{"canonical":"https://abierto.us/opportunities/w9123626ba006","key":"W9123626BA006","url":"https://abierto.us/opportunities/w9123626ba006","title":"Fort Lee Vehicle Recovery Range","solicitation_number":"W9123626BA006","notice_type":"o","open":true,"response_deadline":"2026-09-29T18:00:00Z","first_posted":"2026-06-29","last_posted":"2026-08-25","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"W2SD ENDIST NORFOLK","naics":"236220","psc":"Y1PZ","set_aside":"8A","place_state":"VA","winner":null,"award_amount":null,"publications":[{"notice_id":"ec745ba54a054d79a777f2701ea3795c","title":"Fort Lee Vehicle Recovery Range","solicitation_number":"W9123626BA006","notice_type":"o","base_type":"o","posted":"2026-06-29","posted_at":null,"due_at":"2026-07-28T18:00:00Z","due_date":"2026-07-28","cancelled":null,"archived":null,"archive_date":"2027-06-18","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/ec745ba54a054d79a777f2701ea3795c/view","enriched":false,"history":[]},{"notice_id":"9a785e632e5b4c10ae84a6eea0c2a6cb","title":"Fort Lee Vehicle Recovery Range","solicitation_number":"W9123626BA006","notice_type":"o","base_type":"o","posted":"2026-07-17","posted_at":null,"due_at":"2026-07-28T18:00:00Z","due_date":"2026-07-28","cancelled":null,"archived":null,"archive_date":"2027-06-18","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/9a785e632e5b4c10ae84a6eea0c2a6cb/view","enriched":false,"history":[]},{"notice_id":"eefee8bded624da78df45ba69e492b56","title":"Fort Lee Vehicle Recovery Range","solicitation_number":"W9123626BA006","notice_type":"o","base_type":"o","posted":"2026-07-21","posted_at":null,"due_at":"2026-08-11T18:00:00Z","due_date":"2026-08-11","cancelled":null,"archived":null,"archive_date":"2027-07-21","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/eefee8bded624da78df45ba69e492b56/view","enriched":false,"history":[]},{"notice_id":"078e7981e3104731bc0f4dc2446d7953","title":"Fort Lee Vehicle Recovery Range","solicitation_number":"W9123626BA006","notice_type":"o","base_type":"o","posted":"2026-08-04","posted_at":null,"due_at":"2026-09-01T18:00:00Z","due_date":"2026-09-01","cancelled":null,"archived":null,"archive_date":"2027-08-04","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/078e7981e3104731bc0f4dc2446d7953/view","enriched":false,"history":[]},{"notice_id":"f46186008fd74b78a4b34dda5272802e","title":"Fort Lee Vehicle Recovery Range","solicitation_number":"W9123626BA006","notice_type":"o","base_type":"o","posted":"2026-08-25","posted_at":null,"due_at":"2026-09-29T18:00:00Z","due_date":"2026-09-29","cancelled":null,"archived":null,"archive_date":"2027-08-25","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/f46186008fd74b78a4b34dda5272802e/view","enriched":false,"history":[]}],"latest_notice_id":"f46186008fd74b78a4b34dda5272802e","first_type":"o","notices":[{"dates":{"posted":"2026-06-29","response_deadline":{"raw":"2026-07-28T14:00:00-04:00","utc":"2026-07-28T18:00:00Z","date":"2026-07-28","time":"14:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/ec745ba54a054d79a777f2701ea3795c/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Fort Lee Vehicle Recovery Range","agency":{"office":{"code":"W91236","name":"W2SD ENDIST NORFOLK"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"23510-1096","city":"NORFOLK","state":"VA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"archive_date":"2027-06-18","archive_type":"auto_custom"},"contacts":[{"name":"Michael Stevenson","role":"primary","email":"michael.l.stevenson@usace.army.mil","phone":"(757) 201-7233"},{"name":"Michael Hagerty","role":"secondary","email":"michael.hagerty@usace.army.mil","phone":"(757) 201-7303"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"ec745ba54a054d79a777f2701ea3795c","set_aside":{"code":"8A","label":"8(a) Set-Aside (FAR 19.8)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T07:50:12.777658Z","row_sha256":"cfccd9d539427771d4bcaefd806036bce2163f89a7093e6147f0f4804a866edd","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-16T07:50:12.777658Z","first_seen_at":"2026-09-16T00:55:28.845070Z"},"description":{"text":"Amendment 0001: An amenedment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0001, to view the summary of changes, including site visit information. The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9123626BA006","place_of_performance":{"city":{"name":"Fort Lee"},"state":{"code":"VA"},"country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"dates":{"posted":"2026-07-17","response_deadline":{"raw":"2026-07-28T14:00:00-04:00","utc":"2026-07-28T18:00:00Z","date":"2026-07-28","time":"14:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/9a785e632e5b4c10ae84a6eea0c2a6cb/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Fort Lee Vehicle Recovery Range","agency":{"office":{"code":"W91236","name":"W2SD ENDIST NORFOLK"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"23510-1096","city":"NORFOLK","state":"VA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"archive_date":"2027-06-18","archive_type":"auto_custom"},"contacts":[{"name":"Michael Stevenson","role":"primary","email":"michael.l.stevenson@usace.army.mil","phone":"(757) 201-7233"},{"name":"Michael Hagerty","role":"secondary","email":"michael.hagerty@usace.army.mil","phone":"(757) 201-7303"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"9a785e632e5b4c10ae84a6eea0c2a6cb","set_aside":{"code":"8A","label":"8(a) Set-Aside (FAR 19.8)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T07:50:12.777658Z","row_sha256":"7cdc3fbb6d19c95c4ae2a716ce7f3782295f1edd3e69c4c131cb13cb0816dff2","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-16T07:50:12.777658Z","first_seen_at":"2026-09-16T00:55:28.845070Z"},"description":{"text":"Amendment 0002: An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0002, to view the site visit attendance log.. Project Summary: The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9123626BA006","place_of_performance":{"city":{"name":"Fort Lee"},"state":{"code":"VA"},"country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"dates":{"posted":"2026-07-21","response_deadline":{"raw":"2026-08-11T14:00:00-04:00","utc":"2026-08-11T18:00:00Z","date":"2026-08-11","time":"14:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/eefee8bded624da78df45ba69e492b56/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Fort Lee Vehicle Recovery Range","agency":{"office":{"code":"W91236","name":"W2SD ENDIST NORFOLK"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"23510-1096","city":"NORFOLK","state":"VA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"archive_date":"2027-07-21","archive_type":"auto_custom"},"contacts":[{"name":"Michael Stevenson","role":"primary","email":"michael.l.stevenson@usace.army.mil","phone":"(757) 201-7233"},{"name":"Michael Hagerty","role":"secondary","email":"michael.hagerty@usace.army.mil","phone":"(757) 201-7303"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"eefee8bded624da78df45ba69e492b56","set_aside":{"code":"8A","label":"8(a) Set-Aside (FAR 19.8)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T07:50:12.777658Z","row_sha256":"585f3808690f0bb8473b2c7904575e02fe46885676c55a54edb7fa8535d9f3e9","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-16T07:50:12.777658Z","first_seen_at":"2026-09-16T00:55:28.845070Z"},"description":{"text":"Amendment 0003: An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0003, extending the bid due date and bid opening date. Project Summary: The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9123626BA006","place_of_performance":{"city":{"name":"Fort Lee"},"state":{"code":"VA"},"country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"dates":{"posted":"2026-08-04","response_deadline":{"raw":"2026-09-01T14:00:00-04:00","utc":"2026-09-01T18:00:00Z","date":"2026-09-01","time":"14:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/078e7981e3104731bc0f4dc2446d7953/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Fort Lee Vehicle Recovery Range","agency":{"office":{"code":"W91236","name":"W2SD ENDIST NORFOLK"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"23510-1096","city":"NORFOLK","state":"VA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"archive_date":"2027-08-04","archive_type":"auto_custom"},"contacts":[{"name":"Michael Stevenson","role":"primary","email":"michael.l.stevenson@usace.army.mil","phone":"(757) 201-7233"},{"name":"Michael Hagerty","role":"secondary","email":"michael.hagerty@usace.army.mil","phone":"(757) 201-7303"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"078e7981e3104731bc0f4dc2446d7953","set_aside":{"code":"8A","label":"8(a) Set-Aside (FAR 19.8)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T07:50:12.777658Z","row_sha256":"2df906e1e7d595e7c5002cd8fb1c840d7d4141c15c8cf255b9dc4ba03f96b495","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-16T07:50:12.777658Z","first_seen_at":"2026-09-16T00:55:28.845070Z"},"description":{"text":"Amendment 0004: An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0004, extending the bid due date and bid opening date. The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9123626BA006","place_of_performance":{"city":{"name":"Fort Lee"},"state":{"code":"VA"},"country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"dates":{"posted":"2026-08-25","response_deadline":{"raw":"2026-09-29T14:00:00-04:00","utc":"2026-09-29T18:00:00Z","date":"2026-09-29","time":"14:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/f46186008fd74b78a4b34dda5272802e/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Fort Lee Vehicle Recovery Range","agency":{"office":{"code":"W91236","name":"W2SD ENDIST NORFOLK"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"23510-1096","city":"NORFOLK","state":"VA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"archive_date":"2027-08-25","archive_type":"auto_custom"},"contacts":[{"name":"Michael Stevenson","role":"primary","email":"michael.l.stevenson@usace.army.mil","phone":"(757) 201-7233"},{"name":"Michael Hagerty","role":"secondary","email":"michael.hagerty@usace.army.mil","phone":"(757) 201-7303"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"f46186008fd74b78a4b34dda5272802e","set_aside":{"code":"8A","label":"8(a) Set-Aside (FAR 19.8)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T07:50:12.777658Z","row_sha256":"2d6041a3fb036e148dd5670487a995494a80c4c860896c8acad03c2bf7124dba","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-16T07:50:12.777658Z","first_seen_at":"2026-09-15T22:52:52.472456Z"},"description":{"text":"Amendment 0005: An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0005. This amendment incoporates the correct solicitaion documents dated May 26, 2026 to replace the previous inadvertently issued solicitation documets dated November 2025. This amendment also reopens ProjNet and extends the bid due date and bid opening date. Please see the amendment for the complete summary of change. The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9123626BA006","place_of_performance":{"city":{"name":"Fort Lee"},"state":{"code":"VA"},"country":{"code":"USA"}},"product_service_code":"Y1PZ"}],"due_at":"2026-09-29T18:00:00Z","due_date":"2026-09-29","closes_at":"2026-09-29T18:00:00Z","awardable":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W91236","office_name":"W2SD ENDIST NORFOLK","state":"VA","country":"USA","winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T07:31:38.954589Z","principal_notice_id":"f46186008fd74b78a4b34dda5272802e","description":{"text":"Amendment 0005: An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0005. This amendment incoporates the correct solicitaion documents dated May 26, 2026 to replace the previous inadvertently issued solicitation documets dated November 2025. This amendment also reopens ProjNet and extends the bid due date and bid opening date. Please see the amendment for the complete summary of change. The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.","html":null,"origin":"extract"},"contacts":[{"name":"Michael Stevenson","role":"primary","email":"michael.l.stevenson@usace.army.mil","phone":"(757) 201-7233"},{"name":"Michael Hagerty","role":"secondary","email":"michael.hagerty@usace.army.mil","phone":"(757) 201-7303"}],"place_of_performance":{"city":{"name":"Fort Lee"},"state":{"code":"VA"},"country":{"code":"USA"}},"office_address":{"zip":"23510-1096","city":"NORFOLK","state":"VA","country":"USA"},"naics_codes":["236220"],"award":null,"attachments":[],"awards":[],"related":[{"key":"DACA65B2702","latest_notice_id":"fa87cb8e3cee466c8cdb51ddd9a493a7","title":"Fort A.P. Hill Timber Sale Invitation for Bid # DACA65-B-27-02","solicitation_number":"DACA65-B-27-02","notice_type":"k","first_type":"k","first_posted":"2026-08-13","last_posted":"2026-08-13","notices":1,"due_at":"2026-09-16T17:00:00Z","due_date":"2026-09-16","closes_at":"2026-09-16T17:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W91236","office_name":"W2SD ENDIST NORFOLK","naics":"113310","psc":"5510","set_aside":null,"state":"VA","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T07:31:38.954589Z"},{"key":"DACA65B2704","latest_notice_id":"6f442a94a6934e6794f88306a077716e","title":"Standing_Timber_Sale_Fort_Drum","solicitation_number":"DACA65-B-27-04","notice_type":"k","first_type":"k","first_posted":"2026-08-18","last_posted":"2026-08-18","notices":1,"due_at":"2026-09-17T18:00:00Z","due_date":"2026-09-17","closes_at":"2026-09-17T18:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W91236","office_name":"W2SD ENDIST NORFOLK","naics":"113310","psc":"5510","set_aside":null,"state":"NY","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T07:31:38.954589Z"},{"key":"W9123626RA013","latest_notice_id":"3970274c74be4a14aadd0035b1012d2f","title":"DoWEA PMDM-NC IDIQ RFP","solicitation_number":"W9123626RA013","notice_type":"o","first_type":"o","first_posted":"2026-08-20","last_posted":"2026-09-08","notices":2,"due_at":"2026-09-21T14:00:00Z","due_date":"2026-09-21","closes_at":"2026-09-21T14:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W91236","office_name":"W2SD ENDIST NORFOLK","naics":"238220","psc":"Z1CA","set_aside":"SBA","state":null,"country":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T07:31:38.954589Z"},{"key":"W9123627X1CJ7","latest_notice_id":"58269cbbe9064c3fb03965b3038201ae","title":"Water Intake Facility at Radford Army Ammunition Plant","solicitation_number":"W9123627X1CJ7","notice_type":"r","first_type":"r","first_posted":"2026-09-11","last_posted":"2026-09-11","notices":1,"due_at":"2026-09-28T14:00:00Z","due_date":"2026-09-28","closes_at":"2026-09-28T14:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W91236","office_name":"W2SD ENDIST NORFOLK","naics":"237110","psc":"Y1NE","set_aside":null,"state":"VA","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T07:31:38.954589Z"},{"key":"W9123626QA004","latest_notice_id":"b44b63a740134d28b88da31dbe5b9feb","title":"Gathright Dam Herbicide Service Contract","solicitation_number":"W9123626QA004","notice_type":"o","first_type":"o","first_posted":"2026-08-31","last_posted":"2026-08-31","notices":1,"due_at":"2026-09-30T18:00:00Z","due_date":"2026-09-30","closes_at":"2026-09-30T18:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W91236","office_name":"W2SD ENDIST NORFOLK","naics":"561730","psc":"S208","set_aside":"SBA","state":null,"country":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T07:31:38.954589Z"}]}