# Maintenance Building Roof Replacement at Crooked Creek Lake

Canonical: https://abierto.us/opportunities/w911wn24b8011

- Solicitation number: W911WN24B8011
- Notice type: Award notice (first published as presolicitation)
- Status: Awarded to Green Build USA LLC for $203,313.50
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W072 Endist Pittsburgh (W911WN)
- NAICS: 238160 Roofing Contractors
- Product or service code: Y1QA Construction Of Restoration Of Real Property (Public Or Private)
- Set-aside: Total small business set-aside
- County: Armstrong County (FIPS 42005). https://abierto.us/counties/armstrong-county-pa-42005
- City: Ford City. https://abierto.us/cities/ford-city-pa-4226512
- First posted: January 30, 2024
- Last posted: May 2, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/87698428584a4cf284aae71509e32242/view

## Description

Maintenance Building Roof Replacement, Crooked Creek Lake, Ford City, Armstrong County, PA. The U.S. Army Corps of Engineers, Pittsburgh District. The U.S. Army Corps of Engineers, Pittsburgh District, has a requirement to replace a membrane roof and install new gutters and downspouts on the maintenance building at Crooked Creek Lake. The major features of the contract are identified below:

a. Removal and disposal of all gutters and downspouts.

b. Removal and disposal of all flashing.

c. Removal and disposal of all roof membrane.

d. Removal and disposal of a 4 foot width of existing insulation board down to roof deck around entire perimeter of the roof and replacement with new polyisocyanurate board insulation.

e. Installation of new, fiberglass faced gypsum cover board over all insulation board over the entire roof.

f. Installation of new pipe boots, new curbing and flashing at exhaust fans and vents g. Installation of new fully adhered reinforced Polyvinyl Chloride (PVC) roof membrane. h. Installation of new flashing, perimeter flashing and drip edge .i. Installation of new aluminum gutters and downspouts. j. The Contractor will be required to furnish roof system material and workmanship warranties.

Roof membrane manufacturers warranty shall cover roof system materials and installation workmanship, including flashing, insulation, and accessories necessary for a watertight roof system construction for a duration of not less than 20 years. k. Roof system installer shall be approved, authorized, or licensed in writing by the roof system manufacturer and shall have at least the minimum five (5) years? experience required by the manufacturer as an approved, authorized, or licensed installer with that manufacturer and be approved at a level capable of providing the specified warranty.

The work shall be completed within 270 calendar days after written Notice to Proceed. **NOTICE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here. 2-27-2024 - Pre-bid site visit conducted. Contracting discussion and site visit attendance sheet posted. 3-27-2024 - Bid opening held; results and attendance have been attached.

## Award on USAspending

- Recipient: Green Build USA LLC (UEI L2B4TYGP6YM6)
- Contract: W911WN24C8009, definitive contract
- Obligated: $203,313.50
- Competition: Full and Open Competition After Exclusion of Sources, 5 offers received
- Link: solicitation number W911WN24C8009 was reused as the contract number; same awarding office W911WN (high confidence)
- Record: https://www.usaspending.gov/award/CONT_AWD_W911WN24C8009_9700_-NONE-_-NONE-/


## Publications

- January 30, 2024: Presolicitation, due January 26, 2024 at 5:00 PM EST. Notice 446a61973b6b4b01b8a8de42ca30fc94. https://sam.gov/workspace/contract/opp/446a61973b6b4b01b8a8de42ca30fc94/view
- February 21, 2024: Solicitation, due March 27, 2024 at 11:00 AM EDT. Notice 388dd1a75f564db3b4e09c927ce9c1e1. https://sam.gov/workspace/contract/opp/388dd1a75f564db3b4e09c927ce9c1e1/view
- February 27, 2024: Solicitation, due March 27, 2024 at 11:00 AM EDT. Notice 374af7af302c494dad4c975b00da2e44. https://sam.gov/workspace/contract/opp/374af7af302c494dad4c975b00da2e44/view
- March 27, 2024: Solicitation, due March 27, 2024 at 11:00 AM EDT. Notice 44ba20e4fe2f4cf4a198d44d09e1e503. https://sam.gov/workspace/contract/opp/44ba20e4fe2f4cf4a198d44d09e1e503/view
- May 2, 2024: Award notice. Notice 87698428584a4cf284aae71509e32242. https://sam.gov/workspace/contract/opp/87698428584a4cf284aae71509e32242/view

## Points of contact

- Aaron Barr, aaron.m.barr@usace.army.mil, 412-395-7157
- CONNIE FERGUSON, connie.l.ferguson@usace.army.mil, 4123957551

---
Source: SAM.gov Contract Opportunities bulk extract and USAspending.gov award data. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/w911wn24b8011.
