{"canonical":"https://abierto.us/opportunities/w51dqv25ra004","key":"W51DQV25RA004","url":"https://abierto.us/opportunities/w51dqv25ra004","title":"CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION","solicitation_number":"W51DQV25RA004","notice_type":"a","open":false,"response_deadline":"2025-08-11T15:00:00Z","first_posted":"2025-04-08","last_posted":"2025-09-30","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"W2SR ENDIST CARIBBEAN(PROVIS)","naics":"237990","psc":"Z2KB","set_aside":null,"place_state":"PR","place_county":"72127","place_county_name":"San Juan Municipio","place_city":"7276770","place_city_name":"San Juan","winner":"NOVEL CONSTRUCTION LLC 1738 CALLE AMARILLO SUITE 205 BOX 15 San Juan","award_amount":"57427000","publications":[{"notice_id":"6fc59239db8c4bd3aadd552d4ce6cd74","title":"CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION","solicitation_number":"W51DQV25RA004","notice_type":"o","base_type":"o","posted":"2025-04-08","posted_at":null,"due_at":"2025-06-17T18:00:00Z","due_date":"2025-06-17","cancelled":null,"archived":null,"archive_date":"2025-10-05","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/6fc59239db8c4bd3aadd552d4ce6cd74/view","enriched":false,"history":[]},{"notice_id":"b613728e6ade4cfd9d75a7204ddde678","title":"CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION","solicitation_number":"W51DQV25RA004","notice_type":"o","base_type":"o","posted":"2025-04-25","posted_at":null,"due_at":"2025-06-17T18:00:00Z","due_date":"2025-06-17","cancelled":null,"archived":null,"archive_date":"2025-10-05","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/b613728e6ade4cfd9d75a7204ddde678/view","enriched":false,"history":[]},{"notice_id":"c036a35e63bf4b148caa5b4cd2f936d2","title":"CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION","solicitation_number":"W51DQV25RA004","notice_type":"o","base_type":"o","posted":"2025-05-07","posted_at":null,"due_at":"2025-06-17T18:00:00Z","due_date":"2025-06-17","cancelled":null,"archived":null,"archive_date":"2025-10-05","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/c036a35e63bf4b148caa5b4cd2f936d2/view","enriched":false,"history":[]},{"notice_id":"cae938f6341a40eeabf7988ce6ef176c","title":"CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION","solicitation_number":"W51DQV25RA004","notice_type":"o","base_type":"o","posted":"2025-06-05","posted_at":null,"due_at":"2025-07-07T16:00:00Z","due_date":"2025-07-07","cancelled":null,"archived":null,"archive_date":"2025-07-22","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/cae938f6341a40eeabf7988ce6ef176c/view","enriched":false,"history":[]},{"notice_id":"2683a2f1a437436fbb57386301efa01f","title":"CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION","solicitation_number":"W51DQV25RA004","notice_type":"o","base_type":"o","posted":"2025-06-08","posted_at":null,"due_at":"2025-07-07T16:00:00Z","due_date":"2025-07-07","cancelled":null,"archived":null,"archive_date":"2025-07-22","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/2683a2f1a437436fbb57386301efa01f/view","enriched":false,"history":[]},{"notice_id":"7dd36d91b36549268587b2a5da1f62ed","title":"CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION","solicitation_number":"W51DQV25RA004","notice_type":"o","base_type":"o","posted":"2025-06-12","posted_at":null,"due_at":"2025-07-07T15:00:00Z","due_date":"2025-07-07","cancelled":null,"archived":null,"archive_date":"2025-10-05","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/7dd36d91b36549268587b2a5da1f62ed/view","enriched":false,"history":[]},{"notice_id":"bd4cb532676b43978ed1798ede82804a","title":"CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION","solicitation_number":"W51DQV25RA004","notice_type":"o","base_type":"o","posted":"2025-06-23","posted_at":null,"due_at":"2025-07-07T15:00:00Z","due_date":"2025-07-07","cancelled":null,"archived":null,"archive_date":"2025-10-05","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/bd4cb532676b43978ed1798ede82804a/view","enriched":false,"history":[]},{"notice_id":"d96c5c7d7d404c4a8f098b0af46fbca2","title":"CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION","solicitation_number":"W51DQV25RA004","notice_type":"o","base_type":"o","posted":"2025-06-25","posted_at":null,"due_at":"2025-07-30T15:00:00Z","due_date":"2025-07-30","cancelled":null,"archived":null,"archive_date":"2025-10-05","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d96c5c7d7d404c4a8f098b0af46fbca2/view","enriched":false,"history":[]},{"notice_id":"3a57eb8a71a1445992a23a3259843ef2","title":"CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION","solicitation_number":"W51DQV25RA004","notice_type":"o","base_type":"o","posted":"2025-07-11","posted_at":null,"due_at":"2025-07-30T15:00:00Z","due_date":"2025-07-30","cancelled":null,"archived":null,"archive_date":"2025-10-05","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/3a57eb8a71a1445992a23a3259843ef2/view","enriched":false,"history":[]},{"notice_id":"d4db23e48157471c8625231a8605b17c","title":"CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION","solicitation_number":"W51DQV25RA004","notice_type":"o","base_type":"o","posted":"2025-07-28","posted_at":null,"due_at":"2025-08-11T15:00:00Z","due_date":"2025-08-11","cancelled":null,"archived":null,"archive_date":"2025-10-05","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d4db23e48157471c8625231a8605b17c/view","enriched":false,"history":[]},{"notice_id":"fd9dc5df29584d5da00b230b2e65c173","title":"CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION","solicitation_number":"W51DQV25RA004","notice_type":"a","base_type":"o","posted":"2025-09-30","posted_at":null,"due_at":null,"due_date":null,"cancelled":null,"archived":null,"archive_date":"2025-10-05","award_number":"W51DQVCA007","awardee_name":"NOVEL CONSTRUCTION LLC 1738 CALLE AMARILLO SUITE 205 BOX 15 San Juan","amount":"57427000","link_sam":"https://sam.gov/workspace/contract/opp/fd9dc5df29584d5da00b230b2e65c173/view","enriched":false,"history":[]}],"latest_notice_id":"fd9dc5df29584d5da00b230b2e65c173","first_type":"o","notices":[{"dates":{"posted":"2025-04-08","response_deadline":{"raw":"2025-06-17T14:00:00-04:00","utc":"2025-06-17T18:00:00Z","date":"2025-06-17","time":"14:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/6fc59239db8c4bd3aadd552d4ce6cd74/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION","agency":{"office":{"code":"W51DQV","name":"W2SR ENDIST CARIBBEAN(PROVIS)"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"00918-0000","city":"SAN JUAN","state":"PR","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-10-05","archive_type":"auto_custom"},"contacts":[{"name":"Katrina Chapman","role":"primary","email":"katrina.l.chapman@usace.army.mil","phone":"9044012979"},{"name":"Samuela Adams","role":"secondary","email":"samuela.y.adams@usace.army.mil","phone":"8178861168"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"6fc59239db8c4bd3aadd552d4ce6cd74","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"981b1ffb42f1eda2f68aa1247810ab032b23ce23e06778a97eaa2f2fa62068a2","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Material Management Area (MMA), dredging of the Aquatic Disposal Pit (ADP) SJ1A with disposal at ADPs SJ2A, SJ3, and SJ4/5, dredging of 3,000 meters-long access channel across San Jos? Lagoon (SJL), bridge fenders to protect the concrete piers of the Moscoso Bridge near the SJL access channel, dredging of 450 meters-long transition channel between main channel and SJL access channel, dredging of 900 meters long main channel from the Barbosa bridge to San Jose Lagoon transition channel as a wall-stabilized channel composed of steel sheet pile walls with concrete cap along main channel with natural bottom, and construction of an approximately 61 meters-long riprap channel at the Barbosa Bridge to protect the foundation from scour associated with reestablishing flow through the CMP.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W51DQV25RA004","product_service_code":"Z2KB"},{"dates":{"posted":"2025-04-25","response_deadline":{"raw":"2025-06-17T14:00:00-04:00","utc":"2025-06-17T18:00:00Z","date":"2025-06-17","time":"14:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/b613728e6ade4cfd9d75a7204ddde678/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION","agency":{"office":{"code":"W51DQV","name":"W2SR ENDIST CARIBBEAN(PROVIS)"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"00918-0000","city":"SAN JUAN","state":"PR","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-10-05","archive_type":"auto_custom"},"contacts":[{"name":"Katrina Chapman","role":"primary","email":"katrina.l.chapman@usace.army.mil","phone":"9044012979"},{"name":"Samuela Adams","role":"secondary","email":"samuela.y.adams@usace.army.mil","phone":"8178861168"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"b613728e6ade4cfd9d75a7204ddde678","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"89424042260d54536f986d6472a5caaeec99cb91b62019eacc1e83276a4a5d1a","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Material Management Area (MMA), dredging of the Aquatic Disposal Pit (ADP) SJ1A with disposal at ADPs SJ2A, SJ3, and SJ4/5, dredging of 3,000 meters-long access channel across San Jos? Lagoon (SJL), bridge fenders to protect the concrete piers of the Moscoso Bridge near the SJL access channel, dredging of 450 meters-long transition channel between main channel and SJL access channel, dredging of 900 meters long main channel from the Barbosa bridge to San Jose Lagoon transition channel as a wall-stabilized channel composed of steel sheet pile walls with concrete cap along main channel with natural bottom, and construction of an approximately 61 meters-long riprap channel at the Barbosa Bridge to protect the foundation from scour associated with reestablishing flow through the CMP. Amendment 0001: Pre-proposal conference/ Site visit has been amended and changed from May 1, 2025, to May 15, 2025. See amendment 0001 for Site visit instructions.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W51DQV25RA004","place_of_performance":{"zip":"00918","street":"U.S. Army Corps of Engineers, Caribbean District 383 Franklin D. Roosevelt Ave San Juan, Puerto Rico 00918"},"product_service_code":"Z2KB"},{"dates":{"posted":"2025-05-07","response_deadline":{"raw":"2025-06-17T14:00:00-04:00","utc":"2025-06-17T18:00:00Z","date":"2025-06-17","time":"14:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/c036a35e63bf4b148caa5b4cd2f936d2/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION","agency":{"office":{"code":"W51DQV","name":"W2SR ENDIST CARIBBEAN(PROVIS)"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"00918-0000","city":"SAN JUAN","state":"PR","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-10-05","archive_type":"auto_custom"},"contacts":[{"name":"Katrina Chapman","role":"primary","email":"katrina.l.chapman@usace.army.mil","phone":"9044012979"},{"name":"Samuela Adams","role":"secondary","email":"samuela.y.adams@usace.army.mil","phone":"8178861168"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"c036a35e63bf4b148caa5b4cd2f936d2","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"d078988c0b8247f84abc3d8185de3777a101954761711e4211c2b6ae2386abb6","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Material Management Area (MMA), dredging of the Aquatic Disposal Pit (ADP) SJ1A with disposal at ADPs SJ2A, SJ3, and SJ4/5, dredging of 3,000 meters-long access channel across San Jos? Lagoon (SJL), bridge fenders to protect the concrete piers of the Moscoso Bridge near the SJL access channel, dredging of 450 meters-long transition channel between main channel and SJL access channel, dredging of 900 meters long main channel from the Barbosa bridge to San Jose Lagoon transition channel as a wall-stabilized channel composed of steel sheet pile walls with concrete cap along main channel with natural bottom, and construction of an approximately 61 meters-long riprap channel at the Barbosa Bridge to protect the foundation from scour associated with reestablishing flow through the CMP. Amendment 0001: Pre-proposal conference/ Site visit has been amended and changed from May 1, 2025, to May 15, 2025. See amendment 0001 for Site visit instructions.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W51DQV25RA004","place_of_performance":{"zip":"00918","street":"U.S. Army Corps of Engineers, Caribbean District 383 Franklin D. Roosevelt Ave San Juan, Puerto Rico 00918"},"product_service_code":"Z2KB"},{"dates":{"posted":"2025-06-05","response_deadline":{"raw":"2025-07-07T12:00:00-04:00","utc":"2025-07-07T16:00:00Z","date":"2025-07-07","time":"12:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/cae938f6341a40eeabf7988ce6ef176c/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION","agency":{"office":{"code":"W51DQV","name":"W2SR ENDIST CARIBBEAN(PROVIS)"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"00918-0000","city":"SAN JUAN","state":"PR","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-07-22","archive_type":"auto15"},"contacts":[{"name":"Katrina Chapman","role":"primary","email":"katrina.l.chapman@usace.army.mil","phone":"9044012979"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"cae938f6341a40eeabf7988ce6ef176c","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"cc9dcbb8bb1121ec6aee6f037b798b8308f95554642b7b250286181417a8300e","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Material Management Area (MMA), dredging of the Aquatic Disposal Pit (ADP) SJ1A with disposal at ADPs SJ2A, SJ3, and SJ4/5, dredging of 3,000 meters-long access channel across San Jos? Lagoon (SJL), bridge fenders to protect the concrete piers of the Moscoso Bridge near the SJL access channel, dredging of 450 meters-long transition channel between main channel and SJL access channel, dredging of 900 meters long main channel from the Barbosa bridge to San Jose Lagoon transition channel as a wall-stabilized channel composed of steel sheet pile walls with concrete cap along main channel with natural bottom, and construction of an approximately 61 meters-long riprap channel at the Barbosa Bridge to protect the foundation from scour associated with reestablishing flow through the CMP. Amendment 0001: Pre-proposal conference/ Site visit has been amended and changed from May 1, 2025, to May 15, 2025. See amendment 0001 for Site visit instructions. Amendment 0002: Incorporated Aerial Images. Amendment 0003: Incorporate Site Visit Sign-In Sheets and Power Point Slides, Updated Instruction to Offerors.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W51DQV25RA004","place_of_performance":{"zip":"00918","city":{"name":"San Juan"},"state":{"code":"PR"},"street":"U.S. Army Corps of Engineers, Caribbean District 383 Franklin D. Roosevelt Ave San Juan, Puerto Rico 00918","country":{"code":"USA"}},"product_service_code":"Z2KB"},{"dates":{"posted":"2025-06-08","response_deadline":{"raw":"2025-07-07T12:00:00-04:00","utc":"2025-07-07T16:00:00Z","date":"2025-07-07","time":"12:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/2683a2f1a437436fbb57386301efa01f/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION","agency":{"office":{"code":"W51DQV","name":"W2SR ENDIST CARIBBEAN(PROVIS)"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"00918-0000","city":"SAN JUAN","state":"PR","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-07-22","archive_type":"auto15"},"contacts":[{"name":"Katrina Chapman","role":"primary","email":"katrina.l.chapman@usace.army.mil","phone":"9044012979"},{"name":"Anika Hillaire","role":"secondary","email":"anika.c.hillaire@usace.army.mil","phone":"787-200-2330"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"2683a2f1a437436fbb57386301efa01f","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"aba940c1a279a59a17f130c3887ad6946b3060ee56abe5b1def1f533c82fc366","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Material Management Area (MMA), dredging of the Aquatic Disposal Pit (ADP) SJ1A with disposal at ADPs SJ2A, SJ3, and SJ4/5, dredging of 3,000 meters-long access channel across San Jos? Lagoon (SJL), bridge fenders to protect the concrete piers of the Moscoso Bridge near the SJL access channel, dredging of 450 meters-long transition channel between main channel and SJL access channel, dredging of 900 meters long main channel from the Barbosa bridge to San Jose Lagoon transition channel as a wall-stabilized channel composed of steel sheet pile walls with concrete cap along main channel with natural bottom, and construction of an approximately 61 meters-long riprap channel at the Barbosa Bridge to protect the foundation from scour associated with reestablishing flow through the CMP. Amendment 0001: Pre-proposal conference/ Site visit has been amended and changed from May 1, 2025, to May 15, 2025. See amendment 0001 for Site visit instructions. Amendment 0002: Incorporated Aerial Images. Amendment 0003: Incorporate Site Visit Sign-In Sheets and Power Point Slides, Updated Instruction to Offerors.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W51DQV25RA004","place_of_performance":{"zip":"00918","city":{"name":"San Juan"},"state":{"code":"PR"},"street":"U.S. Army Corps of Engineers, Caribbean District 383 Franklin D. Roosevelt Ave San Juan, Puerto Rico 00918","country":{"code":"USA"}},"product_service_code":"Z2KB"},{"dates":{"posted":"2025-06-12","response_deadline":{"raw":"2025-07-07T11:00:00-04:00","utc":"2025-07-07T15:00:00Z","date":"2025-07-07","time":"11:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/7dd36d91b36549268587b2a5da1f62ed/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION","agency":{"office":{"code":"W51DQV","name":"W2SR ENDIST CARIBBEAN(PROVIS)"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"00918-0000","city":"SAN JUAN","state":"PR","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-10-05","archive_type":"auto_custom"},"contacts":[{"name":"Katrina Chapman","role":"primary","email":"katrina.l.chapman@usace.army.mil","phone":"9044012979"},{"name":"Anika Hillaire","role":"secondary","email":"anika.c.hillaire@usace.army.mil","phone":"7872002330"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"7dd36d91b36549268587b2a5da1f62ed","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"416be14f20728b527f9b818c6e749b3aabdf0b0f934a2e1e02c4ae78cee748d2","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Material Management Area (MMA), dredging of the Aquatic Disposal Pit (ADP) SJ1A with disposal at ADPs SJ2A, SJ3, and SJ4/5, dredging of 3,000 meters-long access channel across San Jos? Lagoon (SJL), bridge fenders to protect the concrete piers of the Moscoso Bridge near the SJL access channel, dredging of 450 meters-long transition channel between main channel and SJL access channel, dredging of 900 meters long main channel from the Barbosa bridge to San Jose Lagoon transition channel as a wall-stabilized channel composed of steel sheet pile walls with concrete cap along main channel with natural bottom, and construction of an approximately 61 meters-long riprap channel at the Barbosa Bridge to protect the foundation from scour associated with reestablishing flow through the CMP. Amendment 0001: Pre-proposal conference/ Site visit has been amended and changed from May 1, 2025, to May 15, 2025. See amendment 0001 for Site visit instructions.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W51DQV25RA004","place_of_performance":{"zip":"00918","city":{"name":"San Juan"},"state":{"code":"PR"},"street":"U.S. Army Corps of Engineers, Caribbean District 383 Franklin D. Roosevelt Ave San Juan, Puerto Rico 00918","country":{"code":"USA"}},"product_service_code":"Z2KB"},{"dates":{"posted":"2025-06-23","response_deadline":{"raw":"2025-07-07T11:00:00-04:00","utc":"2025-07-07T15:00:00Z","date":"2025-07-07","time":"11:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/bd4cb532676b43978ed1798ede82804a/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION","agency":{"office":{"code":"W51DQV","name":"W2SR ENDIST CARIBBEAN(PROVIS)"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"00918-0000","city":"SAN JUAN","state":"PR","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-10-05","archive_type":"auto_custom"},"contacts":[{"name":"Katrina Chapman","role":"primary","email":"katrina.l.chapman@usace.army.mil","phone":"9044012979"},{"name":"Anika Hillaire","role":"secondary","email":"anika.c.hillaire@usace.army.mil","phone":"7872002330"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"bd4cb532676b43978ed1798ede82804a","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"befe6aa240f17d7d6e23a2f55ec4986ca2c175e7e7d458d28011224bbe3330ce","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Material Management Area (MMA), dredging of the Aquatic Disposal Pit (ADP) SJ1A with disposal at ADPs SJ2A, SJ3, and SJ4/5, dredging of 3,000 meters-long access channel across San Jos? Lagoon (SJL), bridge fenders to protect the concrete piers of the Moscoso Bridge near the SJL access channel, dredging of 450 meters-long transition channel between main channel and SJL access channel, dredging of 900 meters long main channel from the Barbosa bridge to San Jose Lagoon transition channel as a wall-stabilized channel composed of steel sheet pile walls with concrete cap along main channel with natural bottom, and construction of an approximately 61 meters-long riprap channel at the Barbosa Bridge to protect the foundation from scour associated with reestablishing flow through the CMP.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W51DQV25RA004","place_of_performance":{"zip":"00918","city":{"name":"San Juan"},"state":{"code":"PR"},"street":"U.S. Army Corps of Engineers, Caribbean District 383 Franklin D. Roosevelt Ave San Juan, Puerto Rico 00918","country":{"code":"USA"}},"product_service_code":"Z2KB"},{"dates":{"posted":"2025-06-25","response_deadline":{"raw":"2025-07-30T11:00:00-04:00","utc":"2025-07-30T15:00:00Z","date":"2025-07-30","time":"11:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d96c5c7d7d404c4a8f098b0af46fbca2/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION","agency":{"office":{"code":"W51DQV","name":"W2SR ENDIST CARIBBEAN(PROVIS)"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"00918-0000","city":"SAN JUAN","state":"PR","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-10-05","archive_type":"auto_custom"},"contacts":[{"name":"Katrina Chapman","role":"primary","email":"katrina.l.chapman@usace.army.mil","phone":"9044012979"},{"name":"Anika Hillaire","role":"secondary","email":"anika.c.hillaire@usace.army.mil","phone":"7872002330"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"d96c5c7d7d404c4a8f098b0af46fbca2","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"bd461547a003e1d25a9a6acfee8ec5a8068dd9bf4aa9e830b4e48d6c0c62a43d","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Material Management Area (MMA), dredging of the Aquatic Disposal Pit (ADP) SJ1A with disposal at ADPs SJ2A, SJ3, and SJ4/5, dredging of 3,000 meters-long access channel across San Jos? Lagoon (SJL), bridge fenders to protect the concrete piers of the Moscoso Bridge near the SJL access channel, dredging of 450 meters-long transition channel between main channel and SJL access channel, dredging of 900 meters long main channel from the Barbosa bridge to San Jose Lagoon transition channel as a wall-stabilized channel composed of steel sheet pile walls with concrete cap along main channel with natural bottom, and construction of an approximately 61 meters-long riprap channel at the Barbosa Bridge to protect the foundation from scour associated with reestablishing flow through the CMP.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W51DQV25RA004","place_of_performance":{"zip":"00918","city":{"name":"San Juan"},"state":{"code":"PR"},"street":"U.S. Army Corps of Engineers, Caribbean District 383 Franklin D. Roosevelt Ave San Juan, Puerto Rico 00918","country":{"code":"USA"}},"product_service_code":"Z2KB"},{"dates":{"posted":"2025-07-11","response_deadline":{"raw":"2025-07-30T11:00:00-04:00","utc":"2025-07-30T15:00:00Z","date":"2025-07-30","time":"11:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/3a57eb8a71a1445992a23a3259843ef2/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION","agency":{"office":{"code":"W51DQV","name":"W2SR ENDIST CARIBBEAN(PROVIS)"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"00918-0000","city":"SAN JUAN","state":"PR","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-10-05","archive_type":"auto_custom"},"contacts":[{"name":"Katrina Chapman","role":"primary","email":"katrina.l.chapman@usace.army.mil","phone":"9044012979"},{"name":"Anika Hillaire","role":"secondary","email":"anika.c.hillaire@usace.army.mil","phone":"7872002330"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"3a57eb8a71a1445992a23a3259843ef2","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"aa64c3e5942d07bfaf27dbf05999090f8a369548ff73d86e4abb3f09f75bf032","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Material Management Area (MMA), dredging of the Aquatic Disposal Pit (ADP) SJ1A with disposal at ADPs SJ2A, SJ3, and SJ4/5, dredging of 3,000 meters-long access channel across San Jos? Lagoon (SJL), bridge fenders to protect the concrete piers of the Moscoso Bridge near the SJL access channel, dredging of 450 meters-long transition channel between main channel and SJL access channel, dredging of 900 meters long main channel from the Barbosa bridge to San Jose Lagoon transition channel as a wall-stabilized channel composed of steel sheet pile walls with concrete cap along main channel with natural bottom, and construction of an approximately 61 meters-long riprap channel at the Barbosa Bridge to protect the foundation from scour associated with reestablishing flow through the CMP.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W51DQV25RA004","place_of_performance":{"zip":"00918","city":{"name":"San Juan"},"state":{"code":"PR"},"street":"U.S. Army Corps of Engineers, Caribbean District 383 Franklin D. Roosevelt Ave San Juan, Puerto Rico 00918","country":{"code":"USA"}},"product_service_code":"Z2KB"},{"dates":{"posted":"2025-07-28","response_deadline":{"raw":"2025-08-11T11:00:00-04:00","utc":"2025-08-11T15:00:00Z","date":"2025-08-11","time":"11:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d4db23e48157471c8625231a8605b17c/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION","agency":{"office":{"code":"W51DQV","name":"W2SR ENDIST CARIBBEAN(PROVIS)"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"00918-0000","city":"SAN JUAN","state":"PR","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-10-05","archive_type":"auto_custom"},"contacts":[{"name":"Anika Hillaire","role":"primary","email":"anika.c.hillaire@usace.army.mil","phone":"7872002330"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"d4db23e48157471c8625231a8605b17c","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"22907d9e44735b5aa099b21c2968b2e190ec1179df45d7c2b1f74817c6dae789","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Material Management Area (MMA), dredging of the Aquatic Disposal Pit (ADP) SJ1A with disposal at ADPs SJ2A, SJ3, and SJ4/5, dredging of 3,000 meters-long access channel across San Jos? Lagoon (SJL), bridge fenders to protect the concrete piers of the Moscoso Bridge near the SJL access channel, dredging of 450 meters-long transition channel between main channel and SJL access channel, dredging of 900 meters long main channel from the Barbosa bridge to San Jose Lagoon transition channel as a wall-stabilized channel composed of steel sheet pile walls with concrete cap along main channel with natural bottom, and construction of an approximately 61 meters-long riprap channel at the Barbosa Bridge to protect the foundation from scour associated with reestablishing flow through the CMP.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W51DQV25RA004","place_of_performance":{"zip":"00918","city":{"name":"San Juan"},"state":{"code":"PR"},"street":"U.S. Army Corps of Engineers, Caribbean District 383 Franklin D. Roosevelt Ave San Juan, Puerto Rico 00918","country":{"code":"USA"}},"product_service_code":"Z2KB"},{"award":{"date":"2025-09-30","amount":"57427000","number":"W51DQVCA007","awardee":{"raw":"NOVEL CONSTRUCTION LLC 1738 CALLE AMARILLO SUITE 205 BOX 15 San Juan PR 00926 USA","name":"NOVEL CONSTRUCTION LLC 1738 CALLE AMARILLO SUITE 205 BOX 15 San Juan","location":{"zip":"00926","state":{"code":"PR"},"country":{"code":"USA"}}}},"dates":{"posted":"2025-09-30","award_date":"2025-09-30"},"links":{"sam":"https://sam.gov/workspace/contract/opp/fd9dc5df29584d5da00b230b2e65c173/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION","agency":{"office":{"code":"W51DQV","name":"W2SR ENDIST CARIBBEAN(PROVIS)"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"00918-0000","city":"SAN JUAN","state":"PR","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-10-05","archive_type":"auto_custom"},"contacts":[{"name":"Anika Hillaire","role":"primary","email":"anika.c.hillaire@usace.army.mil","phone":"7872002330"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"fd9dc5df29584d5da00b230b2e65c173","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"d897c747daf4f36e614f3e42faa74303003091e75af74ff9bc3f97bff6f1a53a","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Material Management Area (MMA), dredging of the Aquatic Disposal Pit (ADP) SJ1A with disposal at ADPs SJ2A, SJ3, and SJ4/5, dredging of 3,000 meters-long access channel across San Jos? Lagoon (SJL), bridge fenders to protect the concrete piers of the Moscoso Bridge near the SJL access channel, dredging of 450 meters-long transition channel between main channel and SJL access channel, dredging of 900 meters long main channel from the Barbosa bridge to San Jose Lagoon transition channel as a wall-stabilized channel composed of steel sheet pile walls with concrete cap along main channel with natural bottom, and construction of an approximately 61 meters-long riprap channel at the Barbosa Bridge to protect the foundation from scour associated with reestablishing flow through the CMP.","origin":"extract"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"W51DQV25RA004","place_of_performance":{"zip":"00918","street":"U.S. Army Corps of Engineers, Caribbean District 383 Franklin D. Roosevelt Ave San Juan, Puerto Rico 00918"},"product_service_code":"Z2KB"}],"due_at":"2025-08-11T15:00:00Z","due_date":"2025-08-11","closes_at":"2025-08-11T15:00:00Z","awardable":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W51DQV","office_name":"W2SR ENDIST CARIBBEAN(PROVIS)","state":"PR","county":"72127","county_name":"San Juan Municipio","city":"7276770","city_name":"San Juan","country":"USA","winner_key":null,"amount":"57427000","linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z","principal_notice_id":"fd9dc5df29584d5da00b230b2e65c173","description":{"text":"This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Material Management Area (MMA), dredging of the Aquatic Disposal Pit (ADP) SJ1A with disposal at ADPs SJ2A, SJ3, and SJ4/5, dredging of 3,000 meters-long access channel across San Jos? Lagoon (SJL), bridge fenders to protect the concrete piers of the Moscoso Bridge near the SJL access channel, dredging of 450 meters-long transition channel between main channel and SJL access channel, dredging of 900 meters long main channel from the Barbosa bridge to San Jose Lagoon transition channel as a wall-stabilized channel composed of steel sheet pile walls with concrete cap along main channel with natural bottom, and construction of an approximately 61 meters-long riprap channel at the Barbosa Bridge to protect the foundation from scour associated with reestablishing flow through the CMP.","html":null,"origin":"extract"},"contacts":[{"name":"Anika Hillaire","role":"primary","email":"anika.c.hillaire@usace.army.mil","phone":"7872002330"}],"place_of_performance":{"zip":"00918","street":"U.S. Army Corps of Engineers, Caribbean District 383 Franklin D. Roosevelt Ave San Juan, Puerto Rico 00918"},"office_address":{"zip":"00918-0000","city":"SAN JUAN","state":"PR","country":"USA"},"naics_codes":["237990"],"award":{"date":"2025-09-30","amount":"57427000","number":"W51DQVCA007","awardee":{"raw":"NOVEL CONSTRUCTION LLC 1738 CALLE AMARILLO SUITE 205 BOX 15 San Juan PR 00926 USA","name":"NOVEL CONSTRUCTION LLC 1738 CALLE AMARILLO SUITE 205 BOX 15 San Juan","location":{"zip":"00926","state":{"code":"PR"},"country":{"code":"USA"}}}},"attachments":[],"awards":[],"related":[{"key":"W51DQV26RA002","latest_notice_id":"8efabf777b7b42de869144977602bd8f","title":"RIO DE LA PLATA FLOOD CONTROL PROJECT, SUPPLEMENTAL CONTRACT 1 PROJECT LOCATION: DORADO AND TOA BAJA, PUERTO RICO","solicitation_number":"W51DQV26RA002","notice_type":"o","first_type":"p","first_posted":"2025-12-05","last_posted":"2026-09-03","notices":13,"due_at":"2026-10-27T18:00:00Z","due_date":"2026-10-27","closes_at":"2026-10-27T18:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W51DQV","office_name":"W2SR ENDIST CARIBBEAN(PROVIS)","naics":"237990","psc":"Y1KB","set_aside":null,"state":"PR","county":"72137","county_name":"Toa Baja Municipio","city":"7282617","city_name":"Toa Baja","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"}]}