{"canonical":"https://abierto.us/opportunities/w912ds26ra0017","key":"W912DS26RA0017","url":"https://abierto.us/opportunities/w912ds26ra0017","title":"Advance Notice - Design and construction of the Port Monmouth Phase II, Contract 1 Mitigation project in Middletown Township, Monmouth County, New Jersey.","solicitation_number":"W912DS26RA0017","notice_type":"s","open":false,"response_deadline":"2026-04-06T16:00:00Z","first_posted":"2026-03-20","last_posted":"2026-03-26","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"W2SD ENDIST NEW YORK","naics":"237990","psc":"Y1PZ","set_aside":null,"place_state":"NJ","place_county":"34025","place_county_name":"Monmouth County","place_city":"3460360","place_city_name":"Port Monmouth","winner":null,"award_amount":null,"publications":[{"notice_id":"a2c172ec241d4a29affcc806026fabc5","title":"Advance Notice - Design and construction of the Port Monmouth Phase II, Contract 1 Mitigation project in Middletown Township, Monmouth County, New Jersey.","solicitation_number":"W912DS26RA0017","notice_type":"s","base_type":"r","posted":"2026-03-20","posted_at":null,"due_at":"2026-04-06T16:00:00Z","due_date":"2026-04-06","cancelled":null,"archived":null,"archive_date":"2026-04-21","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a2c172ec241d4a29affcc806026fabc5/view","enriched":false,"history":[]},{"notice_id":"f926fc276e2e407495e51121db61abd9","title":"Advance Notice - Design and construction of the Port Monmouth Phase II, Contract 1 Mitigation project in Middletown Township, Monmouth County, New Jersey.","solicitation_number":"W912DS26RA0017","notice_type":"s","base_type":"s","posted":"2026-03-26","posted_at":null,"due_at":"2026-04-06T16:00:00Z","due_date":"2026-04-06","cancelled":null,"archived":null,"archive_date":"2026-04-21","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/f926fc276e2e407495e51121db61abd9/view","enriched":false,"history":[]}],"latest_notice_id":"f926fc276e2e407495e51121db61abd9","first_type":"s","notices":[{"dates":{"posted":"2026-03-20","response_deadline":{"raw":"2026-04-06T12:00:00-04:00","utc":"2026-04-06T16:00:00Z","date":"2026-04-06","time":"12:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/a2c172ec241d4a29affcc806026fabc5/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Advance Notice - Design and construction of the Port Monmouth Phase II, Contract 1 Mitigation project in Middletown Township, Monmouth County, New Jersey.","agency":{"office":{"code":"W912DS","name":"W2SD ENDIST NEW YORK"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"10278-0004","city":"NEW YORK","state":"NY","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2026-04-21","archive_type":"auto15"},"contacts":[{"name":"Adrian Stafford-Browne","role":"primary","email":"adrian.j.stafford-browne@usace.army.mil"},{"name":"Nicholas P. Emanuel","role":"secondary","email":"nicholas.p.emanuel@usace.army.mil"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"a2c172ec241d4a29affcc806026fabc5","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"77f7ae97b3752f87850e515581c8af3aac58cfcc1cc6650ff79e82f88c6dd1a3","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-09-16T16:22:53.920682Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"text":"ADVANCE NOTICE: Port Monmouth Phase II, Contract 1 Mitigation, New Jersey Design and construction of the Port Monmouth Phase II, Contract 1 Mitigation project in Middletown Township, Monmouth County, New Jersey. This notice is for informational and planning purposes only and does not constitute a solicitation for bids or proposals. PROJECT DESCRIPTION The Port Monmouth project includes shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project. This design-build construction contract scope includes the design and construction services of forested and emergent wetlands at the Pews site, scrub-shrub and herbaceous tidal wetlands at the Compton Creek site and purchase of wetland mitigation bank credits. Acquisition Strategy: This is a two-phase \"Best Value Trade Off\" solicitation in accordance with Federal Acquisition Regulation (FAR) 15.101-1 for Port Monmouth Phase II, Contract 1 Mitigation at Monmouth County, NJ. The Government will evaluate the proposals in accordance with the Source Selection Criteria, and award a firm fixed price contract to the responsible firm, whose proposal conforms to all the terms and conditions of the solicitation and is fair and reasonable and offers the best overall value to the Government. The formal Design-Build Best Value Trade Off (DB BVTO) is anticipated to be issued on or about April 2026 . The period of performance for this project is 746 calendar days from the Notice to Proceed date. CLASSIFICATION NAICS Code: 237990 (Other Heavy and Civil Engineering Construction) Place of Performance: Port Monmouth, NJ Project Magnitude: Between $15,000,000 and $30,000,000 This project will be acquired via Full and Open Competition – Unrestricted","origin":"extract"},"notice_type":{"code":"s","label":"Special Notice"},"schema_version":1,"solicitation_number":"W912DS26RA0017","place_of_performance":{"city":{"name":"Port Monmouth"},"state":{"code":"NJ"},"country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"dates":{"posted":"2026-03-26","response_deadline":{"raw":"2026-04-06T12:00:00-04:00","utc":"2026-04-06T16:00:00Z","date":"2026-04-06","time":"12:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/f926fc276e2e407495e51121db61abd9/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Advance Notice - Design and construction of the Port Monmouth Phase II, Contract 1 Mitigation project in Middletown Township, Monmouth County, New Jersey.","agency":{"office":{"code":"W912DS","name":"W2SD ENDIST NEW YORK"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"10278-0004","city":"NEW YORK","state":"NY","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2026-04-21","archive_type":"auto15"},"contacts":[{"name":"Adrian Stafford-Browne","role":"primary","email":"adrian.j.stafford-browne@usace.army.mil"},{"name":"Nicholas P. Emanuel","role":"secondary","email":"nicholas.p.emanuel@usace.army.mil"}],"base_type":{"code":"s","label":"Special Notice"},"notice_id":"f926fc276e2e407495e51121db61abd9","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"2266b071e2861c9527014da8bb4c580ca13e8d647be60428704c1ca4094964bf","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-09-16T16:22:53.920682Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"text":"As of 26 March 2026: the advance notice has been corrected to indicate that this contract doesn’t include the purchase of wetland mitigation credits. ADVANCE NOTICE: Port Monmouth Phase II, Contract 1 Mitigation, New Jersey Design and construction of the Port Monmouth Phase II, Contract 1 Mitigation project in Middletown Township, Monmouth County, New Jersey. This notice is for informational and planning purposes only and does not constitute a solicitation for bids or proposals. PROJECT DESCRIPTION The Port Monmouth project includes shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project.. This design-build construction contract scope includes the design and construction services of forested and emergent wetlands at the Pews site, scrub-shrub and herbaceous tidal wetlands at the Compton Creek site. Acquisition Strategy: This is a two-phase \"Best Value Trade Off\" solicitation in accordance with Federal Acquisition Regulation (FAR) 15.101-1 for Port Monmouth Phase II, Contract 1 Mitigation at Monmouth County, NJ. The Government will evaluate the proposals in accordance with the Source Selection Criteria, and award a firm fixed price contract to the responsible firm, whose proposal conforms to all the terms and conditions of the solicitation and is fair and reasonable and offers the best overall value to the Government. The formal Design-Build Best Value Trade Off (DB BVTO) is anticipated to be issued on or about April 2026 . The period of performance for this project is 746 calendar days from the Notice to Proceed date. CLASSIFICATION NAICS Code: 237990 (Other Heavy and Civil Engineering Construction) Place of Performance: Port Monmouth, NJ Project Magnitude: Between $15,000,000 and $30,000,000 This project will be acquired via Full and Open Competition – Unrestricted","origin":"extract"},"notice_type":{"code":"s","label":"Special Notice"},"schema_version":1,"solicitation_number":"W912DS26RA0017","place_of_performance":{"city":{"name":"Port Monmouth"},"state":{"code":"NJ"},"country":{"code":"USA"}},"product_service_code":"Y1PZ"}],"due_at":"2026-04-06T16:00:00Z","due_date":"2026-04-06","closes_at":"2026-04-06T16:00:00Z","awardable":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912DS","office_name":"W2SD ENDIST NEW YORK","state":"NJ","county":"34025","county_name":"Monmouth County","city":"3460360","city_name":"Port Monmouth","country":"USA","winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z","principal_notice_id":"f926fc276e2e407495e51121db61abd9","description":{"text":"As of 26 March 2026: the advance notice has been corrected to indicate that this contract doesn’t include the purchase of wetland mitigation credits. ADVANCE NOTICE: Port Monmouth Phase II, Contract 1 Mitigation, New Jersey Design and construction of the Port Monmouth Phase II, Contract 1 Mitigation project in Middletown Township, Monmouth County, New Jersey. This notice is for informational and planning purposes only and does not constitute a solicitation for bids or proposals. PROJECT DESCRIPTION The Port Monmouth project includes shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project.. This design-build construction contract scope includes the design and construction services of forested and emergent wetlands at the Pews site, scrub-shrub and herbaceous tidal wetlands at the Compton Creek site. Acquisition Strategy: This is a two-phase \"Best Value Trade Off\" solicitation in accordance with Federal Acquisition Regulation (FAR) 15.101-1 for Port Monmouth Phase II, Contract 1 Mitigation at Monmouth County, NJ. The Government will evaluate the proposals in accordance with the Source Selection Criteria, and award a firm fixed price contract to the responsible firm, whose proposal conforms to all the terms and conditions of the solicitation and is fair and reasonable and offers the best overall value to the Government. The formal Design-Build Best Value Trade Off (DB BVTO) is anticipated to be issued on or about April 2026 . The period of performance for this project is 746 calendar days from the Notice to Proceed date. CLASSIFICATION NAICS Code: 237990 (Other Heavy and Civil Engineering Construction) Place of Performance: Port Monmouth, NJ Project Magnitude: Between $15,000,000 and $30,000,000 This project will be acquired via Full and Open Competition – Unrestricted","html":null,"origin":"extract"},"contacts":[{"name":"Adrian Stafford-Browne","role":"primary","email":"adrian.j.stafford-browne@usace.army.mil"},{"name":"Nicholas P. Emanuel","role":"secondary","email":"nicholas.p.emanuel@usace.army.mil"}],"place_of_performance":{"city":{"name":"Port Monmouth"},"state":{"code":"NJ"},"country":{"code":"USA"}},"office_address":{"zip":"10278-0004","city":"NEW YORK","state":"NY","country":"USA"},"naics_codes":["237990"],"award":null,"attachments":[],"awards":[],"related":[{"key":"DACA51526003","latest_notice_id":"74c94e84feef4b5f8105ad3fcc7b06dc","title":"US Armed Forces Career Center - 3,750 RSF Rome NY","solicitation_number":"DACA51-5-26-003","notice_type":"p","first_type":"p","first_posted":"2026-09-08","last_posted":"2026-09-08","notices":1,"due_at":"2026-09-21T04:01:00Z","due_date":"2026-09-21","closes_at":"2026-09-21T04:01:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912DS","office_name":"W2SD ENDIST NEW YORK","naics":"53131","psc":"X1AA","set_aside":null,"state":"NY","county":"36065","county_name":"Oneida County","city":"3663418","city_name":"Rome","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"W912DS26BA035","latest_notice_id":"e4325965cc264e0b8640bcd425917e96","title":"DeLong Pier Repair","solicitation_number":"W912DS26BA035","notice_type":"p","first_type":"p","first_posted":"2026-09-10","last_posted":"2026-09-10","notices":1,"due_at":"2026-09-25T16:00:00Z","due_date":"2026-09-25","closes_at":"2026-09-25T16:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912DS","office_name":"W2SD ENDIST NEW YORK","naics":"237990","psc":"Z2PZ","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"W912DS26BA032","latest_notice_id":"0aea97954554461c9d98a34d3ef1c2e9","title":"Construction of the Power Generation with Microgrid at Joint Base McGuire-Dix-Lakehurst (JBMDL), New Hanover, NJ","solicitation_number":"W912DS26BA032","notice_type":"o","first_type":"p","first_posted":"2026-07-17","last_posted":"2026-09-09","notices":5,"due_at":"2026-09-28T18:00:00Z","due_date":"2026-09-28","closes_at":"2026-09-28T18:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912DS","office_name":"W2SD ENDIST NEW YORK","naics":"236220","psc":"Y1NZ","set_aside":null,"state":"NJ","county":"34005","county_name":"Burlington County","city":null,"city_name":null,"country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"W912DS26S0045","latest_notice_id":"25c604e23add4044b1a453b53eaeb04d","title":"Pituffik Space Base Project Delivery Method Market Research Questionnaire","solicitation_number":"W912DS26S0045","notice_type":"r","first_type":"r","first_posted":"2026-09-15","last_posted":"2026-09-15","notices":1,"due_at":"2026-10-02T03:59:00Z","due_date":"2026-10-01","closes_at":"2026-10-02T03:59:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912DS","office_name":"W2SD ENDIST NEW YORK","naics":null,"psc":null,"set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":"GRL","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"W912DS26RA032","latest_notice_id":"e194e26d977a46388cf7f215ffc8f94d","title":"Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project","solicitation_number":"W912DS26RA032","notice_type":"o","first_type":"o","first_posted":"2026-09-17","last_posted":"2026-09-17","notices":1,"due_at":"2026-10-19T18:00:00Z","due_date":"2026-10-19","closes_at":"2026-10-19T18:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912DS","office_name":"W2SD ENDIST NEW YORK","naics":"237990","psc":"Y1PZ","set_aside":null,"state":"NJ","county":"34025","county_name":"Monmouth County","city":"3460360","city_name":"Port Monmouth","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-18T04:00:44.545196Z"}]}