# CBRN Sensor Integration on Robotic Platforms (CSIRP) Capability Set 4.0 – Expanded CBRN Detection and Autonomy

Canonical: https://abierto.us/opportunities/w911sr25rcsirp

- Solicitation number: W911SR-25-R-CSIRP
- Notice type: Special notice
- Status: Closed. Deadline was August 1, 2025 at 2:00 PM EDT
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W6QK ACC-APG (W911SR)
- NAICS: 541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
- Product or service code: AC13 National Defense R&D Services; Department Of Defense - Military; Experimental Development
- Place of performance: Aberdeen Proving Ground, Maryland
- County: Harford County (FIPS 24025). https://abierto.us/counties/harford-county-md-24025
- City: Aberdeen Proving Ground. https://abierto.us/cities/aberdeen-proving-ground-md-2400175
- First posted: June 18, 2025
- Last posted: July 28, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/c087c4c4efae41e2a61864503285fca5/view

## Description

Edgewood Contracting Division, Fort Detrick Request for Project Proposal W911SR-25-R-CSIRP Agency:

**Department of the Army Office:**

**Army Contracting Command, Edgewood Contracting Division Location:**

**Fort Detrick, MD, USA Program Office:** JPEO CBRND – Joint Program Manager CBRN Sensors (JPEO-CBRND – JPM CBRN Sensors)

**RPP Number:**

**W911SR-25-R-CSIRP Date Issued:**

**18 Jun 2025 Proposals Due:**

**01 Aug 2025 NLT 1400 EST Questions:** Due by 25 Jul 2025 NLT 1400 EST 1. In accordance with Section I of announcement CWMD BOTAA 24-01, the Government is hereby requesting formal submission of preproposals intended to execute a formal agreement under 10 USC 4022(b), Other Transaction Authority (OTA) for the prototype project described below. Upon receipt of a preproposal submitted in response to this RPP, the next steps are as follows:

The Government will evaluate the preproposal. Discussions among the parties, whether in-person, virtually, verbally, or in writing, will occur as appropriate. The Government may request a full proposal from the offeror(s). Additional discussions may occur as necessary. Award(s) may be made after evaluation and selection of a successful preproposal/proposal.

**(Note:** Awards are dependent upon the availability of funds.) 2.This competitive Request for Project Proposal (RPP) is issued to request project proposals in compliance with 10 USC 4022 and is being issued for planning purposes only. It is not to be construed as a commitment by the Government to award an agreement, nor will the Government pay for the information solicited. This RPP is for the requirement described in Attachment 1, Statement of Objectives (SOO).

3. JPM CBRN Sensors has identified a need to advance the integration of CBRN sensors and autonomy capabilities unmanned aircraft system (UAS), unmanned ground system (UGS), and unmanned surface vessel (USV) platforms. Any award resulting from this RPP may be issued as an agreement under the authority of 10 USC 4022, with the expectation of a prototype testing event followed by final prototype development of the successful prototype.

Follow on the purchase of quantities necessary for fielding and sustainment are considered. 4. Attached is the full announcement for consideration.

Preproposals must be limited to ten (10) pages (not including cover sheet or supporting attachments for key personnel, intellectual property (IP), and cost information) and include a description of the relevant technology including supporting data, the scope of the proposed effort including a high-level Work Breakdown Structure (WBS), and a description of the proposer’s research, development, manufacturing, past performance, or other special qualifications.

Submissions must also document the performers ability to meet the objectives and deliverables listed in the SOO. The preproposal must include a listing of existing patents or background IP for consideration, in addition to specify data rights for the subject data developed under the proposed prototype.

The preproposal must also include an anticipated rough order of magnitude (ROM) cost for the efforts described in the preproposal, including a table demonstrating high level breakdown of the elements of cost for consideration (labor, hours, materials, ODC’s, other costs, indirects and fee) based on fiscal year.

Preproposals shall be submitted in accordance with CWMD BOTAA-24-01 Section III.B.1 “Other Transaction Agreements for Prototypes” to the below listed mailboxes only: usarmy.detrick.dod-jpeo-cbrnd.mbx.baa@army.mil richard.w.totten2.civ@army.mil alexander.z.mayatte.civ@army.mil Late submissions will not be considered. All questions must be submitted NLT 1400 05 Jul 2025.

Answers to received questions posted below in file named 'CRM Questions for RPP_28JUL2025'. The list of potential teaming partners based on Industry Day Participation may also be found in the aformentioned file.

## Publications

- June 18, 2025: Special notice, due July 2, 2025 at 2:00 PM EDT. Notice a61f55c922ec4818bb751020167c00e1. https://sam.gov/workspace/contract/opp/a61f55c922ec4818bb751020167c00e1/view
- June 18, 2025: Special notice, due July 2, 2025 at 2:00 PM EDT. Notice b6400825d226430a92342a9bb51366fb. https://sam.gov/workspace/contract/opp/b6400825d226430a92342a9bb51366fb/view
- June 18, 2025: Special notice, due July 2, 2025 at 2:00 PM EDT. Notice e21c72cef7d844309f7ac8e9ef5f57eb. https://sam.gov/workspace/contract/opp/e21c72cef7d844309f7ac8e9ef5f57eb/view
- June 24, 2025: Special notice, due July 16, 2025 at 2:00 PM EDT. Notice 1e12aaf78a3f4682b5e0b51727e9fe76. https://sam.gov/workspace/contract/opp/1e12aaf78a3f4682b5e0b51727e9fe76/view
- June 25, 2025: Special notice, due July 16, 2025 at 2:00 PM EDT. Notice 41a1470d9dd7443cb020c6c8182ec392. https://sam.gov/workspace/contract/opp/41a1470d9dd7443cb020c6c8182ec392/view
- July 9, 2025: Special notice, due July 30, 2025 at 2:00 PM EDT. Notice f0504b27289c43a6ad21f8c4545a2b60. https://sam.gov/workspace/contract/opp/f0504b27289c43a6ad21f8c4545a2b60/view
- July 9, 2025: Special notice, due July 16, 2025 at 2:00 PM EDT. Notice f7c7124ec78e4d98bd62da13e9371169. https://sam.gov/workspace/contract/opp/f7c7124ec78e4d98bd62da13e9371169/view
- July 14, 2025: Special notice, due July 30, 2025 at 2:00 PM EDT. Notice ae60acde7a2947fa9bf06bb5e649e311. https://sam.gov/workspace/contract/opp/ae60acde7a2947fa9bf06bb5e649e311/view
- July 28, 2025: Special notice, due July 30, 2025 at 2:00 PM EDT. Notice 60d4a7e6ede7400891fbd9f868a472c4. https://sam.gov/workspace/contract/opp/60d4a7e6ede7400891fbd9f868a472c4/view
- July 28, 2025: Special notice, due August 1, 2025 at 2:00 PM EDT. Notice c087c4c4efae41e2a61864503285fca5. https://sam.gov/workspace/contract/opp/c087c4c4efae41e2a61864503285fca5/view

## Points of contact

- Richard Totten, richard.w.totten2.civ@army.mil
- Alexander Mayatte, alexander.z.mayatte.civ@army.mil

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/w911sr25rcsirp.
