# NY Harbor-Sandy Hook Channel: Market Survey - Industry's Barge Pump-Out Capability

Canonical: https://abierto.us/opportunities/w912ds25s0006

- Solicitation number: W912DS25S0006
- Notice type: Sources sought
- Status: Closed. Deadline was December 31, 2024 at 2:00 PM EST
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W2SD Endist New York (W912DS)
- NAICS: 237990 Other Heavy and Civil Engineering Construction
- Product or service code: Y1KZ Construction Of Other Conservation And Development Facilities
- Place of performance: Highlands, New Jersey
- County: Monmouth County (FIPS 34025). https://abierto.us/counties/monmouth-county-nj-34025
- City: Highlands. https://abierto.us/cities/highlands-nj-3431500
- First posted: December 12, 2024
- Last posted: December 12, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/aae500d715ea4f589caf0000c14b3e42/view

## Description

MARKET SURVEY OF THE DREDGING INDUSTRY The following is a confidential survey questionnaire designed to apprise USACE of prospective dredging contractors’ project execution capabilities. Please provide your response to the following questions. All questions are regarding industry’s general capabilities in executing maintenance dredging projects. General 1. Do you have the capability to pump out material from a scow, barge, or similar equipment, after it has been dredged mechanically? If so, please explain the equipment needed and the process. 2. Do you own or have access to a scow / barge with pump out capability?

a. If so, what is the capacity of the scow / barge?

b. Does the pump out scow / barge have bottom dumping capability as well, or is it sealed?

c. Can the dredged material be placed directly into the pump out scow / barge, or does the dredged material need to be rehandled and transferred from a separate scow into the pump out scow / barge? 3. Can sandy dredged material be pumped from the pump out scow / barge to an upland beach site or stockpile site?

a. If so, what would be the average rate (volume per day) sandy material could be pumped from the scow / barge to an upland beach or stockpile.

b. What would be the approximate pump distance capability from the pump out scow / barge with no addition of a booster pump(s)? Approximate pump distance capability from the pump out scow / barge with the addition of a booster pump(s)? 4. Can sandy dredged material be pumped from the scow / barge into shallow water, in a bay, to create bottom habitat?

What would be the average rate (volume per day) sandy material could be pumped out into shallow water in a bay, not having sufficient depth for bottom dumping placement? What would be the approximate pump distance capability in those conditions, with and without the addition of a booster pump(s)?

5. What would be the approximate percentage of cost differential when comparing the cost of off-shore / ocean placement using a bottom dump scow, to the cost of beach placement and off-shore placement into shallow water using a scow / barge with pump out capability? (Please assuming the same travel distance and account for the extra cost of heavy equipment associated with beach placement and the potential need for a shallow draft scow / barge for shallow water placement). The cost differential would be used for planning purposes only.

## Publications

- December 12, 2024: Sources sought, due December 31, 2024 at 2:00 PM EST. Notice a248317b786643f39bb4704752378d40. https://sam.gov/workspace/contract/opp/a248317b786643f39bb4704752378d40/view
- December 12, 2024: Sources sought, due December 31, 2024 at 2:00 PM EST. Notice aae500d715ea4f589caf0000c14b3e42. https://sam.gov/workspace/contract/opp/aae500d715ea4f589caf0000c14b3e42/view

## Points of contact

- Brian Winters, brian.h.winters@usace.army.mil

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/w912ds25s0006.