# FALL CHINOOK FISH PRODUCTION AT RINGOLD SPRINGS HATCHERY

Canonical: https://abierto.us/opportunities/w9127n26ra0007

- Solicitation number: W9127N26RA0007
- Notice type: Special notice
- Status: Closed. Deadline was October 30, 2025 at 5:00 PM EDT
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W071 Endist Portland (W9127N)
- NAICS: 112511 Finfish Farming and Fish Hatcheries
- Product or service code: F022 Fish Hatchery Services
- Place of performance: Mesa, Washington
- County: Franklin County (FIPS 53021). https://abierto.us/counties/franklin-county-wa-53021
- City: Mesa. https://abierto.us/cities/mesa-wa-5345180
- First posted: October 15, 2025
- Last posted: October 15, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/377425162d1247d0bd240466418cc35d/view

## Description

This is a special notice prepared in accordance with Federal Acquisition Regulation (FAR) 5.2 “Synopses of Proposed Contract Actions.” The Army Corps of Engineers intends to negotiate the sole-source award of a new contract with the Washington Department of Fish and Wildlife (WDFW), a State of Washington agency. Work includes support and production of fall Chinook salmon production within the Hanford Reach stretch of the Columbia River at Ringold Springs Hatchery (RSH).

This fish production satisfies a portion of USACE’s mission in fulfilling mitigation obligations for The Dalles and John Day Dams. Pursuant to 10 U.S.C. § 2304(c)(1), as implemented by Federal Acquisition Regulation (FAR) 6.302-1 and the Defense Federal Acquisition Regulation (DFARS) 206.302-1, only one responsible source and no other vendor will satisfy agency requirements.

In 2008, the National Marine Fisheries Service (NMFS) issued a revised Biological Opinion that concluded that the Federal Columbia River Power System jeopardizes the continued existence of various Endangered Species Act-listed anadromous fish in the Columbia River Basin. Jeopardy and adverse modification may be avoided by implementing reasonable and prudent alternatives (RPAs) composed of discrete actions covering, among other things, hatchery operations.

RPA action number 40 calls for a review of the hatchery program associated with the mitigation for The Dalles and John Day Dams. The RSH Complex is situated just downstream of the Hanford Reach on the Columbia River. This complex also provides for collection of broodstock that originate from the Hanford Reach and provides a way to differentiate between species and hatchery-origin and natural-origin fish. No other facility is available on the Hanford Reach to provide this product.

Likewise, RSH possesses the appropriate water temperature, rearing pond space and availability during the required months to acclimate and release fall Chinook juveniles in the Columbia River. No other acclimation and release facilities exist on the Hanford Reach of the Columbia River that are capable of handling the required volume of juvenile fish. Regional fisheries experts from NMFS, WDFW, and the USACE agree that the Ringold Hatchery Acclimation Pond is the only reasonable location to continue this activity.

United States v. Oregon parties, USACE Portland District and Northwest Division agreement to release fall Chinook in the Columbia River mandates this requirement. WDFW has unique ownership and/or use rights to RSH, thus making WDFW the only source able to provide the fall Chinook production needed. A SOLICITATION WILL NOT BE POSTED. THIS NOTICE IS NOT A REQUEST FOR COMPETITIVE PROPOSALS OR QUOTATIONS. All responsible sources may submit a capability statement to the contracting officer before the notice end date.

If no affirmative written responses are received by 2:00 PM Pacific Time on Thursday, 30 October 2025, the Contracting Officer will proceed with the sole source action. Oral communications are not acceptable in response to this notice. A determination by the Government not to compete this proposed requirement is solely within the discretion of the Government. Please limit responses to allow the Government to determine interested parties, socioeconomic status availability, and capabilities.

The Government intends to use responses to make an appropriate acquisition decision for this project. Electronic responses and questions shall be submitted via email to all POCs listed, below. The U.S. Army Corps of Engineers is not responsible for any costs incurred by responding to this notice.

**Contracting Office Address:**

**US Army Corps of Engineers, Portland District ATTN:** CECT-NWP-P 333 SW 1st Avenue Portland, OR 97204 Points of Contact for this notice:

**Email:** Rattiya.P.Oaks@usace.army.mil Justin.F.Figueredo@usace.army.mil

## Publications

- October 15, 2025: Special notice, due October 30, 2025 at 5:00 PM EDT. Notice 377425162d1247d0bd240466418cc35d. https://sam.gov/workspace/contract/opp/377425162d1247d0bd240466418cc35d/view

## Points of contact

- Rattiya Oaks, rattiya.p.oaks@usace.army.mil, 5038084438
- Justin Figueredo, Justin.F.Figueredo@usace.army.mil

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/w9127n26ra0007.