{"canonical":"https://abierto.us/opportunities/w9123823b0013","key":"W9123823B0013","url":"https://abierto.us/opportunities/w9123823b0013","title":"Lower American River (LAR) 3A","solicitation_number":"W9123823B0013","notice_type":"a","open":false,"response_deadline":"2024-04-23T18:00:00Z","first_posted":"2024-01-16","last_posted":"2024-05-29","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"W075 ENDIST SACRAMENTO","naics":"237990","psc":"Y1LC","set_aside":"SBA","place_state":"CA","place_county":"06067","place_county_name":"Sacramento County","place_city":"0664000","place_city_name":"Sacramento","winner":"AHTNA-FORGEN JV, LLC","award_amount":"11570320.00","publications":[{"notice_id":"58f2ef2a88184ba6aba391a7e8dfe965","title":"USACE SPK – DBB – American River Common Features (ARCF), Erosion Lower American River (LAR) Site 1-1 (Contract 3A) – Sacramento, CA","solicitation_number":"W9123823B0013","notice_type":"p","base_type":"p","posted":"2024-01-16","posted_at":null,"due_at":"2023-01-31T16:00:00Z","due_date":"2023-01-31","cancelled":null,"archived":null,"archive_date":"2023-02-15","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/58f2ef2a88184ba6aba391a7e8dfe965/view","enriched":false,"history":[]},{"notice_id":"fb666bbc5b85462b85fff6b25541bb51","title":"USACE SPK – DBB – American River Common Features (ARCF), Erosion Lower American River (LAR) Site 1-1 (Contract 3A) – Sacramento, CA","solicitation_number":"W9123823B0013","notice_type":"p","base_type":"p","posted":"2024-01-16","posted_at":null,"due_at":"2023-01-31T16:00:00Z","due_date":"2023-01-31","cancelled":null,"archived":null,"archive_date":"2023-02-15","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/fb666bbc5b85462b85fff6b25541bb51/view","enriched":false,"history":[]},{"notice_id":"f349ee20b4bc46d19760a5e7e0259a81","title":"USACE SPK – DBB – American River Common Features (ARCF), Erosion Lower American River (LAR) Site 1-1 (Contract 3A) – Sacramento, CA","solicitation_number":"W9123823B0013","notice_type":"p","base_type":"p","posted":"2024-01-19","posted_at":null,"due_at":"2023-01-31T16:00:00Z","due_date":"2023-01-31","cancelled":null,"archived":null,"archive_date":"2023-02-15","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/f349ee20b4bc46d19760a5e7e0259a81/view","enriched":false,"history":[]},{"notice_id":"87878e717c774a018ad8fb22a826e31a","title":"USACE SPK – DBB – American River Common Features (ARCF), Erosion Lower American River (LAR) Site 1-1 (Contract 3A) – Sacramento, CA","solicitation_number":"W9123823B0013","notice_type":"p","base_type":"p","posted":"2024-01-26","posted_at":null,"due_at":"2024-01-31T16:00:00Z","due_date":"2024-01-31","cancelled":null,"archived":null,"archive_date":"2024-02-15","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/87878e717c774a018ad8fb22a826e31a/view","enriched":false,"history":[]},{"notice_id":"72f755d13bca4ea4a3576e8b03bde329","title":"USACE SPK – DBB – American River Common Features (ARCF), Erosion Lower American River (LAR) Site 1-1 (Contract 3A) – Sacramento, CA","solicitation_number":"W9123823B0013","notice_type":"p","base_type":"p","posted":"2024-03-01","posted_at":null,"due_at":"2024-04-03T21:00:00Z","due_date":"2024-04-03","cancelled":null,"archived":null,"archive_date":"2024-04-18","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/72f755d13bca4ea4a3576e8b03bde329/view","enriched":false,"history":[]},{"notice_id":"15b8c938c73c484d8d99f542a1efa685","title":"Lower American River (LAR) 3A","solicitation_number":"W9123823B0013","notice_type":"o","base_type":"o","posted":"2024-03-04","posted_at":null,"due_at":"2024-04-01T09:00:00Z","due_date":"2024-04-01","cancelled":null,"archived":null,"archive_date":"2025-03-05","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/15b8c938c73c484d8d99f542a1efa685/view","enriched":false,"history":[]},{"notice_id":"8105d6f178924cd78671c1982b3de355","title":"Lower American River (LAR) 3A","solicitation_number":"W9123823B0013","notice_type":"o","base_type":"o","posted":"2024-03-20","posted_at":null,"due_at":"2024-04-04T09:00:00Z","due_date":"2024-04-04","cancelled":null,"archived":null,"archive_date":"2025-03-20","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/8105d6f178924cd78671c1982b3de355/view","enriched":false,"history":[]},{"notice_id":"a9df2a1f013340728d69fac063671efb","title":"Lower American River (LAR) 3A","solicitation_number":"W9123823B0013","notice_type":"o","base_type":"o","posted":"2024-03-29","posted_at":null,"due_at":"2024-04-16T18:00:00Z","due_date":"2024-04-16","cancelled":null,"archived":null,"archive_date":"2025-03-29","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a9df2a1f013340728d69fac063671efb/view","enriched":false,"history":[]},{"notice_id":"0a7af47c848b44b7836ab201f1256e0f","title":"Lower American River (LAR) 3A","solicitation_number":"W9123823B0013","notice_type":"o","base_type":"o","posted":"2024-04-12","posted_at":null,"due_at":"2024-04-23T18:00:00Z","due_date":"2024-04-23","cancelled":null,"archived":null,"archive_date":"2024-05-23","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/0a7af47c848b44b7836ab201f1256e0f/view","enriched":false,"history":[]},{"notice_id":"607f3e840dc94747bf862e7e3385f0ec","title":"Lower American River (LAR) 3A","solicitation_number":"W9123823B0013","notice_type":"o","base_type":"o","posted":"2024-04-12","posted_at":null,"due_at":"2024-04-16T18:00:00Z","due_date":"2024-04-16","cancelled":null,"archived":null,"archive_date":"2025-04-12","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/607f3e840dc94747bf862e7e3385f0ec/view","enriched":false,"history":[]},{"notice_id":"2158dea12cb6464384e4e51c38242841","title":"Lower American River (LAR) 3A","solicitation_number":"W9123823B0013","notice_type":"o","base_type":"o","posted":"2024-04-25","posted_at":null,"due_at":"2024-04-23T18:00:00Z","due_date":"2024-04-23","cancelled":null,"archived":null,"archive_date":"2024-05-23","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/2158dea12cb6464384e4e51c38242841/view","enriched":false,"history":[]},{"notice_id":"0537732e14164dc19ff00e82ada27960","title":"Lower American River (LAR) 3A","solicitation_number":"W9123824C0014","notice_type":"a","base_type":"o","posted":"2024-05-29","posted_at":null,"due_at":null,"due_date":null,"cancelled":null,"archived":null,"archive_date":"2024-06-13","award_number":"W9123824C0014","awardee_name":"Ahtna-Forgen JV, LLC West Sacramento","amount":"11570320.00","link_sam":"https://sam.gov/workspace/contract/opp/0537732e14164dc19ff00e82ada27960/view","enriched":false,"history":[]}],"latest_notice_id":"0537732e14164dc19ff00e82ada27960","first_type":"p","notices":[{"dates":{"posted":"2024-01-16","response_deadline":{"raw":"2023-01-31T08:00:00-08:00","utc":"2023-01-31T16:00:00Z","date":"2023-01-31","time":"08:00:00","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/58f2ef2a88184ba6aba391a7e8dfe965/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"USACE SPK – DBB – American River Common Features (ARCF), Erosion Lower American River (LAR) Site 1-1 (Contract 3A) – Sacramento, CA","agency":{"office":{"code":"W91238","name":"W075 ENDIST SACRAMENTO"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"95814-2922","city":"SACRAMENTO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2023-02-15","archive_type":"auto15"},"contacts":[{"name":"Thomas, Cochran","role":"primary","email":"thomas.cochran@usace.army.mil","phone":"9165577299"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"58f2ef2a88184ba6aba391a7e8dfe965","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"03e2c2ec2e392f4cd3b00e68e38f0739a00f0f549e7a64c43f3e3479f988e27d","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"The U.S. Army Corps of Engineers (USACE), Sacramento District (SPK), anticipates a potential requirement to perform design-bid-build (DBB) construction services to conduct erosion control measures along site 1-1 of the in support of the American River Common Features (ARCF) Erosion Lower American River (LAR) Site 1-1 project (referred to as contract 3A), which is located on the American River within the American River Parkway in Sacramento, California. Site 1-1 is located on the left bank looking downstream. The site roughly extends from the Union Pacific Railroad (UPRR) Bridge to approximately 1,800-feet upstream of the Interstate 80 Business Bridge. Construction access is anticipated to be from Sutter’s Landing Regional Park to the west and Glenn Hall Park to the east. The primary intent of the project is to reduce the risk of levee failure by erosion during extreme flow events. The project is anticipated to include construction of approximately 2,500 feet of riverbank and river toe erosion protection and stabilization of the existing levee; design is not required. Vegetation clearing (including the removal of select trees to four feet above existing grade) and the transplanting of elderberry shrubs within the project footprint is anticipated to be performed by another Contractor prior to erosion protection and on-site habitat construction activities. The Contractor is anticipated to be required to protect identified vegetation, structures, and utilities, remove stumps, strip & grub the project footprint, install temporary access ramps, and place silt fencing, construction chain link fencing and construction safety fencing along the project footprint, staging areas, and haul routes. After the project site has been prepared, it is anticipated the Contractor will be required to excavate and regrade approximately 3,300 cubic yards of material from the downstream riverbank slope, as well as stockpile suitable excavated material for placement as engineered fill. It is anticipated the Contractor will be required to install soil-filled rock slope protection on the waterside levee face and riverbank, install rock apron protection at two existing stormwater outfalls, place soil and rock to construct river toe protection and planting bench features, tie-in erosion protection elements to existing rock revetment features, place instream wood structures on the planting benches, and provide temporary erosion control for stabilization of disturbed soil areas. It is anticipated that about 2,500 feet of the site will require working in the active channel of the American River to place material with associated turbidity control. It is anticipated the project will require import and placement of approximately 36,000 tons of Federal Highway Administration (FHWA) Class I riprap, 30 tons of FHWA Class II riprap, 750 tons of FHWA Class VI riprap; 6,400 tons of FHWA Subbase A bedding, 100 tons of B4 bedding; 9,500 cubic yards of FHWA Class I soil-filled rock; 4,600 cubic yards of topsoil, 7,000 cubic yards of soil fill; 145 trees (for instream wood structures), and 1,350 live cuttings to be planted on-site. It is estimated that construction of the potential requirement can be completed within 380 calendar days. The potential requirement may result in a solicitation issued approximately 31 JAN 2024. If solicited, the Government intends to award the contemplated requirement as a firm-fixed-price contract by approximately 31 MAY 2024. In accordance with Defense Federal Acquisition Regulation DFARS 236.204(i) between $10,000,000 and $25,000,000. The North American Industrial Classification System (NAICS) code for the potential requirement is anticipated to be 237990, Other Heavy and Civil Engineering Construction. The small business size standard for this NAICS, as established by the U.S. Small Business Administration, is $39,500,000 annual revenue. The Product Service Code for the potential requirement is anticipated to be Y1PC – Construction of Unimproved Real Property (Land). If the Government intends to conduct a pre-bid conference and/or site visit, the date, time, location, and access requirements will be identified in the solicitation. Please DO NOT request an updated schedule if the estimated dates are surpassed; the Government will release all information publicly on SAM.gov when available, and requests for an updated posting schedule may be ignored. Please DO NOT request a copy of the solicitation, or draft plans and specifications, as they are not currently available. Any available technical data required to respond to the solicitation will be furnished as part of the solicitation. Following solicitation release, all responsible sources may submit a bid that shall be considered by the agency. This project and/or the anticipated solicitation may be changed, delayed, or canceled at any time. All prospective Offerors and their Subcontractors must be registered in the System for Award Management (SAM - www.SAM.gov) and the Procurement Integrated Enterprise Environment (PIEE) website to be able to download solicitation information. Solicitation documents, plans, and specifications are only available to be download from PIEE, which may be accessed at https://wawf.eb.mil OR https://piee.eb.mil. Registration should be completed one (1) week prior to the anticipated solicitation release date. USACE will not notify Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments. Copies of the solicitation and the solicited plans and specifications will be made available for inspection without charge after the solicitation is released, when accessed through PIEE. The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov; Contractors are responsible for identifying their entity as an interested vendor and contacting other interested vendors. USACE SPK will not review capabilities statements submitted in response to this Synopsis or coordinate partnering arrangements between parties. Contractors","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"W9123823B0013","place_of_performance":{"zip":"95833","city":{"name":"Sacramento"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Y1PC"},{"dates":{"posted":"2024-01-16","response_deadline":{"raw":"2023-01-31T08:00:00-08:00","utc":"2023-01-31T16:00:00Z","date":"2023-01-31","time":"08:00:00","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/fb666bbc5b85462b85fff6b25541bb51/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"USACE SPK – DBB – American River Common Features (ARCF), Erosion Lower American River (LAR) Site 1-1 (Contract 3A) – Sacramento, CA","agency":{"office":{"code":"W91238","name":"W075 ENDIST SACRAMENTO"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"95814-2922","city":"SACRAMENTO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2023-02-15","archive_type":"auto15"},"contacts":[{"name":"Uriel Ramirez","role":"primary","email":"uriel.ramirez@usace.army.mil"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"fb666bbc5b85462b85fff6b25541bb51","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"0adfa42d02f362ab867afda9a2887b48cfbd5347af88c024c26657bcb08e9687","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"The U.S. Army Corps of Engineers (USACE), Sacramento District (SPK), anticipates a potential requirement to perform design-bid-build (DBB) construction services to conduct erosion control measures along site 1-1 of the in support of the American River Common Features (ARCF) Erosion Lower American River (LAR) Site 1-1 project (referred to as contract 3A), which is located on the American River within the American River Parkway in Sacramento, California. Site 1-1 is located on the left bank looking downstream. The site roughly extends from the Union Pacific Railroad (UPRR) Bridge to approximately 1,800-feet upstream of the Interstate 80 Business Bridge. Construction access is anticipated to be from Sutter’s Landing Regional Park to the west and Glenn Hall Park to the east. The primary intent of the project is to reduce the risk of levee failure by erosion during extreme flow events. The project is anticipated to include construction of approximately 2,500 feet of riverbank and river toe erosion protection and stabilization of the existing levee; design is not required. Vegetation clearing (including the removal of select trees to four feet above existing grade) and the transplanting of elderberry shrubs within the project footprint is anticipated to be performed by another Contractor prior to erosion protection and on-site habitat construction activities. The Contractor is anticipated to be required to protect identified vegetation, structures, and utilities, remove stumps, strip & grub the project footprint, install temporary access ramps, and place silt fencing, construction chain link fencing and construction safety fencing along the project footprint, staging areas, and haul routes. After the project site has been prepared, it is anticipated the Contractor will be required to excavate and regrade approximately 3,300 cubic yards of material from the downstream riverbank slope, as well as stockpile suitable excavated material for placement as engineered fill. It is anticipated the Contractor will be required to install soil-filled rock slope protection on the waterside levee face and riverbank, install rock apron protection at two existing stormwater outfalls, place soil and rock to construct river toe protection and planting bench features, tie-in erosion protection elements to existing rock revetment features, place instream wood structures on the planting benches, and provide temporary erosion control for stabilization of disturbed soil areas. It is anticipated that about 2,500 feet of the site will require working in the active channel of the American River to place material with associated turbidity control. It is anticipated the project will require import and placement of approximately 36,000 tons of Federal Highway Administration (FHWA) Class I riprap, 30 tons of FHWA Class II riprap, 750 tons of FHWA Class VI riprap; 6,400 tons of FHWA Subbase A bedding, 100 tons of B4 bedding; 9,500 cubic yards of FHWA Class I soil-filled rock; 4,600 cubic yards of topsoil, 7,000 cubic yards of soil fill; 145 trees (for instream wood structures), and 1,350 live cuttings to be planted on-site. It is estimated that construction of the potential requirement can be completed within 380 calendar days. The potential requirement may result in a solicitation issued approximately 25 April 2023. If solicited, the Government intends to award the contemplated requirement as a firm-fixed-price contract by approximately 21 July 2023. In accordance with Defense Federal Acquisition Regulation DFARS 236.204(i) between $10,000,000 and $25,000,000. The North American Industrial Classification System (NAICS) code for the potential requirement is anticipated to be 237990, Other Heavy and Civil Engineering Construction. The small business size standard for this NAICS, as established by the U.S. Small Business Administration, is $39,500,000 annual revenue. The Product Service Code for the potential requirement is anticipated to be Y1PC – Construction of Unimproved Real Property (Land). If the Government intends to conduct a pre-bid conference and/or site visit, the date, time, location, and access requirements will be identified in the solicitation. Please DO NOT request an updated schedule if the estimated dates are surpassed; the Government will release all information publicly on SAM.gov when available, and requests for an updated posting schedule may be ignored. Please DO NOT request a copy of the solicitation, or draft plans and specifications, as they are not currently available. Any available technical data required to respond to the solicitation will be furnished as part of the solicitation. Following solicitation release, all responsible sources may submit a bid that shall be considered by the agency. This project and/or the anticipated solicitation may be changed, delayed, or canceled at any time. All prospective Offerors and their Subcontractors must be registered in the System for Award Management (SAM - www.SAM.gov) and the Procurement Integrated Enterprise Environment (PIEE) website to be able to download solicitation information. Solicitation documents, plans, and specifications are only available to be download from PIEE, which may be accessed at https://wawf.eb.mil OR https://piee.eb.mil. Registration should be completed one (1) week prior to the anticipated solicitation release date. USACE will not notify Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments. Copies of the solicitation and the solicited plans and specifications will be made available for inspection without charge after the solicitation is released, when accessed through PIEE. The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov; Contractors are responsible for identifying their entity as an interested vendor and contacting other interested vendors. USACE SPK will not review capabilities statements submitted in response to this Synopsis or coordinate partnering arrangements between parties. Contractors should check SAM.gov frequently for changes to the interested vendors list and this Notice.","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"W9123823B0013","place_of_performance":{"zip":"95833","city":{"name":"Sacramento"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Y1PC"},{"dates":{"posted":"2024-01-19","response_deadline":{"raw":"2023-01-31T08:00:00-08:00","utc":"2023-01-31T16:00:00Z","date":"2023-01-31","time":"08:00:00","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/f349ee20b4bc46d19760a5e7e0259a81/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"USACE SPK – DBB – American River Common Features (ARCF), Erosion Lower American River (LAR) Site 1-1 (Contract 3A) – Sacramento, CA","agency":{"office":{"code":"W91238","name":"W075 ENDIST SACRAMENTO"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"95814-2922","city":"SACRAMENTO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2023-02-15","archive_type":"auto15"},"contacts":[{"name":"Thomas, Cochran","role":"primary","email":"thomas.cochran@usace.army.mil","phone":"9165577299"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"f349ee20b4bc46d19760a5e7e0259a81","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"0f39b90488361a243650bdd5a2f5db8419e7a42721395c954686190dccc4b444","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"The U.S. Army Corps of Engineers (USACE), Sacramento District (SPK), anticipates a potential requirement to perform design-bid-build (DBB) construction services to conduct erosion control measures along site 1-1 of the in support of the American River Common Features (ARCF) Erosion Lower American River (LAR) Site 1-1 project (referred to as contract 3A), which is located on the American River within the American River Parkway in Sacramento, California. Site 1-1 is located on the left bank looking downstream. The site roughly extends from the Union Pacific Railroad (UPRR) Bridge to approximately 1,800-feet upstream of the Interstate 80 Business Bridge. Construction access is anticipated to be from Sutter’s Landing Regional Park to the west and Glenn Hall Park to the east. The primary intent of the project is to reduce the risk of levee failure by erosion during extreme flow events. The project is anticipated to include construction of approximately 2,500 feet of riverbank and river toe erosion protection and stabilization of the existing levee; design is not required. Vegetation clearing (including the removal of select trees to four feet above existing grade) and the transplanting of elderberry shrubs within the project footprint is anticipated to be performed by another Contractor prior to erosion protection and on-site habitat construction activities. The Contractor is anticipated to be required to protect identified vegetation, structures, and utilities, remove stumps, strip & grub the project footprint, install temporary access ramps, and place silt fencing, construction chain link fencing and construction safety fencing along the project footprint, staging areas, and haul routes. After the project site has been prepared, it is anticipated the Contractor will be required to excavate and regrade approximately 3,300 cubic yards of material from the downstream riverbank slope, as well as stockpile suitable excavated material for placement as engineered fill. It is anticipated the Contractor will be required to install soil-filled rock slope protection on the waterside levee face and riverbank, install rock apron protection at two existing stormwater outfalls, place soil and rock to construct river toe protection and planting bench features, tie-in erosion protection elements to existing rock revetment features, place instream wood structures on the planting benches, and provide temporary erosion control for stabilization of disturbed soil areas. It is anticipated that about 2,500 feet of the site will require working in the active channel of the American River to place material with associated turbidity control. It is anticipated the project will require import and placement of approximately 36,000 tons of Federal Highway Administration (FHWA) Class I riprap, 30 tons of FHWA Class II riprap, 750 tons of FHWA Class VI riprap; 6,400 tons of FHWA Subbase A bedding, 100 tons of B4 bedding; 9,500 cubic yards of FHWA Class I soil-filled rock; 4,600 cubic yards of topsoil, 7,000 cubic yards of soil fill; 145 trees (for instream wood structures), and 1,350 live cuttings to be planted on-site. It is estimated that construction of the potential requirement can be completed within 380 calendar days. The potential requirement may result in a solicitation issued approximately 31 JAN 2024. If solicited, the Government intends to award the contemplated requirement as a firm-fixed-price contract by approximately 31 MAY 2024. In accordance with Defense Federal Acquisition Regulation DFARS 236.204(i) between $10,000,000 and $25,000,000. The North American Industrial Classification System (NAICS) code for the potential requirement is anticipated to be 237990, Other Heavy and Civil Engineering Construction. The small business size standard for this NAICS, as established by the U.S. Small Business Administration, is $39,500,000 annual revenue. The Product Service Code for the potential requirement is anticipated to be Y1PC – Construction of Unimproved Real Property (Land). If the Government intends to conduct a pre-bid conference and/or site visit, the date, time, location, and access requirements will be identified in the solicitation. Please DO NOT request an updated schedule if the estimated dates are surpassed; the Government will release all information publicly on SAM.gov when available, and requests for an updated posting schedule may be ignored. Please DO NOT request a copy of the solicitation, or draft plans and specifications, as they are not currently available. Any available technical data required to respond to the solicitation will be furnished as part of the solicitation. Following solicitation release, all responsible sources may submit a bid that shall be considered by the agency. This project and/or the anticipated solicitation may be changed, delayed, or canceled at any time. All prospective Offerors and their Subcontractors must be registered in the System for Award Management (SAM - www.SAM.gov) and the Procurement Integrated Enterprise Environment (PIEE) website to be able to download solicitation information. Solicitation documents, plans, and specifications are only available to be download from PIEE, which may be accessed at https://wawf.eb.mil OR https://piee.eb.mil. Registration should be completed one (1) week prior to the anticipated solicitation release date. USACE will not notify Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments. Copies of the solicitation and the solicited plans and specifications will be made available for inspection without charge after the solicitation is released, when accessed through PIEE. The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov; Contractors are responsible for identifying their entity as an interested vendor and contacting other interested vendors. USACE SPK will not review capabilities statements submitted in response to this Synopsis or coordinate partnering arrangements between parties. Contractors","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"W9123823B0013","place_of_performance":{"zip":"95833","city":{"name":"Sacramento"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Y1PC"},{"dates":{"posted":"2024-01-26","response_deadline":{"raw":"2024-01-31T08:00:00-08:00","utc":"2024-01-31T16:00:00Z","date":"2024-01-31","time":"08:00:00","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/87878e717c774a018ad8fb22a826e31a/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"USACE SPK – DBB – American River Common Features (ARCF), Erosion Lower American River (LAR) Site 1-1 (Contract 3A) – Sacramento, CA","agency":{"office":{"code":"W91238","name":"W075 ENDIST SACRAMENTO"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"95814-2922","city":"SACRAMENTO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-02-15","archive_type":"auto15"},"contacts":[{"name":"Thomas, Cochran","role":"primary","email":"thomas.cochran@usace.army.mil","phone":"9165577299"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"87878e717c774a018ad8fb22a826e31a","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"80a9bb4e5035c5b055e9a31040da9d199a7f2d089c674008c8645efa60c111ee","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"The U.S. Army Corps of Engineers (USACE), Sacramento District (SPK), anticipates a potential requirement to perform design-bid-build (DBB) construction services to conduct erosion control measures along site 1-1 of the in support of the American River Common Features (ARCF) Erosion Lower American River (LAR) Site 1-1 project (referred to as contract 3A), which is located on the American River within the American River Parkway in Sacramento, California. Site 1-1 is located on the left bank looking downstream. The site roughly extends from the Union Pacific Railroad (UPRR) Bridge to approximately 1,800-feet upstream of the Interstate 80 Business Bridge. Construction access is anticipated to be from Sutter’s Landing Regional Park to the west and Glenn Hall Park to the east. The primary intent of the project is to reduce the risk of levee failure by erosion during extreme flow events. The project is anticipated to include construction of approximately 2,500 feet of riverbank and river toe erosion protection and stabilization of the existing levee; design is not required. Vegetation clearing (including the removal of select trees to four feet above existing grade) and the transplanting of elderberry shrubs within the project footprint is anticipated to be performed by another Contractor prior to erosion protection and on-site habitat construction activities. The Contractor is anticipated to be required to protect identified vegetation, structures, and utilities, remove stumps, strip & grub the project footprint, install temporary access ramps, and place silt fencing, construction chain link fencing and construction safety fencing along the project footprint, staging areas, and haul routes. After the project site has been prepared, it is anticipated the Contractor will be required to excavate and regrade approximately 3,300 cubic yards of material from the downstream riverbank slope, as well as stockpile suitable excavated material for placement as engineered fill. It is anticipated the Contractor will be required to install soil-filled rock slope protection on the waterside levee face and riverbank, install rock apron protection at two existing stormwater outfalls, place soil and rock to construct river toe protection and planting bench features, tie-in erosion protection elements to existing rock revetment features, place instream wood structures on the planting benches, and provide temporary erosion control for stabilization of disturbed soil areas. It is anticipated that about 2,500 feet of the site will require working in the active channel of the American River to place material with associated turbidity control. It is anticipated the project will require import and placement of approximately 36,000 tons of Federal Highway Administration (FHWA) Class I riprap, 30 tons of FHWA Class II riprap, 750 tons of FHWA Class VI riprap; 6,400 tons of FHWA Subbase A bedding, 100 tons of B4 bedding; 9,500 cubic yards of FHWA Class I soil-filled rock; 4,600 cubic yards of topsoil, 7,000 cubic yards of soil fill; 145 trees (for instream wood structures), and 1,350 live cuttings to be planted on-site. It is estimated that construction of the potential requirement can be completed within 380 calendar days. The potential requirement may result in a solicitation issued approximately 31 JAN 2024. If solicited, the Government intends to award the contemplated requirement as a firm-fixed-price contract by approximately 31 MAY 2024. In accordance with Defense Federal Acquisition Regulation DFARS 236.204(i) between $10,000,000 and $25,000,000. The North American Industrial Classification System (NAICS) code for the potential requirement is anticipated to be 237990, Other Heavy and Civil Engineering Construction. The small business size standard for this NAICS, as established by the U.S. Small Business Administration, is $39,500,000 annual revenue. The Product Service Code for the potential requirement is anticipated to be Y1PC – Construction of Unimproved Real Property (Land). If the Government intends to conduct a pre-bid conference and/or site visit, the date, time, location, and access requirements will be identified in the solicitation. Please DO NOT request an updated schedule if the estimated dates are surpassed; the Government will release all information publicly on SAM.gov when available, and requests for an updated posting schedule may be ignored. Please DO NOT request a copy of the solicitation, or draft plans and specifications, as they are not currently available. Any available technical data required to respond to the solicitation will be furnished as part of the solicitation. Following solicitation release, all responsible sources may submit a bid that shall be considered by the agency. This project and/or the anticipated solicitation may be changed, delayed, or canceled at any time. All prospective Offerors and their Subcontractors must be registered in the System for Award Management (SAM - www.SAM.gov) and the Procurement Integrated Enterprise Environment (PIEE) website to be able to download solicitation information. Solicitation documents, plans, and specifications are only available to be download from PIEE, which may be accessed at https://wawf.eb.mil OR https://piee.eb.mil. Registration should be completed one (1) week prior to the anticipated solicitation release date. USACE will not notify Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments. Copies of the solicitation and the solicited plans and specifications will be made available for inspection without charge after the solicitation is released, when accessed through PIEE. The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov; Contractors are responsible for identifying their entity as an interested vendor and contacting other interested vendors. USACE SPK will not review capabilities statements submitted in response to this Synopsis or coordinate partnering arrangements between parties. Contractors","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"W9123823B0013","place_of_performance":{"zip":"95833","city":{"name":"Sacramento"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Y1PC"},{"dates":{"posted":"2024-03-01","response_deadline":{"raw":"2024-04-03T14:00:00-07:00","utc":"2024-04-03T21:00:00Z","date":"2024-04-03","time":"14:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/72f755d13bca4ea4a3576e8b03bde329/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"USACE SPK – DBB – American River Common Features (ARCF), Erosion Lower American River (LAR) Site 1-1 (Contract 3A) – Sacramento, CA","agency":{"office":{"code":"W91238","name":"W075 ENDIST SACRAMENTO"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"95814-2922","city":"SACRAMENTO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-04-18","archive_type":"auto15"},"contacts":[{"name":"Thomas, Cochran","role":"primary","email":"thomas.cochran@usace.army.mil","phone":"9165577299"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"72f755d13bca4ea4a3576e8b03bde329","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"00f49504e88c5c30f46ab80fb441d397df9f59a4c0f9e826c72c33afd732c16f","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"The U.S. Army Corps of Engineers (USACE), Sacramento District (SPK), anticipates a potential requirement to perform design-bid-build (DBB) construction services to conduct erosion control measures along site 1-1 of the in support of the American River Common Features (ARCF) Erosion Lower American River (LAR) Site 1-1 project (referred to as contract 3A), which is located on the American River within the American River Parkway in Sacramento, California. Site 1-1 is located on the left bank looking downstream. The site roughly extends from the Union Pacific Railroad (UPRR) Bridge to approximately 1,800-feet upstream of the Interstate 80 Business Bridge. Construction access is anticipated to be from Sutter’s Landing Regional Park to the west and Glenn Hall Park to the east. The primary intent of the project is to reduce the risk of levee failure by erosion during extreme flow events. The project is anticipated to include construction of approximately 2,500 feet of riverbank and river toe erosion protection and stabilization of the existing levee; design is not required. Vegetation clearing (including the removal of select trees to four feet above existing grade) and the transplanting of elderberry shrubs within the project footprint is anticipated to be performed by another Contractor prior to erosion protection and on-site habitat construction activities. The Contractor is anticipated to be required to protect identified vegetation, structures, and utilities, remove stumps, strip & grub the project footprint, install temporary access ramps, and place silt fencing, construction chain link fencing and construction safety fencing along the project footprint, staging areas, and haul routes. After the project site has been prepared, it is anticipated the Contractor will be required to excavate and regrade approximately 3,300 cubic yards of material from the downstream riverbank slope, as well as stockpile suitable excavated material for placement as engineered fill. It is anticipated the Contractor will be required to install soil-filled rock slope protection on the waterside levee face and riverbank, install rock apron protection at two existing stormwater outfalls, place soil and rock to construct river toe protection and planting bench features, tie-in erosion protection elements to existing rock revetment features, place instream wood structures on the planting benches, and provide temporary erosion control for stabilization of disturbed soil areas. It is anticipated that about 2,500 feet of the site will require working in the active channel of the American River to place material with associated turbidity control. It is anticipated the project will require import and placement of approximately 36,000 tons of Federal Highway Administration (FHWA) Class I riprap, 30 tons of FHWA Class II riprap, 750 tons of FHWA Class VI riprap; 6,400 tons of FHWA Subbase A bedding, 100 tons of B4 bedding; 9,500 cubic yards of FHWA Class I soil-filled rock; 4,600 cubic yards of topsoil, 7,000 cubic yards of soil fill; 145 trees (for instream wood structures), and 1,350 live cuttings to be planted on-site. It is estimated that construction of the potential requirement can be completed within 380 calendar days. The potential requirement may result in a solicitation issued approximately 31 JAN 2024. If solicited, the Government intends to award the contemplated requirement as a firm-fixed-price contract by approximately 31 MAY 2024. In accordance with Defense Federal Acquisition Regulation DFARS 236.204(i) between $10,000,000 and $25,000,000. The North American Industrial Classification System (NAICS) code for the potential requirement is anticipated to be 237990, Other Heavy and Civil Engineering Construction. The small business size standard for this NAICS, as established by the U.S. Small Business Administration, is $39,500,000 annual revenue. The Product Service Code for the potential requirement is anticipated to be Y1PC – Construction of Unimproved Real Property (Land). If the Government intends to conduct a pre-bid conference and/or site visit, the date, time, location, and access requirements will be identified in the solicitation. Please DO NOT request an updated schedule if the estimated dates are surpassed; the Government will release all information publicly on SAM.gov when available, and requests for an updated posting schedule may be ignored. Please DO NOT request a copy of the solicitation, or draft plans and specifications, as they are not currently available. Any available technical data required to respond to the solicitation will be furnished as part of the solicitation. Following solicitation release, all responsible sources may submit a bid that shall be considered by the agency. This project and/or the anticipated solicitation may be changed, delayed, or canceled at any time. All prospective Offerors and their Subcontractors must be registered in the System for Award Management (SAM - www.SAM.gov) and the Procurement Integrated Enterprise Environment (PIEE) website to be able to download solicitation information. Solicitation documents, plans, and specifications are only available to be download from PIEE, which may be accessed at https://wawf.eb.mil OR https://piee.eb.mil. Registration should be completed one (1) week prior to the anticipated solicitation release date. USACE will not notify Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments. Copies of the solicitation and the solicited plans and specifications will be made available for inspection without charge after the solicitation is released, when accessed through PIEE. The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov; Contractors are responsible for identifying their entity as an interested vendor and contacting other interested vendors. USACE SPK will not review capabilities statements submitted in response to this Synopsis or coordinate partnering arrangements between parties. Contractors","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"W9123823B0013","place_of_performance":{"zip":"95833","city":{"name":"Sacramento"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Y1PC"},{"dates":{"posted":"2024-03-04","response_deadline":{"raw":"2024-04-01T02:00:00-07:00","utc":"2024-04-01T09:00:00Z","date":"2024-04-01","time":"02:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/15b8c938c73c484d8d99f542a1efa685/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Lower American River (LAR) 3A","agency":{"office":{"code":"W91238","name":"W075 ENDIST SACRAMENTO"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"95814-2922","city":"SACRAMENTO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-03-05","archive_type":"auto_custom"},"contacts":[{"name":"Thomas Cochran","role":"primary","email":"thomas.cochran@usace.army.mil","phone":"9165577299"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"15b8c938c73c484d8d99f542a1efa685","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"ea534c31aeb06f055ff860214be43bdfeacd9c171de4dfcef878c682a2822205","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"This will be a set-aside for Small Business. SBA Size Standard: $45 million The U.S. Army Corps of Engineers (USACE) Sacramento District (SPK) requires to construction services to conduct erosion control and strengthen the levee protecting the city of Sacramento, California. In accordance with DFARS 236.204(i), the Government currently estimates the magnitude of construction for this project to be between $10,000,000 and $25,000,000. This solicitation will use PSC: Y1LC, Construction of Tunnels and Subsurface Structures and NAICS Code: 237990, Other Heavy and Civil Engineering Construction. Offerors must use contractors from the Pre-Qualified Sources List (PSL) for American River Common Features (ARCF) 2016 Sacramento River and American River Erosion Construction Contracts updated 27 September 2023 via Special Notice Posting (W9123823S0046) on SAM.gov. The government is presently lacking Caltrans EP real estate to support construction, however the government is optimistic the interests will be acquired before the date and time that receipt of proposals are due but there is some risk that the interests may not be acquired in time which would prevent the receipt and opening of proposals which in turn would preclude a contract award. The American River Common Features (ARCF) Erosion- Lower American River Site 1-1, Contract 3A project is located on the American River within the American River Parkway in Sacramento, California. Site 1-1 is located on the left bank looking downstream. The site roughly extends from the Union Pacific Railroad Bridge to approximately 1,800-feet upstream of the Interstate 80 Business Bridge. Construction access will be from Sutters Landing Regional Park to the west and Glenn Hall Park to the east. The primary intent of the project is to reduce the risk of levee failure by erosion during extreme flow events. The work includes approximately 2,500 feet of riverbank and river toe erosion protection and stabilization of the existing levee to protect critical infrastructure against the effects of erosion during large flood events. Build only, no design. Vegetation clearing (including the removal of select trees to four feet above existing grade) and the transplanting of elderberry shrubs within the project footprint will be performed by others prior to erosion protection and on-site habitat construction activities. The Contractor will be required to protect identified vegetation, structures, and utilities, remove stumps, strip and grub the project footprint, install temporary access ramps, and place silt fencing, construction chain link fencing and construction safety fencing along the project footprint, staging areas, and haul routes. After the project site has been prepared, the Contractor will excavate and regrade approximately 3,300 cubic yards of material from the downstream riverbank slope, as well as stockpile suitable excavated material for placement as engineered fill. The Contractor will install soil-filled rock slope protection on the waterside levee face and riverbank, install rock apron protection at two existing stormwater outfalls, place soil and rock to construct river toe protection and planting bench features, tie-in erosion protection elements to existing rock revetment features, place instream wood structures on the planting benches, and provide temporary erosion control for stabilization of disturbed soil areas. About 2,500 feet of the site will require working in the active channel of the American River to place material with associated turbidity control. The project will require import and placement of approximately 36,000 tons of FHWA Class I riprap, 30 tons of FHWA Class II riprap, 750 tons of FHWA Class VI riprap; 6,400 tons of FHWA Subbase A bedding, 100 tons of B4 bedding; 9,500 cubic yards of FHWA Class I soil-filled rock; 4,600 cubic yards of topsoil, 7,000 cubic yards of soil fill; 145 trees (for instream wood structures), and 1350 live cuttings to be planted on-site. The work is to be completed in late spring, summer, and fall of 2023 with an estimated Period of Performance of 380 days. The Contract award is expected by mid-January 2023. In-water work is limited to the period of July 1, 2023 to October 31, 2023. All erosion protection and heavy on-site habitat mitigation work must be complete by December 2023. The contractor must coordinate activities with Caltrans Capital City Bridge Widening Project and the City Two River Trails Project staff and contractor planned to occur near the Site 1-1 project footprint and within a similar construction timeframe. A separate site revegetation contract is planned for Spring of 2024.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9123823B0013","product_service_code":"Y1LC"},{"dates":{"posted":"2024-03-20","response_deadline":{"raw":"2024-04-04T02:00:00-07:00","utc":"2024-04-04T09:00:00Z","date":"2024-04-04","time":"02:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/8105d6f178924cd78671c1982b3de355/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Lower American River (LAR) 3A","agency":{"office":{"code":"W91238","name":"W075 ENDIST SACRAMENTO"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"95814-2922","city":"SACRAMENTO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-03-20","archive_type":"auto_custom"},"contacts":[{"name":"Thomas Cochran","role":"primary","email":"thomas.cochran@usace.army.mil","phone":"9165577299"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"8105d6f178924cd78671c1982b3de355","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"70ab22e3a6ddea4b6120e05d15bdacd219dcd14540584698ad30ddd9bc1eef67","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"**W9123823B0013 Amendment 0001 - See W9123823B0013-0001 Block 14 for a description of amendment changes**This will be a set-aside for Small Business. SBA Size Standard: $45 million The U.S. Army Corps of Engineers (USACE) Sacramento District (SPK) requires to construction services to conduct erosion control and strengthen the levee protecting the city of Sacramento, California. In accordance with DFARS 236.204(i), the Government currently estimates the magnitude of construction for this project to be between $10,000,000 and $25,000,000. This solicitation will use PSC: Y1LC, Construction of Tunnels and Subsurface Structures and NAICS Code: 237990, Other Heavy and Civil Engineering Construction. Offerors must use contractors from the Pre-Qualified Sources List (PSL) for American River Common Features (ARCF) 2016 Sacramento River and American River Erosion Construction Contracts updated 27 September 2023 via Special Notice Posting (W9123823S0046) on SAM.gov. The government is presently lacking Caltrans EP real estate to support construction, however the government is optimistic the interests will be acquired before the date and time that receipt of proposals are due but there is some risk that the interests may not be acquired in time which would prevent the receipt and opening of proposals which in turn would preclude a contract award. The American River Common Features (ARCF) Erosion- Lower American River Site 1-1, Contract 3A project is located on the American River within the American River Parkway in Sacramento, California. Site 1-1 is located on the left bank looking downstream. The site roughly extends from the Union Pacific Railroad Bridge to approximately 1,800-feet upstream of the Interstate 80 Business Bridge. Construction access will be from Sutters Landing Regional Park to the west and Glenn Hall Park to the east. The primary intent of the project is to reduce the risk of levee failure by erosion during extreme flow events. The work includes approximately 2,500 feet of riverbank and river toe erosion protection and stabilization of the existing levee to protect critical infrastructure against the effects of erosion during large flood events. Build only, no design. Vegetation clearing (including the removal of select trees to four feet above existing grade) and the transplanting of elderberry shrubs within the project footprint will be performed by others prior to erosion protection and on-site habitat construction activities. The Contractor will be required to protect identified vegetation, structures, and utilities, remove stumps, strip and grub the project footprint, install temporary access ramps, and place silt fencing, construction chain link fencing and construction safety fencing along the project footprint, staging areas, and haul routes. After the project site has been prepared, the Contractor will excavate and regrade approximately 3,300 cubic yards of material from the downstream riverbank slope, as well as stockpile suitable excavated material for placement as engineered fill. The Contractor will install soil-filled rock slope protection on the waterside levee face and riverbank, install rock apron protection at two existing stormwater outfalls, place soil and rock to construct river toe protection and planting bench features, tie-in erosion protection elements to existing rock revetment features, place instream wood structures on the planting benches, and provide temporary erosion control for stabilization of disturbed soil areas. About 2,500 feet of the site will require working in the active channel of the American River to place material with associated turbidity control. The project will require import and placement of approximately 36,000 tons of FHWA Class I riprap, 30 tons of FHWA Class II riprap, 750 tons of FHWA Class VI riprap; 6,400 tons of FHWA Subbase A bedding, 100 tons of B4 bedding; 9,500 cubic yards of FHWA Class I soil-filled rock; 4,600 cubic yards of topsoil, 7,000 cubic yards of soil fill; 145 trees (for instream wood structures), and 1350 live cuttings to be planted on-site. The work is to be completed in late spring, summer, and fall of 2023 with an estimated Period of Performance of 380 days. The Contract award is expected by mid-January 2023. In-water work is limited to the period of July 1, 2023 to October 31, 2023. All erosion protection and heavy on-site habitat mitigation work must be complete by December 2023. The contractor must coordinate activities with Caltrans Capital City Bridge Widening Project and the City Two River Trails Project staff and contractor planned to occur near the Site 1-1 project footprint and within a similar construction timeframe. A separate site revegetation contract is planned for Spring of 2024.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9123823B0013","product_service_code":"Y1LC"},{"dates":{"posted":"2024-03-29","response_deadline":{"raw":"2024-04-16T11:00:00-07:00","utc":"2024-04-16T18:00:00Z","date":"2024-04-16","time":"11:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/a9df2a1f013340728d69fac063671efb/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Lower American River (LAR) 3A","agency":{"office":{"code":"W91238","name":"W075 ENDIST SACRAMENTO"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"95814-2922","city":"SACRAMENTO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-03-29","archive_type":"auto_custom"},"contacts":[{"name":"Thomas Cochran","role":"primary","email":"thomas.cochran@usace.army.mil","phone":"9165577299"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"a9df2a1f013340728d69fac063671efb","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"cc03ce608af6880e5e0d97344b0d6ca12fc24aabeda3712a1f64b6cbedbc4fd5","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"/*\\ W9123823B0013 Amendment 0002 - Block 14 for a description of amendment changes BID submissions are due NLT 16 APR 2024 at 11:00AM PDT and Bid Opening will be at 2:00PM PDT 16 APR 2024. /*\\ **W9123823B0013 Amendment 0001 - See W9123823B0013-0001 Block 14 for a description of amendment changes**This will be a set-aside for Small Business. SBA Size Standard: $45 million The U.S. Army Corps of Engineers (USACE) Sacramento District (SPK) requires to construction services to conduct erosion control and strengthen the levee protecting the city of Sacramento, California. In accordance with DFARS 236.204(i), the Government currently estimates the magnitude of construction for this project to be between $10,000,000 and $25,000,000. This solicitation will use PSC: Y1LC, Construction of Tunnels and Subsurface Structures and NAICS Code: 237990, Other Heavy and Civil Engineering Construction. Offerors must use contractors from the Pre-Qualified Sources List (PSL) for American River Common Features (ARCF) 2016 Sacramento River and American River Erosion Construction Contracts updated 27 September 2023 via Special Notice Posting (W9123823S0046) on SAM.gov. The government is presently lacking Caltrans EP real estate to support construction, however the government is optimistic the interests will be acquired before the date and time that receipt of proposals are due but there is some risk that the interests may not be acquired in time which would prevent the receipt and opening of proposals which in turn would preclude a contract award. The American River Common Features (ARCF) Erosion- Lower American River Site 1-1, Contract 3A project is located on the American River within the American River Parkway in Sacramento, California. Site 1-1 is located on the left bank looking downstream. The site roughly extends from the Union Pacific Railroad Bridge to approximately 1,800-feet upstream of the Interstate 80 Business Bridge. Construction access will be from Sutters Landing Regional Park to the west and Glenn Hall Park to the east. The primary intent of the project is to reduce the risk of levee failure by erosion during extreme flow events. The work includes approximately 2,500 feet of riverbank and river toe erosion protection and stabilization of the existing levee to protect critical infrastructure against the effects of erosion during large flood events. Build only, no design. Vegetation clearing (including the removal of select trees to four feet above existing grade) and the transplanting of elderberry shrubs within the project footprint will be performed by others prior to erosion protection and on-site habitat construction activities. The Contractor will be required to protect identified vegetation, structures, and utilities, remove stumps, strip and grub the project footprint, install temporary access ramps, and place silt fencing, construction chain link fencing and construction safety fencing along the project footprint, staging areas, and haul routes. After the project site has been prepared, the Contractor will excavate and regrade approximately 3,300 cubic yards of material from the downstream riverbank slope, as well as stockpile suitable excavated material for placement as engineered fill. The Contractor will install soil-filled rock slope protection on the waterside levee face and riverbank, install rock apron protection at two existing stormwater outfalls, place soil and rock to construct river toe protection and planting bench features, tie-in erosion protection elements to existing rock revetment features, place instream wood structures on the planting benches, and provide temporary erosion control for stabilization of disturbed soil areas. About 2,500 feet of the site will require working in the active channel of the American River to place material with associated turbidity control. The project will require import and placement of approximately 36,000 tons of FHWA Class I riprap, 30 tons of FHWA Class II riprap, 750 tons of FHWA Class VI riprap; 6,400 tons of FHWA Subbase A bedding, 100 tons of B4 bedding; 9,500 cubic yards of FHWA Class I soil-filled rock; 4,600 cubic yards of topsoil, 7,000 cubic yards of soil fill; 145 trees (for instream wood structures), and 1350 live cuttings to be planted on-site. The work is to be completed in late spring, summer, and fall of 2023 with an estimated Period of Performance of 380 days. The Contract award is expected by mid-January 2023. In-water work is limited to the period of July 1, 2023 to October 31, 2023. All erosion protection and heavy on-site habitat mitigation work must be complete by December 2023. The contractor must coordinate activities with Caltrans Capital City Bridge Widening Project and the City Two River Trails Project staff and contractor planned to occur near the Site 1-1 project footprint and within a similar construction timeframe. A separate site revegetation contract is planned for Spring of 2024.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9123823B0013","product_service_code":"Y1LC"},{"dates":{"posted":"2024-04-12","response_deadline":{"raw":"2024-04-23T11:00:00-07:00","utc":"2024-04-23T18:00:00Z","date":"2024-04-23","time":"11:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/0a7af47c848b44b7836ab201f1256e0f/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Lower American River (LAR) 3A","agency":{"office":{"code":"W91238","name":"W075 ENDIST SACRAMENTO"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"95814-2922","city":"SACRAMENTO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-05-23","archive_type":"auto_custom"},"contacts":[{"name":"Thomas Cochran","role":"primary","email":"thomas.cochran@usace.army.mil","phone":"9165577299"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"0a7af47c848b44b7836ab201f1256e0f","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"dd787a1477791bbecab4143b1a135c57effb05a4ccb0586925648040be5db8ea","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"**Amendment 0004 is a PIEE administrative amendment ONLY to update the PIEE and SAM Response Date and Description for W9123823B0013 Amendment 0003. There is no Solicitation Amendment 0004 for W9123823B0013. **W9123823B0013 Amendment 0003 is issued to 1. Extend the date for submission of bids 2. Change the bid opening date. 3. Update Solicitation section 00 21 13 - Instructions to Bidders. **W9123823B0013 Amendment 0002 - Block 14 for a description of amendment changes BID submissions are due NLT 16 APR 2024 at 11:00AM PDT and Bid Opening will be at 2:00PM PDT 16 APR 2024. **W9123823B0013 Amendment 0001 - See W9123823B0013-0001 Block 14 for a description of amendment changes **This will be a set-aside for Small Business. SBA Size Standard: $45 million The U.S. Army Corps of Engineers (USACE) Sacramento District (SPK) requires to construction services to conduct erosion control and strengthen the levee protecting the city of Sacramento, California. In accordance with DFARS 236.204(i), the Government currently estimates the magnitude of construction for this project to be between $10,000,000 and $25,000,000. This solicitation will use PSC: Y1LC, Construction of Tunnels and Subsurface Structures and NAICS Code: 237990, Other Heavy and Civil Engineering Construction. Offerors must use contractors from the Pre-Qualified Sources List (PSL) for American River Common Features (ARCF) 2016 Sacramento River and American River Erosion Construction Contracts updated 27 September 2023 via Special Notice Posting (W9123823S0046) on SAM.gov. The government is presently lacking Caltrans EP real estate to support construction, however the government is optimistic the interests will be acquired before the date and time that receipt of proposals are due but there is some risk that the interests may not be acquired in time which would prevent the receipt and opening of proposals which in turn would preclude a contract award. The American River Common Features (ARCF) Erosion- Lower American River Site 1-1, Contract 3A project is located on the American River within the American River Parkway in Sacramento, California. Site 1-1 is located on the left bank looking downstream. The site roughly extends from the Union Pacific Railroad Bridge to approximately 1,800-feet upstream of the Interstate 80 Business Bridge. Construction access will be from Sutters Landing Regional Park to the west and Glenn Hall Park to the east. The primary intent of the project is to reduce the risk of levee failure by erosion during extreme flow events. The work includes approximately 2,500 feet of riverbank and river toe erosion protection and stabilization of the existing levee to protect critical infrastructure against the effects of erosion during large flood events. Build only, no design. Vegetation clearing (including the removal of select trees to four feet above existing grade) and the transplanting of elderberry shrubs within the project footprint will be performed by others prior to erosion protection and on-site habitat construction activities. The Contractor will be required to protect identified vegetation, structures, and utilities, remove stumps, strip and grub the project footprint, install temporary access ramps, and place silt fencing, construction chain link fencing and construction safety fencing along the project footprint, staging areas, and haul routes. After the project site has been prepared, the Contractor will excavate and regrade approximately 3,300 cubic yards of material from the downstream riverbank slope, as well as stockpile suitable excavated material for placement as engineered fill. The Contractor will install soil-filled rock slope protection on the waterside levee face and riverbank, install rock apron protection at two existing stormwater outfalls, place soil and rock to construct river toe protection and planting bench features, tie-in erosion protection elements to existing rock revetment features, place instream wood structures on the planting benches, and provide temporary erosion control for stabilization of disturbed soil areas. About 2,500 feet of the site will require working in the active channel of the American River to place material with associated turbidity control. The project will require import and placement of approximately 36,000 tons of FHWA Class I riprap, 30 tons of FHWA Class II riprap, 750 tons of FHWA Class VI riprap; 6,400 tons of FHWA Subbase A bedding, 100 tons of B4 bedding; 9,500 cubic yards of FHWA Class I soil-filled rock; 4,600 cubic yards of topsoil, 7,000 cubic yards of soil fill; 145 trees (for instream wood structures), and 1350 live cuttings to be planted on-site. The work is to be completed in late spring, summer, and fall of 2023 with an estimated Period of Performance of 380 days. The Contract award is expected by mid-January 2023. In-water work is limited to the period of July 1, 2023 to October 31, 2023. All erosion protection and heavy on-site habitat mitigation work must be complete by December 2023. The contractor must coordinate activities with Caltrans Capital City Bridge Widening Project and the City Two River Trails Project staff and contractor planned to occur near the Site 1-1 project footprint and within a similar construction timeframe. A separate site revegetation contract is planned for Spring of 2024.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9123823B0013","product_service_code":"Y1LC"},{"dates":{"posted":"2024-04-12","response_deadline":{"raw":"2024-04-16T11:00:00-07:00","utc":"2024-04-16T18:00:00Z","date":"2024-04-16","time":"11:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/607f3e840dc94747bf862e7e3385f0ec/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Lower American River (LAR) 3A","agency":{"office":{"code":"W91238","name":"W075 ENDIST SACRAMENTO"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"95814-2922","city":"SACRAMENTO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-04-12","archive_type":"auto_custom"},"contacts":[{"name":"Thomas Cochran","role":"primary","email":"thomas.cochran@usace.army.mil","phone":"9165577299"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"607f3e840dc94747bf862e7e3385f0ec","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"d012292796b11adfc164294367fd902bcdbd471f5091a0ce436ba9f89e4db880","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"/*\\ W9123823B0013 Amendment 0003 - Block 14 for a description of amendment changes BID submissions are due NLT 18 APR 2024 at 11:00AM PDT and Bid Opening will be at 2:00PM PDT 18 APR 2024. /*\\ W9123823B0013 Amendment 0002 - Block 14 for a description of amendment changes BID submissions are due NLT 16 APR 2024 at 11:00AM PDT and Bid Opening will be at 2:00PM PDT 16 APR 2024. /*\\ **W9123823B0013 Amendment 0001 - See W9123823B0013-0001 Block 14 for a description of amendment changes**This will be a set-aside for Small Business. SBA Size Standard: $45 million The U.S. Army Corps of Engineers (USACE) Sacramento District (SPK) requires to construction services to conduct erosion control and strengthen the levee protecting the city of Sacramento, California. In accordance with DFARS 236.204(i), the Government currently estimates the magnitude of construction for this project to be between $10,000,000 and $25,000,000. This solicitation will use PSC: Y1LC, Construction of Tunnels and Subsurface Structures and NAICS Code: 237990, Other Heavy and Civil Engineering Construction. Offerors must use contractors from the Pre-Qualified Sources List (PSL) for American River Common Features (ARCF) 2016 Sacramento River and American River Erosion Construction Contracts updated 27 September 2023 via Special Notice Posting (W9123823S0046) on SAM.gov. The government is presently lacking Caltrans EP real estate to support construction, however the government is optimistic the interests will be acquired before the date and time that receipt of proposals are due but there is some risk that the interests may not be acquired in time which would prevent the receipt and opening of proposals which in turn would preclude a contract award. The American River Common Features (ARCF) Erosion- Lower American River Site 1-1, Contract 3A project is located on the American River within the American River Parkway in Sacramento, California. Site 1-1 is located on the left bank looking downstream. The site roughly extends from the Union Pacific Railroad Bridge to approximately 1,800-feet upstream of the Interstate 80 Business Bridge. Construction access will be from Sutters Landing Regional Park to the west and Glenn Hall Park to the east. The primary intent of the project is to reduce the risk of levee failure by erosion during extreme flow events. The work includes approximately 2,500 feet of riverbank and river toe erosion protection and stabilization of the existing levee to protect critical infrastructure against the effects of erosion during large flood events. Build only, no design. Vegetation clearing (including the removal of select trees to four feet above existing grade) and the transplanting of elderberry shrubs within the project footprint will be performed by others prior to erosion protection and on-site habitat construction activities. The Contractor will be required to protect identified vegetation, structures, and utilities, remove stumps, strip and grub the project footprint, install temporary access ramps, and place silt fencing, construction chain link fencing and construction safety fencing along the project footprint, staging areas, and haul routes. After the project site has been prepared, the Contractor will excavate and regrade approximately 3,300 cubic yards of material from the downstream riverbank slope, as well as stockpile suitable excavated material for placement as engineered fill. The Contractor will install soil-filled rock slope protection on the waterside levee face and riverbank, install rock apron protection at two existing stormwater outfalls, place soil and rock to construct river toe protection and planting bench features, tie-in erosion protection elements to existing rock revetment features, place instream wood structures on the planting benches, and provide temporary erosion control for stabilization of disturbed soil areas. About 2,500 feet of the site will require working in the active channel of the American River to place material with associated turbidity control. The project will require import and placement of approximately 36,000 tons of FHWA Class I riprap, 30 tons of FHWA Class II riprap, 750 tons of FHWA Class VI riprap; 6,400 tons of FHWA Subbase A bedding, 100 tons of B4 bedding; 9,500 cubic yards of FHWA Class I soil-filled rock; 4,600 cubic yards of topsoil, 7,000 cubic yards of soil fill; 145 trees (for instream wood structures), and 1350 live cuttings to be planted on-site. The work is to be completed in late spring, summer, and fall of 2023 with an estimated Period of Performance of 380 days. The Contract award is expected by mid-January 2023. In-water work is limited to the period of July 1, 2023 to October 31, 2023. All erosion protection and heavy on-site habitat mitigation work must be complete by December 2023. The contractor must coordinate activities with Caltrans Capital City Bridge Widening Project and the City Two River Trails Project staff and contractor planned to occur near the Site 1-1 project footprint and within a similar construction timeframe. A separate site revegetation contract is planned for Spring of 2024.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9123823B0013","product_service_code":"Y1LC"},{"dates":{"posted":"2024-04-25","response_deadline":{"raw":"2024-04-23T11:00:00-07:00","utc":"2024-04-23T18:00:00Z","date":"2024-04-23","time":"11:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/2158dea12cb6464384e4e51c38242841/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Lower American River (LAR) 3A","agency":{"office":{"code":"W91238","name":"W075 ENDIST SACRAMENTO"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"95814-2922","city":"SACRAMENTO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-05-23","archive_type":"auto_custom"},"contacts":[{"name":"Thomas Cochran","role":"primary","email":"thomas.cochran@usace.army.mil","phone":"9165577299"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"2158dea12cb6464384e4e51c38242841","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"52c21d92ef41ba3fb78a423db72e8db380e2ce97dbb4f3a5ed1d188496f543f9","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"**Amendment 0004 is a PIEE administrative amendment ONLY to update the PIEE and SAM Response Date and Description for W9123823B0013 Amendment 0003. There is no Solicitation Amendment 0004 for W9123823B0013. **W9123823B0013 Amendment 0003 is issued to 1. Extend the date for submission of bids 2. Change the bid opening date. 3. Update Solicitation section 00 21 13 - Instructions to Bidders. **W9123823B0013 Amendment 0002 - Block 14 for a description of amendment changes BID submissions are due NLT 16 APR 2024 at 11:00AM PDT and Bid Opening will be at 2:00PM PDT 16 APR 2024. **W9123823B0013 Amendment 0001 - See W9123823B0013-0001 Block 14 for a description of amendment changes **This will be a set-aside for Small Business. SBA Size Standard: $45 million The U.S. Army Corps of Engineers (USACE) Sacramento District (SPK) requires to construction services to conduct erosion control and strengthen the levee protecting the city of Sacramento, California. In accordance with DFARS 236.204(i), the Government currently estimates the magnitude of construction for this project to be between $10,000,000 and $25,000,000. This solicitation will use PSC: Y1LC, Construction of Tunnels and Subsurface Structures and NAICS Code: 237990, Other Heavy and Civil Engineering Construction. Offerors must use contractors from the Pre-Qualified Sources List (PSL) for American River Common Features (ARCF) 2016 Sacramento River and American River Erosion Construction Contracts updated 27 September 2023 via Special Notice Posting (W9123823S0046) on SAM.gov. The government is presently lacking Caltrans EP real estate to support construction, however the government is optimistic the interests will be acquired before the date and time that receipt of proposals are due but there is some risk that the interests may not be acquired in time which would prevent the receipt and opening of proposals which in turn would preclude a contract award. The American River Common Features (ARCF) Erosion- Lower American River Site 1-1, Contract 3A project is located on the American River within the American River Parkway in Sacramento, California. Site 1-1 is located on the left bank looking downstream. The site roughly extends from the Union Pacific Railroad Bridge to approximately 1,800-feet upstream of the Interstate 80 Business Bridge. Construction access will be from Sutters Landing Regional Park to the west and Glenn Hall Park to the east. The primary intent of the project is to reduce the risk of levee failure by erosion during extreme flow events. The work includes approximately 2,500 feet of riverbank and river toe erosion protection and stabilization of the existing levee to protect critical infrastructure against the effects of erosion during large flood events. Build only, no design. Vegetation clearing (including the removal of select trees to four feet above existing grade) and the transplanting of elderberry shrubs within the project footprint will be performed by others prior to erosion protection and on-site habitat construction activities. The Contractor will be required to protect identified vegetation, structures, and utilities, remove stumps, strip and grub the project footprint, install temporary access ramps, and place silt fencing, construction chain link fencing and construction safety fencing along the project footprint, staging areas, and haul routes. After the project site has been prepared, the Contractor will excavate and regrade approximately 3,300 cubic yards of material from the downstream riverbank slope, as well as stockpile suitable excavated material for placement as engineered fill. The Contractor will install soil-filled rock slope protection on the waterside levee face and riverbank, install rock apron protection at two existing stormwater outfalls, place soil and rock to construct river toe protection and planting bench features, tie-in erosion protection elements to existing rock revetment features, place instream wood structures on the planting benches, and provide temporary erosion control for stabilization of disturbed soil areas. About 2,500 feet of the site will require working in the active channel of the American River to place material with associated turbidity control. The project will require import and placement of approximately 36,000 tons of FHWA Class I riprap, 30 tons of FHWA Class II riprap, 750 tons of FHWA Class VI riprap; 6,400 tons of FHWA Subbase A bedding, 100 tons of B4 bedding; 9,500 cubic yards of FHWA Class I soil-filled rock; 4,600 cubic yards of topsoil, 7,000 cubic yards of soil fill; 145 trees (for instream wood structures), and 1350 live cuttings to be planted on-site. The work is to be completed in late spring, summer, and fall of 2023 with an estimated Period of Performance of 380 days. The Contract award is expected by mid-January 2023. In-water work is limited to the period of July 1, 2023 to October 31, 2023. All erosion protection and heavy on-site habitat mitigation work must be complete by December 2023. The contractor must coordinate activities with Caltrans Capital City Bridge Widening Project and the City Two River Trails Project staff and contractor planned to occur near the Site 1-1 project footprint and within a similar construction timeframe. A separate site revegetation contract is planned for Spring of 2024.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9123823B0013","product_service_code":"Y1LC"},{"award":{"date":"2024-05-29","amount":"11570320.00","number":"W9123824C0014","awardee":{"raw":"Ahtna-Forgen JV, LLC West Sacramento CA 95691 USA","name":"Ahtna-Forgen JV, LLC West Sacramento","location":{"zip":"95691","state":{"code":"CA"},"country":{"code":"USA"}}}},"dates":{"posted":"2024-05-29","award_date":"2024-05-29"},"links":{"sam":"https://sam.gov/workspace/contract/opp/0537732e14164dc19ff00e82ada27960/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Lower American River (LAR) 3A","agency":{"office":{"code":"W91238","name":"W075 ENDIST SACRAMENTO"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"95814-2922","city":"SACRAMENTO","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-06-13","archive_type":"auto15"},"contacts":[{"name":"Matthew Webb","role":"primary","email":"matthew.m.webb@usace.army.mil","phone":"9165577109"},{"name":"Rachel Kinney","role":"secondary","email":"rachel.kinney@usace.army.mil","phone":"9165576685"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"0537732e14164dc19ff00e82ada27960","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"6b13fd48036c6b25b2906610f7d02fc05f4017baac6374ab832be5bfa3858bed","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"W9123824C0014","place_of_performance":{"zip":"95816","city":{"name":"Sacramento"},"state":{"code":"CA"},"country":{"code":"USA"}},"product_service_code":"Y1LC"}],"due_at":"2024-04-23T18:00:00Z","due_date":"2024-04-23","closes_at":"2024-04-23T18:00:00Z","awardable":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W91238","office_name":"W075 ENDIST SACRAMENTO","state":"CA","county":"06067","county_name":"Sacramento County","city":"0664000","city_name":"Sacramento","country":"USA","winner_key":"DYD2F3E3LQS5","amount":"11570320.00","linked_awards":12,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z","principal_notice_id":"2158dea12cb6464384e4e51c38242841","description":{"text":"**Amendment 0004 is a PIEE administrative amendment ONLY to update the PIEE and SAM Response Date and Description for W9123823B0013 Amendment 0003. There is no Solicitation Amendment 0004 for W9123823B0013. **W9123823B0013 Amendment 0003 is issued to 1. Extend the date for submission of bids 2. Change the bid opening date. 3. Update Solicitation section 00 21 13 - Instructions to Bidders. **W9123823B0013 Amendment 0002 - Block 14 for a description of amendment changes BID submissions are due NLT 16 APR 2024 at 11:00AM PDT and Bid Opening will be at 2:00PM PDT 16 APR 2024. **W9123823B0013 Amendment 0001 - See W9123823B0013-0001 Block 14 for a description of amendment changes **This will be a set-aside for Small Business. SBA Size Standard: $45 million The U.S. Army Corps of Engineers (USACE) Sacramento District (SPK) requires to construction services to conduct erosion control and strengthen the levee protecting the city of Sacramento, California. In accordance with DFARS 236.204(i), the Government currently estimates the magnitude of construction for this project to be between $10,000,000 and $25,000,000. This solicitation will use PSC: Y1LC, Construction of Tunnels and Subsurface Structures and NAICS Code: 237990, Other Heavy and Civil Engineering Construction. Offerors must use contractors from the Pre-Qualified Sources List (PSL) for American River Common Features (ARCF) 2016 Sacramento River and American River Erosion Construction Contracts updated 27 September 2023 via Special Notice Posting (W9123823S0046) on SAM.gov. The government is presently lacking Caltrans EP real estate to support construction, however the government is optimistic the interests will be acquired before the date and time that receipt of proposals are due but there is some risk that the interests may not be acquired in time which would prevent the receipt and opening of proposals which in turn would preclude a contract award. The American River Common Features (ARCF) Erosion- Lower American River Site 1-1, Contract 3A project is located on the American River within the American River Parkway in Sacramento, California. Site 1-1 is located on the left bank looking downstream. The site roughly extends from the Union Pacific Railroad Bridge to approximately 1,800-feet upstream of the Interstate 80 Business Bridge. Construction access will be from Sutters Landing Regional Park to the west and Glenn Hall Park to the east. The primary intent of the project is to reduce the risk of levee failure by erosion during extreme flow events. The work includes approximately 2,500 feet of riverbank and river toe erosion protection and stabilization of the existing levee to protect critical infrastructure against the effects of erosion during large flood events. Build only, no design. Vegetation clearing (including the removal of select trees to four feet above existing grade) and the transplanting of elderberry shrubs within the project footprint will be performed by others prior to erosion protection and on-site habitat construction activities. The Contractor will be required to protect identified vegetation, structures, and utilities, remove stumps, strip and grub the project footprint, install temporary access ramps, and place silt fencing, construction chain link fencing and construction safety fencing along the project footprint, staging areas, and haul routes. After the project site has been prepared, the Contractor will excavate and regrade approximately 3,300 cubic yards of material from the downstream riverbank slope, as well as stockpile suitable excavated material for placement as engineered fill. The Contractor will install soil-filled rock slope protection on the waterside levee face and riverbank, install rock apron protection at two existing stormwater outfalls, place soil and rock to construct river toe protection and planting bench features, tie-in erosion protection elements to existing rock revetment features, place instream wood structures on the planting benches, and provide temporary erosion control for stabilization of disturbed soil areas. About 2,500 feet of the site will require working in the active channel of the American River to place material with associated turbidity control. The project will require import and placement of approximately 36,000 tons of FHWA Class I riprap, 30 tons of FHWA Class II riprap, 750 tons of FHWA Class VI riprap; 6,400 tons of FHWA Subbase A bedding, 100 tons of B4 bedding; 9,500 cubic yards of FHWA Class I soil-filled rock; 4,600 cubic yards of topsoil, 7,000 cubic yards of soil fill; 145 trees (for instream wood structures), and 1350 live cuttings to be planted on-site. The work is to be completed in late spring, summer, and fall of 2023 with an estimated Period of Performance of 380 days. The Contract award is expected by mid-January 2023. In-water work is limited to the period of July 1, 2023 to October 31, 2023. All erosion protection and heavy on-site habitat mitigation work must be complete by December 2023. The contractor must coordinate activities with Caltrans Capital City Bridge Widening Project and the City Two River Trails Project staff and contractor planned to occur near the Site 1-1 project footprint and within a similar construction timeframe. A separate site revegetation contract is planned for Spring of 2024.","html":null,"origin":"extract"},"contacts":[{"name":"Matthew Webb","role":"primary","email":"matthew.m.webb@usace.army.mil","phone":"9165577109"},{"name":"Rachel Kinney","role":"secondary","email":"rachel.kinney@usace.army.mil","phone":"9165576685"}],"place_of_performance":null,"office_address":{"zip":"95814-2922","city":"SACRAMENTO","state":"CA","country":"USA"},"naics_codes":["237990"],"award":null,"attachments":[],"awards":[{"award_key":"CONT_AWD_W9123824C0014_9700_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_W9123824C0014_9700_-NONE-_-NONE-/","piid":"W9123824C0014","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"DYD2F3E3LQS5","recipient_name":"AHTNA-FORGEN JV, LLC","recipient_uei":"DYD2F3E3LQS5","recipient_cage":"9R4W2","recipient_city":"WEST SACRAMENTO","recipient_state":"CA","sub_name":"Department of the Army","office_name":"W075 ENDIST SACRAMENTO","office_key":"o-W91238","first_action_date":"2024-05-29","last_action_date":"2025-11-21","actions":9,"obligated":"12267951.81","current_total_value":"12267951.81","potential_total_value":"12267951.81","naics":"237990","psc":"Y1LC","extent_competed":"FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES","set_aside":"SMALL BUSINESS SET ASIDE - TOTAL","offers_received":5,"description":"ARCF LAR CONTRACT 3A","method":"piid","confidence":"high","evidence":["award number W9123824C0014 equals the contract number","same awarding office W91238"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"W9123826QA035","latest_notice_id":"cc2591d27f6f42259ee6ab04175f78b7","title":"IIS USFS Tanbark Hazard Tree Removal","solicitation_number":"W9123826QA035","notice_type":"o","first_type":"p","first_posted":"2026-08-19","last_posted":"2026-09-16","notices":11,"due_at":"2026-09-22T18:00:00Z","due_date":"2026-09-22","closes_at":"2026-09-22T18:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W91238","office_name":"W075 ENDIST SACRAMENTO","naics":"561730","psc":"S208","set_aside":"SBA","state":"CA","county":"06065","county_name":"Riverside County","city":"0662000","city_name":"Riverside","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-17T06:28:38.602097Z"},{"key":"W9123826BA012","latest_notice_id":"f7471420eac940edade708d93e2560d9","title":"USACE SPK Construction - Natomas PP5, Sacramento, CA","solicitation_number":"W9123826BA012","notice_type":"o","first_type":"p","first_posted":"2026-06-22","last_posted":"2026-09-10","notices":8,"due_at":"2026-09-29T16:00:00Z","due_date":"2026-09-29","closes_at":"2026-09-29T16:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W91238","office_name":"W075 ENDIST SACRAMENTO","naics":"237990","psc":"Y1LC","set_aside":null,"state":"CA","county":"06067","county_name":"Sacramento County","city":"0664000","city_name":"Sacramento","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"W9123826RA002","latest_notice_id":"397fc5d3076642548f6a132a54f940f6","title":"Fire Alarm and Mass Notification System Upgrades for DDJC, Tracy, CA","solicitation_number":"W9123826RA002","notice_type":"o","first_type":"r","first_posted":"2025-10-07","last_posted":"2026-09-15","notices":4,"due_at":"2026-10-05T17:00:00Z","due_date":"2026-10-05","closes_at":"2026-10-05T17:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W91238","office_name":"W075 ENDIST SACRAMENTO","naics":"238210","psc":"Z1JZ","set_aside":null,"state":"CA","county":"06077","county_name":"San Joaquin County","city":"0680238","city_name":"Tracy","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"W9123826X1CDK","latest_notice_id":"60ed6142b95c4f7ebb0e35611c59095b","title":"USACE SPK MOTCO Facilities and Utilities Maintenance Services - Concord, California","solicitation_number":"W9123826X1CDK","notice_type":"r","first_type":"r","first_posted":"2026-09-08","last_posted":"2026-09-08","notices":2,"due_at":"2026-10-08T22:00:00Z","due_date":"2026-10-08","closes_at":"2026-10-08T22:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W91238","office_name":"W075 ENDIST SACRAMENTO","naics":"561210","psc":"M1AZ","set_aside":"8A","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"W9123826RA008","latest_notice_id":"8772a8b240e14262ba47363dc935bbba","title":"$625M USACE SPD Vertical AE Design MATOC","solicitation_number":"W9123826RA008","notice_type":"o","first_type":"s","first_posted":"2026-05-08","last_posted":"2026-09-16","notices":6,"due_at":"2026-10-12T16:00:00Z","due_date":"2026-10-12","closes_at":"2026-10-12T16:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W91238","office_name":"W075 ENDIST SACRAMENTO","naics":"541330","psc":"C219","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-17T06:28:38.602097Z"}]}