","street":"Hangars 3 and 4 (Building J00003), McChord Air Field, Joint Base Lewis McChord, WA"},"product_service_code":"Y1BZ"},{"dates":{"posted":"2025-08-07","response_deadline":{"raw":"2025-08-11T12:00:00-07:00","utc":"2025-08-11T19:00:00Z","date":"2025-08-11","time":"12:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/2aed413bc2544197af23ec8c581e099d/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Repair Fire Suppression System, Hangars 3 and 4 on McChord Field, Joint Base Lewis-McChord (JBLM), WA.","agency":{"office":{"code":"W912DW","name":"W071 ENDIST SEATTLE"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"98134-2329","city":"SEATTLE","state":"WA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-10-31","archive_type":"auto_custom"},"contacts":[{"name":"Christopher Baroldy","role":"primary","email":"christopher.l.baroldy@usace.army.mil"},{"name":"Shannan Jones","role":"secondary","email":"shannan.m.jones@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"2aed413bc2544197af23ec8c581e099d","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"097096b243a5586ef76fde64d07080fee4336213815f4e5c741f945ad04aacc8","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"W912DW25R15F0_A0003****Amendment 0003 to RFP No. W912DW25R15F0 for project titled, ?Repair Fire Suppression System, Hangars 3 and 4, Joint Base Lewis-McChord, WA; PKG No. CE0737, is hereby issued to accomplish the following: _ Section 01 00 00 ? General Requirements. Statement of Work. Revises the RFP Final date; and revises paragraph 1.4.1.1.3; _Sheet ED117 and MH-601 of the MDH150035J_Hangars 3 and 4 EBS Drawings. Sheets ED117 and MH-601 are revised to correct or to provide clarification on the sheet. All other terms and conditions under this solicitation remain unchanged. End of W912DW25R15F0_A0003***W912DW25R15F0_A0002****Amendment 0002 to RFP No. W912DW25R15F0 for project titled, Repair Fire Suppression System, Hangars 3 and 4, Joint Base Lewis-McChord, WA; PKG No. CE0737, is hereby issued to accomplish the following:_ Section 00 10 00 ? Solicitation. Incorporates Item No 0005 and Item Number 0006 into the Price Schedule; _ Revise Section 00 21 00 Instructions. Para 1.1 General Information and Description of Work. Associated CLINs incorporated to paragraphs 1.1a through 1.1d, and adds paragraphs 1.1e and 1.1f; _ Revise Section 00 22 00 Supplementary Instructions. Paragraph 4.2 Volume II (PRICE PROPOSAL) is revised to incorporate a paragraph titled, ?Pricing Based on Estimated Costs? which provides instructions for CLINs 0005 and 0006; _ Revise Section 00 73 00 ? Supplementary Conditions. Bacon Davis Act Wage Det, General Decision Number WA20250111 dated 06/27/2025 is replaced in its entirety with Bacon Davis Act Wage Det, General Decision Number WA20250111 dated 07/18/2025; _ Section 01 00 00 ? General Requirements. Statement of Work. Revises the RFP Final date; incorporates paragraph 1.4.1.5 and associated sub-paragraph; Incorporates paragraph 1.4.1.6 and associated sub-paragraphs; revises paragraph 6.4 to reserved; revises paragraph 6.5 to reserved; adds language to paragraph 8.8.2c; and adds language to paragraph 8.8.3.3; _ Revise CE0737_Specifications EBS. Paragraph 1.6.1 Commissioning is deleted from Section 01 33 29 of the Specifications EBS; _Revise MDH150035J_Hangars 3 and 4 EBS Drawings. MDH150035J_Hangars 3 and 4 EBS Drawings to provide clarifications regarding utilities requirements (AW and CLP); _ All other terms and conditions under this solicitation remain unchanged. End of W912DW25R15F0_A0002****W912DW25R15F0_A0001****Amendment 0001 to RFP No. W912DW25R15F0 for project titled, Repair Fire Suppression System, Hangars 3 and 4, Joint Base Lewis-McChord, WA; PKG No. CE0737, is hereby issued to accomplish the following:_ Provide the first site visit sign in sheet._ Provide notification of a second site visit at Hangars 3 and 4 (Bldg. J00003), McChord Field, Joint Base Lewis McChord, WA. The second site visit will be conducted at 10:00 a.m. Pacific Daylight Time on 4 August 2025._ Provide a Geotechnical Report and a Hazardous Material Report._ Provide a map showing all the buildings the furniture and equipment is to be moved to._ Revise CE0737_Specifications EBS to remove any ambiguity concerning PM, Super, QCM, and SSHO roles. _ Extend the proposal due date from 2:00 p.m. Pacific Daylight Time (PDT) on 8 August 2025 to 12:00 p.m. PDT on 11 August 2025. No response will be posted to inquiries after the Close of Business on the third business day preceding the solicitation due date. End of W912DW25R15F0_A0001****This is a solicitation for the award of a firm-fixed-price (FFP) contract to repair the fire suppression system in Hangars 3 and 4 on McChord Field, Joint Base Lewis-McChord, WA. This requirement will include the following scope of work: a. Repair Fire Suppression System, Hangars 3 and 4, Building J00003.Background: Building J00003 includes Hangar #3 and Hangar #4. Hangar #3 consists of approximately 16,742 square feet of first floor support spaces, 973 square feet of second floor support spaces, 73,459 square feet of Hangar Area that also includes 4,531 square feet of mechanical spaces above the center support areas yielding a total square footage of 95,705 square feet. Hangar #4 consists of approximately 16,376 square feet of first floor support spaces, 12,030 square feet of second floor support spaces, 75,010 square feet of Hangar Area that also includes 6,128 square feet of mechanical spaces above the center support areas yielding a total square footage of 109,544 square feet.Scope: Project will repair the failing fire suppression system in Hangars 3 and 4 (Building J00003). Work will include demolishing and repair by replacement of the high expansion foam system with an automatic sprinkler system, the wet-pipe automatic sprinkler system throughout the administrative support areas, and the fire alarm system with a fully addressable system that incorporates the fire alarm system control panel, remote power supply, initiation devices, and notification appliances. Work will also include repairing components of the ventilation and electrical systems and remediating asbestos contaminated material based on the assumption that there is underground asbestos-cement piping. Repair of the fire alarm system circuits and cabling shall be in accordance with the Unified Facilities Criteria (UFC). The fire suppression system will comply with UFC 4-211-01 Aircraft Maintenance Hangars, Chapter 5 (Air Force Specific Criteria), and Headquarters Air Force/A4 Memorandum Aircraft Hangar Fire Suppression System Modernization (3 June 2021).b. Repair Fire Pump House and Pumps, Building J00024.Background: The Fire Pump House (Building J00024) is 2,240 square feet and was built in 1968. The building is constructed of concrete and CMU with a 14-foot-high wall measured at the parapet. The building is built on a concrete slab that has multiple housekeeping pads, cut outs and anchors.Scope: The two (2) existing Fairbanks Morse diesel driven fire pumps at the East end of the Fire Pump House and the single Fairbanks Morse diesel driven foam fire pump at the east end of the Fire Pump House and their related equipment and piping, the existing foam storage tank, and concrete pads will be demolished and removed from the site. The remaining three (3) diesel fire pumps at the west end of the pump house will remain and continue to serve Hangar #1 and Hangar #2. The single exterior man door located in the South wall shall be replaced with a double wide exterior man door to allow work at the East end of the Fire pump house to occur. New fire pump work will include the installation of two (2) electrically driven fire pumps. Each of the two (2) electrically driven fire pumps shall be horizontal split case fire pumps that have an output rating of approximately 75 p.s.i. at 750 g.p.m. with a churn pressure of 88 p.s.i., a 150% rated capacity of 65 p.s.i., and a horsepower rating of approximately 65. The sprinkler, alarm and other support systems will also be replaced during the building repair.c. Repair Waterlines between Buildings J00003 and J00024.Scope: All existing 24-in. diameter underground mains serving Hangars 3 and 4 shall be demolished and removed from site. A new 8-in. Class 52 Ductile Iron Piping (DIP) will be installed from the Pump House (Building J00024) to serve Hangar #3 and Hangar #4. Each dedicated lead-in shall be brought into a new open trench with a metal grate wed walking surface allowing the piping to be visually seen and not be placed under the slab of either building. Replacement of the lines will require patching of the existing parking areas.d. Relocate Office Equipment to Support Repair Efforts.Scope: Existing Hangars 3 and 4 (Building J00003) are occupied. Prior to starting repair work, the contractor will need to relocate a significant amount of office furniture, equipment and specialty tools between hangars. Some furniture disassembly/reassembly will be required. The process will be reversed, moving staff equipment back into the hangars at the end of the project.The construction cost of this project is subject to the disclosure of the magnitude of construction projects in accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204 and is estimated to be between $10,000,000.00 and $25,000,000.00.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912DW25R15F0","place_of_performance":{"zip":"98438","street":"Hangars 3 and 4 (Building J00003), McChord Air Field, Joint Base Lewis McChord, WA"},"product_service_code":"Y1BZ"},{"award":{"date":"2025-09-26","amount":"18057264.13","number":"W912DW25C0033","awardee":{"raw":"VET INDUSTRIAL INC Bremerton WA 98337 USA","name":"VET INDUSTRIAL INC Bremerton","location":{"zip":"98337","state":{"code":"WA"},"country":{"code":"USA"}}}},"dates":{"posted":"2025-09-26","award_date":"2025-09-26"},"links":{"sam":"https://sam.gov/workspace/contract/opp/470e5142ce8b49cfa2de6aa50e1f79bd/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Repair Fire Suppression System, Hangars 3 and 4 on McChord Field, Joint Base Lewis-McChord (JBLM), WA.","agency":{"office":{"code":"W912DW","name":"W071 ENDIST SEATTLE"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"98134-2329","city":"SEATTLE","state":"WA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-10-11","archive_type":"auto15"},"contacts":[{"name":"Christopher Baroldy","role":"primary","email":"christopher.l.baroldy@usace.army.mil"},{"name":"Shannan Jones","role":"secondary","email":"shannan.m.jones@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"470e5142ce8b49cfa2de6aa50e1f79bd","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"dadcde6fd360707120a80595a44b888ef08ecd5ef6ee314b581da1bb12a8c223","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"W912DW25C0033_“Repair Fire Suppression System, Hangars 3 & 4” on McChord Field, Joint Base Lewis-McChord (JBLM), WA. was awarded on 26 September 2025 to Vet Industrial Inc | 811 Pacific AVE | Bremerton, WA 98337","origin":"extract"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"W912DW25C0033","place_of_performance":{"zip":"98433","city":{"name":"Joint Base Lewis McChord"},"state":{"code":"WA"},"country":{"code":"USA"}},"product_service_code":"Y1BZ"}],"due_at":"2025-08-11T19:00:00Z","due_date":"2025-08-11","closes_at":"2025-08-11T19:00:00Z","awardable":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912DW","office_name":"W071 ENDIST SEATTLE","state":"WA","county":"53053","county_name":"Pierce County","city":"5341155","city_name":"McChord AFB","country":"USA","winner_key":"NKABYQJX6GD7","amount":"18057264.13","linked_awards":7,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z","principal_notice_id":"470e5142ce8b49cfa2de6aa50e1f79bd","description":{"text":"W912DW25C0033_“Repair Fire Suppression System, Hangars 3 & 4” on McChord Field, Joint Base Lewis-McChord (JBLM), WA. was awarded on 26 September 2025 to Vet Industrial Inc | 811 Pacific AVE | Bremerton, WA 98337","html":null,"origin":"extract"},"contacts":[{"name":"Christopher Baroldy","role":"primary","email":"christopher.l.baroldy@usace.army.mil"},{"name":"Shannan Jones","role":"secondary","email":"shannan.m.jones@usace.army.mil"}],"place_of_performance":{"zip":"98433","city":{"name":"Joint Base Lewis McChord"},"state":{"code":"WA"},"country":{"code":"USA"}},"office_address":{"zip":"98134-2329","city":"SEATTLE","state":"WA","country":"USA"},"naics_codes":["236220"],"award":{"date":"2025-09-26","amount":"18057264.13","number":"W912DW25C0033","awardee":{"raw":"VET INDUSTRIAL INC Bremerton WA 98337 USA","name":"VET INDUSTRIAL INC Bremerton","location":{"zip":"98337","state":{"code":"WA"},"country":{"code":"USA"}}}},"attachments":[],"awards":[{"award_key":"CONT_AWD_W912DW25C0033_9700_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_W912DW25C0033_9700_-NONE-_-NONE-/","piid":"W912DW25C0033","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"NKABYQJX6GD7","recipient_name":"VET INDUSTRIAL INC","recipient_uei":"NKABYQJX6GD7","recipient_cage":"4DTS7","recipient_city":"BREMERTON","recipient_state":"WA","sub_name":"Department of the Army","office_name":"W071 ENDIST SEATTLE","office_key":"o-W912DW","first_action_date":"2025-09-26","last_action_date":"2026-05-21","actions":5,"obligated":"18096843.82","current_total_value":"18690329.17","potential_total_value":"18690329.17","naics":"236220","psc":"Y1BZ","extent_competed":"FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES","set_aside":"SMALL BUSINESS SET ASIDE - TOTAL","offers_received":3,"description":"THE CONTRACTOR SHALL SUPPLY ALL SUPERVISION, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IAW THE CONTRACT SPECS, THE SOW, AND DRAWINGS TO RPR AND RPL EXISTING FIRE SUPPRESSION SYSTEMS FOR HANGERS 3 AND 4 AND THE FIRE PUMP HOUSE.","method":"piid","confidence":"high","evidence":["award number W912DW25C0033 equals the contract number","same awarding office W912DW"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"W912DW26RA053","latest_notice_id":"621002f5d92c4d179c10549c25b716ce","title":"Chief Joseph Dam 480V Station Service SQ1-3, & DSQ 1-2","solicitation_number":"W912DW26RA053","notice_type":"p","first_type":"p","first_posted":"2026-09-04","last_posted":"2026-09-04","notices":1,"due_at":"2026-09-18T17:00:00Z","due_date":"2026-09-18","closes_at":"2026-09-18T17:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912DW","office_name":"W071 ENDIST SEATTLE","naics":"237990","psc":"Y1PZ","set_aside":"SBA","state":"WA","county":"53017","county_name":"Douglas County","city":"5307870","city_name":"Bridgeport","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"W912DW27RA011","latest_notice_id":"2abd4809016e4df48e032c4eb5a963af","title":"$300M Indefinite Delivery / Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for Facilities Sustainment, Restoration, and Modernization (FSRM) Program at Joint Base Lewis-McChord (JBLM)","solicitation_number":"W912DW27RA011","notice_type":"r","first_type":"r","first_posted":"2026-08-26","last_posted":"2026-08-26","notices":1,"due_at":"2026-09-20T21:00:00Z","due_date":"2026-09-20","closes_at":"2026-09-20T21:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912DW","office_name":"W071 ENDIST SEATTLE","naics":"236220","psc":"Y1JZ","set_aside":null,"state":"WA","county":"53053","county_name":"Pierce County","city":null,"city_name":null,"country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"DACA675270000900","latest_notice_id":"49d49183004e4c629535ad99f5f5c927","title":"DACA675270000900 - United States Army Corps of Engineers (USACE) seeks to lease approximately 3,676 gross square feet of retail space in Gresham, Oregon for an Armed Forces Career Center (Military Recruiting Office) Notice ID: DACA675270000900","solicitation_number":"DACA675270000900","notice_type":"o","first_type":"o","first_posted":"2026-09-10","last_posted":"2026-09-10","notices":1,"due_at":"2026-10-06T06:59:00Z","due_date":"2026-10-05","closes_at":"2026-10-06T06:59:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912DW","office_name":"W071 ENDIST SEATTLE","naics":"53112","psc":"X1AA","set_aside":null,"state":"OR","county":"41051","county_name":"Multnomah County","city":"4131250","city_name":"Gresham","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"W912DW26QA073","latest_notice_id":"719f36e5ca4e47aea27163ea614f7b93","title":"Propane Delivery and Tank Rental for Howard Hanson Dam and Mud Mountain Dam in Washington State","solicitation_number":"W912DW26QA073","notice_type":"k","first_type":"k","first_posted":"2026-09-09","last_posted":"2026-09-16","notices":2,"due_at":"2026-10-06T19:00:00Z","due_date":"2026-10-06","closes_at":"2026-10-06T19:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912DW","office_name":"W071 ENDIST SEATTLE","naics":"325120","psc":"W099","set_aside":"SBA","state":"WA","county":"53033","county_name":"King County","city":"5322045","city_name":"Enumclaw","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-17T06:28:38.602097Z"},{"key":"W912DW27RA014","latest_notice_id":"1faa6828c3784736b79272dac24c6641","title":"Joint Base Lewis McChord (JBLM) Multi Domain Task Force (MDTF) Buildings (BLDGs) 3223 and 3224","solicitation_number":"W912DW27RA014","notice_type":"p","first_type":"p","first_posted":"2026-09-16","last_posted":"2026-09-16","notices":1,"due_at":"2026-11-13T22:00:00Z","due_date":"2026-11-13","closes_at":"2026-11-13T22:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912DW","office_name":"W071 ENDIST SEATTLE","naics":"236220","psc":"Y1AZ","set_aside":"SBA","state":"WA","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-17T06:28:38.602097Z"}]}