{"canonical":"https://abierto.us/opportunities/w911rq26qa018","key":"W911RQ26QA018","url":"https://abierto.us/opportunities/w911rq26qa018","title":"Posi-Turner: Model numbers – 10LS-250 or equal to","solicitation_number":"W911RQ26QA018","notice_type":"k","open":true,"response_deadline":"2026-09-28T18:00:00Z","first_posted":"2026-09-10","last_posted":"2026-09-15","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"W6QK ACC RRAD","naics":"333998","psc":"4910","set_aside":"SBA","place_state":"TX","winner":null,"award_amount":null,"publications":[{"notice_id":"22514ee8b8d449789ac856e028cf9105","title":"Posi-Turner: Model numbers – 10LS-250 or equal to","solicitation_number":"W911RQ26QA018","notice_type":"k","base_type":"k","posted":"2026-09-10","posted_at":"2026-09-10T19:29:58.855Z","due_at":"2026-09-28T18:00:00Z","due_date":"2026-09-28","cancelled":false,"archived":false,"archive_date":"2026-10-13","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/22514ee8b8d449789ac856e028cf9105/view","enriched":true,"history":[{"index":2,"title":"Posi-Turner: Model numbers – 10LS-250 or equal to","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-15T15:58:47.486Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"b50574115931450dbef929bef239b319","solicitation_number":"W911RQ26QA018","parent_opportunity_id":"22514ee8b8d449789ac856e028cf9105"},{"index":1,"title":"Posi-Turner: Model numbers – 10LS-250 or equal to","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-10T19:29:58.855Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"22514ee8b8d449789ac856e028cf9105","solicitation_number":"W911RQ26QA018"}]},{"notice_id":"b50574115931450dbef929bef239b319","title":"Posi-Turner: Model numbers – 10LS-250 or equal to","solicitation_number":"W911RQ26QA018","notice_type":"k","base_type":"k","posted":"2026-09-15","posted_at":"2026-09-15T15:58:47.486Z","due_at":"2026-09-28T18:00:00Z","due_date":"2026-09-28","cancelled":false,"archived":false,"archive_date":"2026-10-13","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/b50574115931450dbef929bef239b319/view","enriched":true,"history":[{"index":2,"title":"Posi-Turner: Model numbers – 10LS-250 or equal to","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-15T15:58:47.486Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"b50574115931450dbef929bef239b319","solicitation_number":"W911RQ26QA018","parent_opportunity_id":"22514ee8b8d449789ac856e028cf9105"},{"index":1,"title":"Posi-Turner: Model numbers – 10LS-250 or equal to","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-10T19:29:58.855Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"22514ee8b8d449789ac856e028cf9105","solicitation_number":"W911RQ26QA018"}]}],"latest_notice_id":"b50574115931450dbef929bef239b319","first_type":"k","notices":[{"dates":{"posted":"2026-09-10","posted_at":"2026-09-10T19:29:58.855Z","created_at":"2026-09-10T19:24:44.115Z","modified_at":"2026-09-15T15:58:47.486Z","response_deadline":{"raw":"2026-09-28T13:00:00-05:00","utc":"2026-09-28T18:00:00Z","date":"2026-09-28","time":"13:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/22514ee8b8d449789ac856e028cf9105/view"},"naics":{"codes":["333998"],"primary":"333998"},"title":"Posi-Turner: Model numbers – 10LS-250 or equal to","agency":{"office":{"code":"W911RQ","name":"W6QK ACC RRAD"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"75507-5000","city":"TEXARKANA","state":"TX","country":"USA"},"organization_id":"500045566","organization_type":"OFFICE"},"status":{"active":true,"latest":false,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-10-13","archive_type":"auto15"},"history":[{"index":2,"title":"Posi-Turner: Model numbers – 10LS-250 or equal to","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-15T15:58:47.486Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"b50574115931450dbef929bef239b319","solicitation_number":"W911RQ26QA018","parent_opportunity_id":"22514ee8b8d449789ac856e028cf9105"},{"index":1,"title":"Posi-Turner: Model numbers – 10LS-250 or equal to","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-10T19:29:58.855Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"22514ee8b8d449789ac856e028cf9105","solicitation_number":"W911RQ26QA018"}],"contacts":[{"name":"Aeric Miller","role":"primary","email":"Aeric.p.miller.civ@army.mil","phone":"5206844368"},{"name":"Travis Peterson","role":"secondary","email":"travis.n.peterson2.civ@army.mil","phone":"5715881517"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"22514ee8b8d449789ac856e028cf9105","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"22514ee8b8d449789ac856e028cf9105","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-16T11:04:06.762332193Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T07:50:12.777658Z","row_sha256":"fc107d236a27986060219cc48aecdc1a8d22f132a8c0e93fddcbeaab996913a0","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-16T11:04:06.762332193Z","first_seen_at":"2026-09-15T22:52:52.472456Z"},"description":{"html":"<p><strong>Purchase Description (PD)</strong></p>\n\n<p><strong>Position Turner for Large Hulls</strong></p>\n\n<p><strong>Surface Support Division, B343 Shop</strong></p>\n\n<p><strong>Red River Army Depot (RRAD)</strong></p>\n\n<p><strong>Texarkana, TX 75507-5000</strong></p>\n\n<p><strong>11 August 2026</strong></p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>1.0&nbsp; Scope. </strong>&nbsp;This PD is to define the specifications necessary to award a contract for a 1 EA Position(Posi)-Turner: Model numbers &ndash; 10LS-250 or equal to, will be for the Directorate for Maintenance in the Welding Shop section, Bldg. 343 in support of the Bradley/MLRS fleet expansion effort. Contractor shall perform any/all site preparation needed for new equipment. Site preparation may include delivery of new equipment, offloading and positioning of new equipment, planning and designing, fabrication, and commissioning necessary to furnish one Posi-Turner to the Welding Shop.</p>\n\n<p></p>\n\n<p><strong>2.0&nbsp; Requirements.</strong></p>\n\n<p></p>\n\n<p>The following salient characteristics are the minimum requirements for any proposed items being offered:</p>\n\n<p></p>\n\n<p>Capacity: 10,000 lbs.</p>\n\n<p>- Unit includes the &quot;Leveler&quot; that adjusts the center-of-gravity under the hook to balance the load with pushbutton control</p>\n\n<p>- Bail adjusts 6&quot; +/- either side of center (bail = 4.3&quot; x 7.5&quot;)</p>\n\n<p>- Maximum sling spacing: 251&quot;</p>\n\n<p>- Minimum sling spacing: 14.25&quot;</p>\n\n<p>- Heavy duty non-slip surface on drum</p>\n\n<p>- Heavy duty drive package</p>\n\n<p>- Power required: 460/3/60 (power to be supplied from crane)</p>\n\n<p>- Includes operator pendant with 20&#39;-0 cord.</p>\n\n<p>- System to be used with a single crane/hoist hook</p>\n\n<p>- Estimated unit weight: 4765 lbs.</p>\n\n<p>- Estimated system height: 49&quot; (base to hook)</p>\n\n<p>- Painted standard Caldwell yellow</p>\n\n<p>- Meets ASME B30.20, BTH-1 design standards; design category &quot;B&quot;, service class &quot;2&quot;.</p>\n\n<p></p>\n\n<p><strong>3.0&nbsp; Installation Schedule. </strong>&nbsp;The Posi-Turner shall be delivered, installed and operational at building 343, Red River Army Depot.</p>\n\n<p></p>\n\n<p>RRAD works a four-day, ten-hour workweek, Mon-Thurs, 0630-1700.&nbsp; Working Friday is not guaranteed but will be taken into consideration.&nbsp; The contractor may request to work Friday with 48 hours prior notice to RRAD POC.&nbsp; RRAD will be closed on all Federal Holidays which are:</p>\n\n<p>New Year&rsquo;s Day</p>\n\n<p>Martin Luther King Birthday</p>\n\n<p>President&rsquo;s Day</p>\n\n<p>Memorial Day</p>\n\n<p>Juneteenth</p>\n\n<p>Independence Day</p>\n\n<p>Labor Day</p>\n\n<p>Columbus Day</p>\n\n<p>Veteran&rsquo;s Day</p>\n\n<p>Thanksgiving Day</p>\n\n<p>Christmas Day</p>\n\n<p></p>\n\n<p><strong>4.0 Final Acceptance Testing</strong></p>\n\n<p></p>\n\n<p>A final acceptance run-off shall be performed. The runoff shall demonstrate the system&rsquo;s ability to lift, roll over, and position 2 EA MLRS Hulls without failure. The test shall consist of the designed by RRAD personnel with no failures. Government will furnish the MLRS Hulls for the final acceptance testing</p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>5.0 Technical Manuals </strong></p>\n\n<p></p>\n\n<p>Technical Manuals and Parts List: Contractor shall provide two (2) hard copies and one electronic copy on CD/DVD of operations sequence, system program, Bill of Materials (BOM), wiring diagrams/schematics, maintenance manuals for contractor installed equipment including calibration information and procedures where applicable. all operator and maintenance manuals.</p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p>RESPONSIBILITIES</p>\n\n<p></p>\n\n<p>Government&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Contractor</p>\n\n<p></p>\n\n<p>&nbsp;&nbsp;&nbsp; ()&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (XX)&nbsp;&nbsp;&nbsp; a.&nbsp; Furnish labor and material handling equipment for</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp; off-loading and placing items on foundation.</p>\n\n<p></p>\n\n<p>&nbsp;&nbsp;&nbsp; ()&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (XX)&nbsp;&nbsp;&nbsp; b.&nbsp; Set and level the machine components on its</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp; foundation.</p>\n\n<p></p>\n\n<p>&nbsp;&nbsp;&nbsp; ()&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (XX)&nbsp;&nbsp;&nbsp; c.&nbsp; Provide and install anchor bolts and nuts.</p>\n\n<p></p>\n\n<p>&nbsp;&nbsp;&nbsp; ()&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (XX)&nbsp;&nbsp;&nbsp; d.&nbsp; Connect machine to the provided utilities hook-up.</p>\n\n<p></p>\n\n<p>&nbsp;&nbsp;&nbsp; ()&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (XX)&nbsp;&nbsp;&nbsp; e.&nbsp; Provide all necessary materials, tools, gages and</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp; instrumentation necessary to perform the required tests.</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp; Material and tooling required for the performance testing at</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp; Government facility.</p>\n\n<p></p>\n\n<p>&nbsp;&nbsp;&nbsp; ()&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (XX)&nbsp;&nbsp;&nbsp; f.&nbsp; Provide and charge all systems with fluids in accordance with</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp; manufacturer&#39;s instructions.</p>\n\n<p></p>\n\n<p>&nbsp;&nbsp;&nbsp; (XX)&nbsp;&nbsp;&nbsp; ()&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; g.&nbsp; Provide unobstructed utilities hook-up within 20 feet of</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp; system.</p>\n\n<p></p>","text":"Purchase Description (PD)\n\nPosition Turner for Large Hulls\n\nSurface Support Division, B343 Shop\n\nRed River Army Depot (RRAD)\n\nTexarkana, TX 75507-5000\n\n11 August 2026\n\n1.0 Scope. This PD is to define the specifications necessary to award a contract for a 1 EA Position(Posi)-Turner: Model numbers – 10LS-250 or equal to, will be for the Directorate for Maintenance in the Welding Shop section, Bldg. 343 in support of the Bradley/MLRS fleet expansion effort. Contractor shall perform any/all site preparation needed for new equipment. Site preparation may include delivery of new equipment, offloading and positioning of new equipment, planning and designing, fabrication, and commissioning necessary to furnish one Posi-Turner to the Welding Shop.\n\n2.0 Requirements.\n\nThe following salient characteristics are the minimum requirements for any proposed items being offered:\n\nCapacity: 10,000 lbs.\n\n- Unit includes the \"Leveler\" that adjusts the center-of-gravity under the hook to balance the load with pushbutton control\n\n- Bail adjusts 6\" +/- either side of center (bail = 4.3\" x 7.5\")\n\n- Maximum sling spacing: 251\"\n\n- Minimum sling spacing: 14.25\"\n\n- Heavy duty non-slip surface on drum\n\n- Heavy duty drive package\n\n- Power required: 460/3/60 (power to be supplied from crane)\n\n- Includes operator pendant with 20'-0 cord.\n\n- System to be used with a single crane/hoist hook\n\n- Estimated unit weight: 4765 lbs.\n\n- Estimated system height: 49\" (base to hook)\n\n- Painted standard Caldwell yellow\n\n- Meets ASME B30.20, BTH-1 design standards; design category \"B\", service class \"2\".\n\n3.0 Installation Schedule. The Posi-Turner shall be delivered, installed and operational at building 343, Red River Army Depot.\n\nRRAD works a four-day, ten-hour workweek, Mon-Thurs, 0630-1700. Working Friday is not guaranteed but will be taken into consideration. The contractor may request to work Friday with 48 hours prior notice to RRAD POC. RRAD will be closed on all Federal Holidays which are:\n\nNew Year’s Day\n\nMartin Luther King Birthday\n\nPresident’s Day\n\nMemorial Day\n\nJuneteenth\n\nIndependence Day\n\nLabor Day\n\nColumbus Day\n\nVeteran’s Day\n\nThanksgiving Day\n\nChristmas Day\n\n4.0 Final Acceptance Testing\n\nA final acceptance run-off shall be performed. The runoff shall demonstrate the system’s ability to lift, roll over, and position 2 EA MLRS Hulls without failure. The test shall consist of the designed by RRAD personnel with no failures. Government will furnish the MLRS Hulls for the final acceptance testing\n\n5.0 Technical Manuals\n\nTechnical Manuals and Parts List: Contractor shall provide two (2) hard copies and one electronic copy on CD/DVD of operations sequence, system program, Bill of Materials (BOM), wiring diagrams/schematics, maintenance manuals for contractor installed equipment including calibration information and procedures where applicable. all operator and maintenance manuals.\n\nRESPONSIBILITIES\n\nGovernment Contractor\n\n() (XX) a. Furnish labor and material handling equipment for\n\noff-loading and placing items on foundation.\n\n() (XX) b. Set and level the machine components on its\n\nfoundation.\n\n() (XX) c. Provide and install anchor bolts and nuts.\n\n() (XX) d. Connect machine to the provided utilities hook-up.\n\n() (XX) e. Provide all necessary materials, tools, gages and\n\ninstrumentation necessary to perform the required tests.\n\nMaterial and tooling required for the performance testing at\n\nGovernment facility.\n\n() (XX) f. Provide and charge all systems with fluids in accordance with\n\nmanufacturer's instructions.\n\n(XX) () g. Provide unobstructed utilities hook-up within 20 feet of\n\nsystem.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"W911RQ26QA018","place_of_performance":{"zip":"75505","city":{"code":"72368","name":"Texarkana"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"4910"},{"dates":{"posted":"2026-09-15","posted_at":"2026-09-15T15:58:47.486Z","created_at":"2026-09-15T15:57:12.525Z","modified_at":"2026-09-15T15:58:47.493Z","response_deadline":{"raw":"2026-09-28T13:00:00-05:00","utc":"2026-09-28T18:00:00Z","date":"2026-09-28","time":"13:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/b50574115931450dbef929bef239b319/view"},"naics":{"codes":["333998"],"primary":"333998"},"title":"Posi-Turner: Model numbers – 10LS-250 or equal to","agency":{"office":{"code":"W911RQ","name":"W6QK ACC RRAD"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"75507-5000","city":"TEXARKANA","state":"TX","country":"USA"},"organization_id":"500045566","organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-10-13","archive_type":"auto15"},"history":[{"index":2,"title":"Posi-Turner: Model numbers – 10LS-250 or equal to","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-15T15:58:47.486Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"b50574115931450dbef929bef239b319","solicitation_number":"W911RQ26QA018","parent_opportunity_id":"22514ee8b8d449789ac856e028cf9105"},{"index":1,"title":"Posi-Turner: Model numbers – 10LS-250 or equal to","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-10T19:29:58.855Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"22514ee8b8d449789ac856e028cf9105","solicitation_number":"W911RQ26QA018"}],"contacts":[{"name":"Aeric Miller","role":"primary","email":"Aeric.p.miller.civ@army.mil","phone":"5206844368"},{"name":"Travis Peterson","role":"secondary","email":"travis.n.peterson2.civ@army.mil","phone":"5715881517"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"b50574115931450dbef929bef239b319","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"22514ee8b8d449789ac856e028cf9105","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-16T08:46:12.639771770Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T07:50:12.777658Z","row_sha256":"f6829f4a5c7eb2659f37277c9891073f9594a4197cbe6412b00c7627cc9cd727","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-16T08:46:12.639771770Z","first_seen_at":"2026-09-16T07:50:12.777658Z"},"description":{"html":"<p><strong>Purchase Description (PD)</strong></p>\n\n<p><strong>Position Turner for Large Hulls</strong></p>\n\n<p><strong>Surface Support Division, B343 Shop</strong></p>\n\n<p><strong>Red River Army Depot (RRAD)</strong></p>\n\n<p><strong>Texarkana, TX 75507-5000</strong></p>\n\n<p><strong>11 August 2026</strong></p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>1.0&nbsp; Scope. </strong>&nbsp;This PD is to define the specifications necessary to award a contract for a 1 EA Position(Posi)-Turner: Model numbers &ndash; 10LS-250 or equal to, will be for the Directorate for Maintenance in the Welding Shop section, Bldg. 343 in support of the Bradley/MLRS fleet expansion effort. Contractor shall perform any/all site preparation needed for new equipment. Site preparation may include delivery of new equipment, offloading and positioning of new equipment, planning and designing, fabrication, and commissioning necessary to furnish one Posi-Turner to the Welding Shop.</p>\n\n<p></p>\n\n<p><strong>2.0&nbsp; Requirements.</strong></p>\n\n<p></p>\n\n<p>The following salient characteristics are the minimum requirements for any proposed items being offered:</p>\n\n<p></p>\n\n<p>Capacity: 10,000 lbs.</p>\n\n<p>- Unit includes the &quot;Leveler&quot; that adjusts the center-of-gravity under the hook to balance the load with pushbutton control</p>\n\n<p>- Bail adjusts 6&quot; +/- either side of center (bail = 4.3&quot; x 7.5&quot;)</p>\n\n<p>- Maximum sling spacing: 251&quot;</p>\n\n<p>- Minimum sling spacing: 14.25&quot;</p>\n\n<p>- Heavy duty non-slip surface on drum</p>\n\n<p>- Heavy duty drive package</p>\n\n<p>- Power required: 460/3/60 (power to be supplied from crane)</p>\n\n<p>- Includes operator pendant with 20&#39;-0 cord.</p>\n\n<p>- System to be used with a single crane/hoist hook</p>\n\n<p>- Estimated unit weight: 4765 lbs.</p>\n\n<p>- Estimated system height: 49&quot; (base to hook)</p>\n\n<p>- Painted standard Caldwell yellow</p>\n\n<p>- Meets ASME B30.20, BTH-1 design standards; design category &quot;B&quot;, service class &quot;2&quot;.</p>\n\n<p></p>\n\n<p><strong>3.0&nbsp; Installation Schedule. </strong>&nbsp;The Posi-Turner shall be delivered, installed and operational at building 343, Red River Army Depot.</p>\n\n<p></p>\n\n<p>RRAD works a four-day, ten-hour workweek, Mon-Thurs, 0630-1700.&nbsp; Working Friday is not guaranteed but will be taken into consideration.&nbsp; The contractor may request to work Friday with 48 hours prior notice to RRAD POC.&nbsp; RRAD will be closed on all Federal Holidays which are:</p>\n\n<p>New Year&rsquo;s Day</p>\n\n<p>Martin Luther King Birthday</p>\n\n<p>President&rsquo;s Day</p>\n\n<p>Memorial Day</p>\n\n<p>Juneteenth</p>\n\n<p>Independence Day</p>\n\n<p>Labor Day</p>\n\n<p>Columbus Day</p>\n\n<p>Veteran&rsquo;s Day</p>\n\n<p>Thanksgiving Day</p>\n\n<p>Christmas Day</p>\n\n<p></p>\n\n<p><strong>4.0 Final Acceptance Testing</strong></p>\n\n<p></p>\n\n<p>A final acceptance run-off shall be performed. The runoff shall demonstrate the system&rsquo;s ability to lift, roll over, and position 2 EA MLRS Hulls without failure. The test shall consist of the designed by RRAD personnel with no failures. Government will furnish the MLRS Hulls for the final acceptance testing</p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>5.0 Technical Manuals </strong></p>\n\n<p></p>\n\n<p>Technical Manuals and Parts List: Contractor shall provide two (2) hard copies and one electronic copy on CD/DVD of operations sequence, system program, Bill of Materials (BOM), wiring diagrams/schematics, maintenance manuals for contractor installed equipment including calibration information and procedures where applicable. all operator and maintenance manuals.</p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p>RESPONSIBILITIES</p>\n\n<p></p>\n\n<p>Government&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Contractor</p>\n\n<p></p>\n\n<p>&nbsp;&nbsp;&nbsp; ()&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (XX)&nbsp;&nbsp;&nbsp; a.&nbsp; Furnish labor and material handling equipment for</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp; off-loading and placing items on foundation.</p>\n\n<p></p>\n\n<p>&nbsp;&nbsp;&nbsp; ()&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (XX)&nbsp;&nbsp;&nbsp; b.&nbsp; Set and level the machine components on its</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp; foundation.</p>\n\n<p></p>\n\n<p>&nbsp;&nbsp;&nbsp; ()&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (XX)&nbsp;&nbsp;&nbsp; c.&nbsp; Provide and install anchor bolts and nuts.</p>\n\n<p></p>\n\n<p>&nbsp;&nbsp;&nbsp; ()&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (XX)&nbsp;&nbsp;&nbsp; d.&nbsp; Connect machine to the provided utilities hook-up.</p>\n\n<p></p>\n\n<p>&nbsp;&nbsp;&nbsp; ()&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (XX)&nbsp;&nbsp;&nbsp; e.&nbsp; Provide all necessary materials, tools, gages and</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp; instrumentation necessary to perform the required tests.</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp; Material and tooling required for the performance testing at</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp; Government facility.</p>\n\n<p></p>\n\n<p>&nbsp;&nbsp;&nbsp; ()&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (XX)&nbsp;&nbsp;&nbsp; f.&nbsp; Provide and charge all systems with fluids in accordance with</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp; manufacturer&#39;s instructions.</p>\n\n<p></p>\n\n<p>&nbsp;&nbsp;&nbsp; (XX)&nbsp;&nbsp;&nbsp; ()&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; g.&nbsp; Provide unobstructed utilities hook-up within 20 feet of</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp; system.</p>\n\n<p></p>","text":"Purchase Description (PD)\n\nPosition Turner for Large Hulls\n\nSurface Support Division, B343 Shop\n\nRed River Army Depot (RRAD)\n\nTexarkana, TX 75507-5000\n\n11 August 2026\n\n1.0 Scope. This PD is to define the specifications necessary to award a contract for a 1 EA Position(Posi)-Turner: Model numbers – 10LS-250 or equal to, will be for the Directorate for Maintenance in the Welding Shop section, Bldg. 343 in support of the Bradley/MLRS fleet expansion effort. Contractor shall perform any/all site preparation needed for new equipment. Site preparation may include delivery of new equipment, offloading and positioning of new equipment, planning and designing, fabrication, and commissioning necessary to furnish one Posi-Turner to the Welding Shop.\n\n2.0 Requirements.\n\nThe following salient characteristics are the minimum requirements for any proposed items being offered:\n\nCapacity: 10,000 lbs.\n\n- Unit includes the \"Leveler\" that adjusts the center-of-gravity under the hook to balance the load with pushbutton control\n\n- Bail adjusts 6\" +/- either side of center (bail = 4.3\" x 7.5\")\n\n- Maximum sling spacing: 251\"\n\n- Minimum sling spacing: 14.25\"\n\n- Heavy duty non-slip surface on drum\n\n- Heavy duty drive package\n\n- Power required: 460/3/60 (power to be supplied from crane)\n\n- Includes operator pendant with 20'-0 cord.\n\n- System to be used with a single crane/hoist hook\n\n- Estimated unit weight: 4765 lbs.\n\n- Estimated system height: 49\" (base to hook)\n\n- Painted standard Caldwell yellow\n\n- Meets ASME B30.20, BTH-1 design standards; design category \"B\", service class \"2\".\n\n3.0 Installation Schedule. The Posi-Turner shall be delivered, installed and operational at building 343, Red River Army Depot.\n\nRRAD works a four-day, ten-hour workweek, Mon-Thurs, 0630-1700. Working Friday is not guaranteed but will be taken into consideration. The contractor may request to work Friday with 48 hours prior notice to RRAD POC. RRAD will be closed on all Federal Holidays which are:\n\nNew Year’s Day\n\nMartin Luther King Birthday\n\nPresident’s Day\n\nMemorial Day\n\nJuneteenth\n\nIndependence Day\n\nLabor Day\n\nColumbus Day\n\nVeteran’s Day\n\nThanksgiving Day\n\nChristmas Day\n\n4.0 Final Acceptance Testing\n\nA final acceptance run-off shall be performed. The runoff shall demonstrate the system’s ability to lift, roll over, and position 2 EA MLRS Hulls without failure. The test shall consist of the designed by RRAD personnel with no failures. Government will furnish the MLRS Hulls for the final acceptance testing\n\n5.0 Technical Manuals\n\nTechnical Manuals and Parts List: Contractor shall provide two (2) hard copies and one electronic copy on CD/DVD of operations sequence, system program, Bill of Materials (BOM), wiring diagrams/schematics, maintenance manuals for contractor installed equipment including calibration information and procedures where applicable. all operator and maintenance manuals.\n\nRESPONSIBILITIES\n\nGovernment Contractor\n\n() (XX) a. Furnish labor and material handling equipment for\n\noff-loading and placing items on foundation.\n\n() (XX) b. Set and level the machine components on its\n\nfoundation.\n\n() (XX) c. Provide and install anchor bolts and nuts.\n\n() (XX) d. Connect machine to the provided utilities hook-up.\n\n() (XX) e. Provide all necessary materials, tools, gages and\n\ninstrumentation necessary to perform the required tests.\n\nMaterial and tooling required for the performance testing at\n\nGovernment facility.\n\n() (XX) f. Provide and charge all systems with fluids in accordance with\n\nmanufacturer's instructions.\n\n(XX) () g. Provide unobstructed utilities hook-up within 20 feet of\n\nsystem.","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"W911RQ26QA018","place_of_performance":{"zip":"75505","city":{"code":"72368","name":"Texarkana"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"4910"}],"due_at":"2026-09-28T18:00:00Z","due_date":"2026-09-28","closes_at":"2026-09-28T18:00:00Z","awardable":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W911RQ","office_name":"W6QK ACC RRAD","state":"TX","country":"USA","winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T07:50:43.959643Z","principal_notice_id":"b50574115931450dbef929bef239b319","description":{"text":"Purchase Description (PD)\n\nPosition Turner for Large Hulls\n\nSurface Support Division, B343 Shop\n\nRed River Army Depot (RRAD)\n\nTexarkana, TX 75507-5000\n\n11 August 2026\n\n1.0 Scope. This PD is to define the specifications necessary to award a contract for a 1 EA Position(Posi)-Turner: Model numbers – 10LS-250 or equal to, will be for the Directorate for Maintenance in the Welding Shop section, Bldg. 343 in support of the Bradley/MLRS fleet expansion effort. Contractor shall perform any/all site preparation needed for new equipment. Site preparation may include delivery of new equipment, offloading and positioning of new equipment, planning and designing, fabrication, and commissioning necessary to furnish one Posi-Turner to the Welding Shop.\n\n2.0 Requirements.\n\nThe following salient characteristics are the minimum requirements for any proposed items being offered:\n\nCapacity: 10,000 lbs.\n\n- Unit includes the \"Leveler\" that adjusts the center-of-gravity under the hook to balance the load with pushbutton control\n\n- Bail adjusts 6\" +/- either side of center (bail = 4.3\" x 7.5\")\n\n- Maximum sling spacing: 251\"\n\n- Minimum sling spacing: 14.25\"\n\n- Heavy duty non-slip surface on drum\n\n- Heavy duty drive package\n\n- Power required: 460/3/60 (power to be supplied from crane)\n\n- Includes operator pendant with 20'-0 cord.\n\n- System to be used with a single crane/hoist hook\n\n- Estimated unit weight: 4765 lbs.\n\n- Estimated system height: 49\" (base to hook)\n\n- Painted standard Caldwell yellow\n\n- Meets ASME B30.20, BTH-1 design standards; design category \"B\", service class \"2\".\n\n3.0 Installation Schedule. The Posi-Turner shall be delivered, installed and operational at building 343, Red River Army Depot.\n\nRRAD works a four-day, ten-hour workweek, Mon-Thurs, 0630-1700. Working Friday is not guaranteed but will be taken into consideration. The contractor may request to work Friday with 48 hours prior notice to RRAD POC. RRAD will be closed on all Federal Holidays which are:\n\nNew Year’s Day\n\nMartin Luther King Birthday\n\nPresident’s Day\n\nMemorial Day\n\nJuneteenth\n\nIndependence Day\n\nLabor Day\n\nColumbus Day\n\nVeteran’s Day\n\nThanksgiving Day\n\nChristmas Day\n\n4.0 Final Acceptance Testing\n\nA final acceptance run-off shall be performed. The runoff shall demonstrate the system’s ability to lift, roll over, and position 2 EA MLRS Hulls without failure. The test shall consist of the designed by RRAD personnel with no failures. Government will furnish the MLRS Hulls for the final acceptance testing\n\n5.0 Technical Manuals\n\nTechnical Manuals and Parts List: Contractor shall provide two (2) hard copies and one electronic copy on CD/DVD of operations sequence, system program, Bill of Materials (BOM), wiring diagrams/schematics, maintenance manuals for contractor installed equipment including calibration information and procedures where applicable. all operator and maintenance manuals.\n\nRESPONSIBILITIES\n\nGovernment Contractor\n\n() (XX) a. Furnish labor and material handling equipment for\n\noff-loading and placing items on foundation.\n\n() (XX) b. Set and level the machine components on its\n\nfoundation.\n\n() (XX) c. Provide and install anchor bolts and nuts.\n\n() (XX) d. Connect machine to the provided utilities hook-up.\n\n() (XX) e. Provide all necessary materials, tools, gages and\n\ninstrumentation necessary to perform the required tests.\n\nMaterial and tooling required for the performance testing at\n\nGovernment facility.\n\n() (XX) f. Provide and charge all systems with fluids in accordance with\n\nmanufacturer's instructions.\n\n(XX) () g. Provide unobstructed utilities hook-up within 20 feet of\n\nsystem.","html":"<p><strong>Purchase Description (PD)</strong></p>\n\n<p><strong>Position Turner for Large Hulls</strong></p>\n\n<p><strong>Surface Support Division, B343 Shop</strong></p>\n\n<p><strong>Red River Army Depot (RRAD)</strong></p>\n\n<p><strong>Texarkana, TX 75507-5000</strong></p>\n\n<p><strong>11 August 2026</strong></p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>1.0&nbsp; Scope. </strong>&nbsp;This PD is to define the specifications necessary to award a contract for a 1 EA Position(Posi)-Turner: Model numbers &ndash; 10LS-250 or equal to, will be for the Directorate for Maintenance in the Welding Shop section, Bldg. 343 in support of the Bradley/MLRS fleet expansion effort. Contractor shall perform any/all site preparation needed for new equipment. Site preparation may include delivery of new equipment, offloading and positioning of new equipment, planning and designing, fabrication, and commissioning necessary to furnish one Posi-Turner to the Welding Shop.</p>\n\n<p></p>\n\n<p><strong>2.0&nbsp; Requirements.</strong></p>\n\n<p></p>\n\n<p>The following salient characteristics are the minimum requirements for any proposed items being offered:</p>\n\n<p></p>\n\n<p>Capacity: 10,000 lbs.</p>\n\n<p>- Unit includes the &quot;Leveler&quot; that adjusts the center-of-gravity under the hook to balance the load with pushbutton control</p>\n\n<p>- Bail adjusts 6&quot; +/- either side of center (bail = 4.3&quot; x 7.5&quot;)</p>\n\n<p>- Maximum sling spacing: 251&quot;</p>\n\n<p>- Minimum sling spacing: 14.25&quot;</p>\n\n<p>- Heavy duty non-slip surface on drum</p>\n\n<p>- Heavy duty drive package</p>\n\n<p>- Power required: 460/3/60 (power to be supplied from crane)</p>\n\n<p>- Includes operator pendant with 20&#39;-0 cord.</p>\n\n<p>- System to be used with a single crane/hoist hook</p>\n\n<p>- Estimated unit weight: 4765 lbs.</p>\n\n<p>- Estimated system height: 49&quot; (base to hook)</p>\n\n<p>- Painted standard Caldwell yellow</p>\n\n<p>- Meets ASME B30.20, BTH-1 design standards; design category &quot;B&quot;, service class &quot;2&quot;.</p>\n\n<p></p>\n\n<p><strong>3.0&nbsp; Installation Schedule. </strong>&nbsp;The Posi-Turner shall be delivered, installed and operational at building 343, Red River Army Depot.</p>\n\n<p></p>\n\n<p>RRAD works a four-day, ten-hour workweek, Mon-Thurs, 0630-1700.&nbsp; Working Friday is not guaranteed but will be taken into consideration.&nbsp; The contractor may request to work Friday with 48 hours prior notice to RRAD POC.&nbsp; RRAD will be closed on all Federal Holidays which are:</p>\n\n<p>New Year&rsquo;s Day</p>\n\n<p>Martin Luther King Birthday</p>\n\n<p>President&rsquo;s Day</p>\n\n<p>Memorial Day</p>\n\n<p>Juneteenth</p>\n\n<p>Independence Day</p>\n\n<p>Labor Day</p>\n\n<p>Columbus Day</p>\n\n<p>Veteran&rsquo;s Day</p>\n\n<p>Thanksgiving Day</p>\n\n<p>Christmas Day</p>\n\n<p></p>\n\n<p><strong>4.0 Final Acceptance Testing</strong></p>\n\n<p></p>\n\n<p>A final acceptance run-off shall be performed. The runoff shall demonstrate the system&rsquo;s ability to lift, roll over, and position 2 EA MLRS Hulls without failure. The test shall consist of the designed by RRAD personnel with no failures. Government will furnish the MLRS Hulls for the final acceptance testing</p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>5.0 Technical Manuals </strong></p>\n\n<p></p>\n\n<p>Technical Manuals and Parts List: Contractor shall provide two (2) hard copies and one electronic copy on CD/DVD of operations sequence, system program, Bill of Materials (BOM), wiring diagrams/schematics, maintenance manuals for contractor installed equipment including calibration information and procedures where applicable. all operator and maintenance manuals.</p>\n\n<p></p>\n\n<p></p>\n\n<p></p>\n\n<p>RESPONSIBILITIES</p>\n\n<p></p>\n\n<p>Government&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Contractor</p>\n\n<p></p>\n\n<p>&nbsp;&nbsp;&nbsp; ()&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (XX)&nbsp;&nbsp;&nbsp; a.&nbsp; Furnish labor and material handling equipment for</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp; off-loading and placing items on foundation.</p>\n\n<p></p>\n\n<p>&nbsp;&nbsp;&nbsp; ()&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (XX)&nbsp;&nbsp;&nbsp; b.&nbsp; Set and level the machine components on its</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp; foundation.</p>\n\n<p></p>\n\n<p>&nbsp;&nbsp;&nbsp; ()&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (XX)&nbsp;&nbsp;&nbsp; c.&nbsp; Provide and install anchor bolts and nuts.</p>\n\n<p></p>\n\n<p>&nbsp;&nbsp;&nbsp; ()&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (XX)&nbsp;&nbsp;&nbsp; d.&nbsp; Connect machine to the provided utilities hook-up.</p>\n\n<p></p>\n\n<p>&nbsp;&nbsp;&nbsp; ()&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (XX)&nbsp;&nbsp;&nbsp; e.&nbsp; Provide all necessary materials, tools, gages and</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp; instrumentation necessary to perform the required tests.</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp; Material and tooling required for the performance testing at</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp; Government facility.</p>\n\n<p></p>\n\n<p>&nbsp;&nbsp;&nbsp; ()&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (XX)&nbsp;&nbsp;&nbsp; f.&nbsp; Provide and charge all systems with fluids in accordance with</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp; manufacturer&#39;s instructions.</p>\n\n<p></p>\n\n<p>&nbsp;&nbsp;&nbsp; (XX)&nbsp;&nbsp;&nbsp; ()&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; g.&nbsp; Provide unobstructed utilities hook-up within 20 feet of</p>\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp; system.</p>\n\n<p></p>","origin":"detail"},"contacts":[{"name":"Aeric Miller","role":"primary","email":"Aeric.p.miller.civ@army.mil","phone":"5206844368"},{"name":"Travis Peterson","role":"secondary","email":"travis.n.peterson2.civ@army.mil","phone":"5715881517"}],"place_of_performance":{"zip":"75505","city":{"code":"72368","name":"Texarkana"},"state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"75507-5000","city":"TEXARKANA","state":"TX","country":"USA"},"naics_codes":["333998"],"award":null,"attachments":[{"resource_id":"f0b3aab2cf4747e4b890f1388e490db2","name":"Combo SOL Positurner 2.1.pdf","kind":"file","mime_type":".pdf","size_bytes":248657,"posted_at":"2026-09-10T19:29:58.855Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f0b3aab2cf4747e4b890f1388e490db2/download","mirrored":false}],"awards":[],"related":[{"key":"PANDTA26P0000033811","latest_notice_id":"65ffbfd48275495c9687076683f91aa8","title":"Manufacture and supply of T-142 Track Shoe Block","solicitation_number":"PANDTA26P0000_033811","notice_type":"p","first_type":"p","first_posted":"2026-04-09","last_posted":"2026-04-09","notices":1,"due_at":"2029-04-14T20:00:00Z","due_date":"2029-04-14","closes_at":"2029-04-14T20:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W911RQ","office_name":"W6QK ACC RRAD","naics":"332111","psc":"2530","set_aside":"SBA","state":"TX","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T17:40:17.704408Z"}]}