# Kansas City Levees UPRR Closure Structure

Canonical: https://abierto.us/opportunities/w912dq26ra035

- Solicitation number: W912DQ26RA035
- Notice type: Award notice (first published as presolicitation)
- Status: Awarded to Mobley Contractors, Inc. 952 Highway 287 Morrilton 72110 USA for $18,803,862.25
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W071 Endist Kansas City (W912DQ)
- NAICS: 237990 Other Heavy and Civil Engineering Construction
- Product or service code: Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
- County: Wyandotte County (FIPS 20209). https://abierto.us/counties/wyandotte-county-ks-20209
- City: Kansas City. https://abierto.us/cities/kansas-city-ks-2036000
- First posted: February 20, 2026
- Last posted: August 24, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/e7dd33ed223347d485a4735bb096aa99/view

## Description

The Kansas City District, United States Army Corps of Engineers (USACE), has a need for the construction of four closure structures (two stoplog and two sandbag) located on both sides of two Union Pacific Railroad (UPRR)- owned bridges crossing the Armourdale (ARM; West side of the Kansas River) and Central Industrial District (CID; East side of the Kansas River) Levee Units.

The south bridge (UPRR #3) contains two sets of railroad tracks: Mainline Track No. 1 and Mainline Track No. 2. The north bridge (MOPAC) contains two sets of railroad tracks: Track No. 3 and Track No. 202. Floodwalls are to be constructed to the north and the south of the closure structures and tie into existing floodwalls on the ARM side. Closure structures on the CID side connect to earthen levees.

Stoplogs and all stoplog components need to be fabricated for the project, and once construction of the stoplog closure structures is complete, a test-fit of the stoplogs across Mainline Track No. 1 and Mainline Track No. 2 is required. To facilitate construction and test-fit of the stop logs, UPRR will require the approval of construction submittals, including a phasing plan, temporary shoring plans, and obtaining temporary track outages.

Construction will require flagging operations for all activities within 25 feet of the track or if equipment has the potential to foul track. Stoplog storage structures to store all stoplog components also need to be provided on each levee unit.

## Publications

- February 20, 2026: Presolicitation. Notice 4057b69c75ac49aeac6192d4d31b58fb. https://sam.gov/workspace/contract/opp/4057b69c75ac49aeac6192d4d31b58fb/view
- March 9, 2026: Solicitation, due April 23, 2026 at 12:00 PM EDT. Notice b1d7305548fd4b97981868d067752b7f. https://sam.gov/workspace/contract/opp/b1d7305548fd4b97981868d067752b7f/view
- March 10, 2026: Solicitation, due April 23, 2026 at 12:00 PM EDT. Notice 711a82c9ae9f40ff9d2921ffe071acc7. https://sam.gov/workspace/contract/opp/711a82c9ae9f40ff9d2921ffe071acc7/view
- March 18, 2026: Solicitation, due April 23, 2026 at 12:00 PM EDT. Notice 9deff93c77c14414a3f702d893322d58. https://sam.gov/workspace/contract/opp/9deff93c77c14414a3f702d893322d58/view
- August 24, 2026: Award notice. Notice e7dd33ed223347d485a4735bb096aa99. https://sam.gov/workspace/contract/opp/e7dd33ed223347d485a4735bb096aa99/view