{"canonical":"https://abierto.us/opportunities/w519tc26rbior","key":"W519TC26RBIOR","url":"https://abierto.us/opportunities/w519tc26rbior","title":"Design and Construction of a Modernized Industrial Wastewater Treatment Facility (Bioplant) at Radford Army Ammunition Plant (RFAAP)","solicitation_number":"W519TC-26-R-BIOR","notice_type":"p","open":false,"response_deadline":"2026-08-28T17:00:00Z","first_posted":"2026-07-24","last_posted":"2026-08-18","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"W6QK ACC-RI","naics":"325920","psc":"M1EA","set_aside":null,"place_state":"VA","winner":null,"award_amount":null,"publications":[{"notice_id":"9987fb23e8f043a580649e10babdb847","title":"Design and Construction of a Modernized Industrial Wastewater Treatment Facility (Bioplant) at Radford Army Ammunition Plant (RFAAP)","solicitation_number":"W519TC-26-R-BIOR","notice_type":"p","base_type":"r","posted":"2026-07-24","posted_at":null,"due_at":"2026-08-07T20:00:00Z","due_date":"2026-08-07","cancelled":null,"archived":null,"archive_date":"2026-08-31","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/9987fb23e8f043a580649e10babdb847/view","enriched":false,"history":[]},{"notice_id":"8157f04be3f54452b707f7fb2148dc7f","title":"Design and Construction of a Modernized Industrial Wastewater Treatment Facility (Bioplant) at Radford Army Ammunition Plant (RFAAP)","solicitation_number":"W519TC-26-R-BIOR","notice_type":"p","base_type":"p","posted":"2026-07-31","posted_at":null,"due_at":"2026-08-20T21:00:00Z","due_date":"2026-08-20","cancelled":null,"archived":null,"archive_date":"2026-09-30","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/8157f04be3f54452b707f7fb2148dc7f/view","enriched":false,"history":[]},{"notice_id":"443709fb8a784de1ab9f110c64ba6104","title":"Design and Construction of a Modernized Industrial Wastewater Treatment Facility (Bioplant) at Radford Army Ammunition Plant (RFAAP)","solicitation_number":"W519TC-26-R-BIOR","notice_type":"p","base_type":"p","posted":"2026-08-03","posted_at":null,"due_at":"2026-08-20T21:00:00Z","due_date":"2026-08-20","cancelled":null,"archived":null,"archive_date":"2026-09-30","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/443709fb8a784de1ab9f110c64ba6104/view","enriched":false,"history":[]},{"notice_id":"98ece1fe4c1b4619bc3511cdbeffdb9d","title":"Design and Construction of a Modernized Industrial Wastewater Treatment Facility (Bioplant) at Radford Army Ammunition Plant (RFAAP)","solicitation_number":"W519TC-26-R-BIOR","notice_type":"p","base_type":"p","posted":"2026-08-11","posted_at":null,"due_at":"2026-08-20T21:00:00Z","due_date":"2026-08-20","cancelled":null,"archived":null,"archive_date":"2026-09-30","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/98ece1fe4c1b4619bc3511cdbeffdb9d/view","enriched":false,"history":[]},{"notice_id":"e80f7ac7a739498dac5796fe4d511c9a","title":"Design and Construction of a Modernized Industrial Wastewater Treatment Facility (Bioplant) at Radford Army Ammunition Plant (RFAAP)","solicitation_number":"W519TC-26-R-BIOR","notice_type":"p","base_type":"p","posted":"2026-08-12","posted_at":null,"due_at":"2026-08-20T21:00:00Z","due_date":"2026-08-20","cancelled":null,"archived":null,"archive_date":"2026-09-30","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/e80f7ac7a739498dac5796fe4d511c9a/view","enriched":false,"history":[]},{"notice_id":"39a7721fd0ef41d9bee77cfd21607c72","title":"Design and Construction of a Modernized Industrial Wastewater Treatment Facility (Bioplant) at Radford Army Ammunition Plant (RFAAP)","solicitation_number":"W519TC-26-R-BIOR","notice_type":"p","base_type":"p","posted":"2026-08-14","posted_at":null,"due_at":"2026-08-20T21:00:00Z","due_date":"2026-08-20","cancelled":null,"archived":null,"archive_date":"2026-09-30","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/39a7721fd0ef41d9bee77cfd21607c72/view","enriched":false,"history":[]},{"notice_id":"fdbd1b2eab304eff9cf0435c7c3c1b22","title":"Design and Construction of a Modernized Industrial Wastewater Treatment Facility (Bioplant) at Radford Army Ammunition Plant (RFAAP)","solicitation_number":"W519TC-26-R-BIOR","notice_type":"p","base_type":"p","posted":"2026-08-17","posted_at":null,"due_at":"2026-08-28T17:00:00Z","due_date":"2026-08-28","cancelled":null,"archived":null,"archive_date":"2026-09-30","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/fdbd1b2eab304eff9cf0435c7c3c1b22/view","enriched":false,"history":[]},{"notice_id":"54b92fa570db4fdea97e0d89d5ab36ff","title":"Design and Construction of a Modernized Industrial Wastewater Treatment Facility (Bioplant) at Radford Army Ammunition Plant (RFAAP)","solicitation_number":"W519TC-26-R-BIOR","notice_type":"p","base_type":"p","posted":"2026-08-18","posted_at":null,"due_at":"2026-08-28T17:00:00Z","due_date":"2026-08-28","cancelled":null,"archived":null,"archive_date":"2026-09-30","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/54b92fa570db4fdea97e0d89d5ab36ff/view","enriched":false,"history":[]}],"latest_notice_id":"54b92fa570db4fdea97e0d89d5ab36ff","first_type":"p","notices":[{"dates":{"posted":"2026-07-24","response_deadline":{"raw":"2026-08-07T15:00:00-05:00","utc":"2026-08-07T20:00:00Z","date":"2026-08-07","time":"15:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/9987fb23e8f043a580649e10babdb847/view"},"naics":{"codes":["325920"],"primary":"325920"},"title":"Design and Construction of a Modernized Industrial Wastewater Treatment Facility (Bioplant) at Radford Army Ammunition Plant (RFAAP)","agency":{"office":{"code":"W519TC","name":"W6QK ACC-RI"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"61299-0000","city":"ROCK ISLAND","state":"IL","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"archive_date":"2026-08-31","archive_type":"auto_custom"},"contacts":[{"name":"Steffanie L. Adams","role":"primary","email":"steffanie.l.adams.civ@army.mil","phone":"5206930043"},{"name":"Mallory Schmitt","role":"secondary","email":"mallory.d.schmitt.civ@army.mil","phone":"5206929882"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"9987fb23e8f043a580649e10babdb847","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T07:50:12.777658Z","row_sha256":"1bbe763d89d1af676b8c8437d16026155d5d2699bb024c946b820d38845f491b","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-16T07:50:12.777658Z","first_seen_at":"2026-09-16T00:55:28.845070Z"},"description":{"text":"NOTICE: This is a DRAFT Request for Solutions - RFS - issued for the purpose of obtaining industry comments and feedback on the project and the attached draft Statement of Work. NO PROPOSALS ARE BEING REQUESTED OR ACCEPTED AT THIS TIME. The requirement is for design and construction of a new bioplant facility for industrial wastewater treatment (Phase I) located at Radford Army Ammunition Plant (RFAAP) in Radford, VA. All general concerns, feedback, or questions are greatly appreciated. All questions and comments regarding this DRAFT RFS are due via e-mail to the Agreements Officer, Emily Sheppard, at emily.l.sheppard.civ@army.mil and the Agreement Specialists, Steffanie Adams, at steffanie.l.adams.civ@army.mil and Mallory Schmitt at mallory.d.schmitt.civ@army.mil no later than August 7, 2026 at 1500 CDT. Please reference DRAFT RFS number W519TC-26-R-BIOR in the subject line of all correspondence. This DRAFT RFS does not commit the Government to make any award or to obligate any funds for this project. The language and content in this DRAFT RFS are subject to change prior to the release of a future RFS.","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"W519TC-26-R-BIOR","place_of_performance":{"zip":"24141","city":{"name":"Radford"},"state":{"code":"VA"},"country":{"code":"USA"}},"product_service_code":"M1EA"},{"dates":{"posted":"2026-07-31","response_deadline":{"raw":"2026-08-20T16:00:00-05:00","utc":"2026-08-20T21:00:00Z","date":"2026-08-20","time":"16:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/8157f04be3f54452b707f7fb2148dc7f/view"},"naics":{"codes":["325920"],"primary":"325920"},"title":"Design and Construction of a Modernized Industrial Wastewater Treatment Facility (Bioplant) at Radford Army Ammunition Plant (RFAAP)","agency":{"office":{"code":"W519TC","name":"W6QK ACC-RI"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"61299-0000","city":"ROCK ISLAND","state":"IL","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"archive_date":"2026-09-30","archive_type":"auto_custom"},"contacts":[{"name":"Steffanie L. Adams","role":"primary","email":"steffanie.l.adams.civ@army.mil","phone":"5206930043"},{"name":"Mallory Schmitt","role":"secondary","email":"mallory.d.schmitt.civ@army.mil","phone":"5206929882"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"8157f04be3f54452b707f7fb2148dc7f","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T07:50:12.777658Z","row_sha256":"47670f3589512def655640bfe58baa50ba9549324303a80cf6ac693b9246b9fc","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-16T07:50:12.777658Z","first_seen_at":"2026-09-16T00:55:28.845070Z"},"description":{"text":"Constructed in the 1940s, Radford Army Ammunition Plant (RFAAP) is a critical national security asset, serving as the last remaining CONUS Government-owned facility capable of manufacturing nitrocellulose (NC), nitroglycerin (NG), single-base, multi-base, and solventless propellants. The industrial wastewater generated by these manufacturing processes contains complex chemical components—including solvents and propellant residues (solid, dissolved, or suspended energetic materials)—which must be rigorously treated prior to discharge into the New River. The legacy RFAAP Bioplant, constructed in the 1980s, is significantly past its useful service life and acts as a single point of failure for plant operations. Crucially, the facility is located within the 100-year floodplain, exposing it to severe operational risks, as demonstrated by an emergency shutdown during Hurricane Helene in 2024. Due to these critical vulnerabilities, project funding has been accelerated to FY26. Furthermore, the aging facility is increasingly incapable of consistently treating the plant's evolving wastewater streams. RFAAP discharge is strictly regulated by the Virginia Department of Environmental Quality (VDEQ) via a Virginia Pollutant Discharge Elimination System (VPDES) permit under the Clean Water Act. Recently, the legacy plant has suffered a high rate of compliance failure, registering 14 permit violations across three separate incidents within a 16-month period. These violations primarily resulted from an inability to adequately process Biochemical Oxygen Demand (BOD), Chemical The overarching goal is for the offeror(s) to develop design and construction of a wastewater treatment process and deliver a completed solution to the Government. Follow-On Contracts or Transactions (Phase II): In accordance with the authority of 10 U.S.C. § 2808a, the potential award of a future Other Transaction may result in the award of a follow-on contract or transaction for site preparation and construction without the use of competitive procedures, provided that the initial transaction was competitively awarded, the participant(s) successfully completed the project, and the follow-on is for the same or similar scope of work. Therefore, upon determination that the participant(s) in the transaction successfully completed the design project provided for in the transaction, or in the event that a particularly favorable or unexpected result is accomplished that justifies transition to production, this design project may result in the award of a follow-on contract for advancement to Issue for Construction (IFC) status, site preparation, construction, commissioning, and transition without the use of competitive procedures. This RFS is for a contemplated OTA that, if awarded, will be awarded in accordance with 10 U.S.C. § 2028a, Facility construction or repair: transactions other than contracts and grants. Interest & Question Submittal Deadline: 7 AUG 2026 / 1500CDT Proposal Due Date/Time: 20 August 2026 / 1600CT","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"W519TC-26-R-BIOR","place_of_performance":{"zip":"24141","city":{"name":"Radford"},"state":{"code":"VA"},"country":{"code":"USA"}},"product_service_code":"M1EA"},{"dates":{"posted":"2026-08-03","response_deadline":{"raw":"2026-08-20T16:00:00-05:00","utc":"2026-08-20T21:00:00Z","date":"2026-08-20","time":"16:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/443709fb8a784de1ab9f110c64ba6104/view"},"naics":{"codes":["325920"],"primary":"325920"},"title":"Design and Construction of a Modernized Industrial Wastewater Treatment Facility (Bioplant) at Radford Army Ammunition Plant (RFAAP)","agency":{"office":{"code":"W519TC","name":"W6QK ACC-RI"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"61299-0000","city":"ROCK ISLAND","state":"IL","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"archive_date":"2026-09-30","archive_type":"auto_custom"},"contacts":[{"name":"Steffanie L. Adams","role":"primary","email":"steffanie.l.adams.civ@army.mil","phone":"5206930043"},{"name":"Mallory Schmitt","role":"secondary","email":"mallory.d.schmitt.civ@army.mil","phone":"5206929882"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"443709fb8a784de1ab9f110c64ba6104","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T07:50:12.777658Z","row_sha256":"783cbe302f77f5b65348021d1901268cbc5a5872e1cf96718109a59d52a44300","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-16T07:50:12.777658Z","first_seen_at":"2026-09-16T00:55:28.845070Z"},"description":{"text":"Constructed in the 1940s, Radford Army Ammunition Plant (RFAAP) is a critical national security asset, serving as the last remaining CONUS Government-owned facility capable of manufacturing nitrocellulose (NC), nitroglycerin (NG), single-base, multi-base, and solventless propellants. The industrial wastewater generated by these manufacturing processes contains complex chemical components—including solvents and propellant residues (solid, dissolved, or suspended energetic materials)—which must be rigorously treated prior to discharge into the New River. The legacy RFAAP Bioplant, constructed in the 1980s, is significantly past its useful service life and acts as a single point of failure for plant operations. Crucially, the facility is located within the 100-year floodplain, exposing it to severe operational risks, as demonstrated by an emergency shutdown during Hurricane Helene in 2024. Due to these critical vulnerabilities, project funding has been accelerated to FY26. Furthermore, the aging facility is increasingly incapable of consistently treating the plant's evolving wastewater streams. RFAAP discharge is strictly regulated by the Virginia Department of Environmental Quality (VDEQ) via a Virginia Pollutant Discharge Elimination System (VPDES) permit under the Clean Water Act. Recently, the legacy plant has suffered a high rate of compliance failure, registering 14 permit violations across three separate incidents within a 16-month period. These violations primarily resulted from an inability to adequately process Biochemical Oxygen Demand (BOD), Chemical The overarching goal is for the offeror(s) to develop design and construction of a wastewater treatment process and deliver a completed solution to the Government. Follow-On Contracts or Transactions (Phase II): In accordance with the authority of 10 U.S.C. § 2808a, the potential award of a future Other Transaction may result in the award of a follow-on contract or transaction for site preparation and construction without the use of competitive procedures, provided that the initial transaction was competitively awarded, the participant(s) successfully completed the project, and the follow-on is for the same or similar scope of work. Therefore, upon determination that the participant(s) in the transaction successfully completed the design project provided for in the transaction, or in the event that a particularly favorable or unexpected result is accomplished that justifies transition to production, this design project may result in the award of a follow-on contract for advancement to Issue for Construction (IFC) status, site preparation, construction, commissioning, and transition without the use of competitive procedures. This RFS is for a contemplated OTA that, if awarded, will be awarded in accordance with 10 U.S.C. § 2028a, Facility construction or repair: transactions other than contracts and grants. Interest & Question Submittal Deadline: 7 AUG 2026 / 1500CDT Proposal Due Date/Time: 20 August 2026 / 1600CT","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"W519TC-26-R-BIOR","place_of_performance":{"zip":"24141","city":{"name":"Radford"},"state":{"code":"VA"},"country":{"code":"USA"}},"product_service_code":"M1EA"},{"dates":{"posted":"2026-08-11","response_deadline":{"raw":"2026-08-20T16:00:00-05:00","utc":"2026-08-20T21:00:00Z","date":"2026-08-20","time":"16:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/98ece1fe4c1b4619bc3511cdbeffdb9d/view"},"naics":{"codes":["325920"],"primary":"325920"},"title":"Design and Construction of a Modernized Industrial Wastewater Treatment Facility (Bioplant) at Radford Army Ammunition Plant (RFAAP)","agency":{"office":{"code":"W519TC","name":"W6QK ACC-RI"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"61299-0000","city":"ROCK ISLAND","state":"IL","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"archive_date":"2026-09-30","archive_type":"auto_custom"},"contacts":[{"name":"Steffanie L. Adams","role":"primary","email":"steffanie.l.adams.civ@army.mil","phone":"5206930043"},{"name":"Mallory Schmitt","role":"secondary","email":"mallory.d.schmitt.civ@army.mil","phone":"5206929882"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"98ece1fe4c1b4619bc3511cdbeffdb9d","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T07:50:12.777658Z","row_sha256":"9b6f6df633a7c158c2dcf5c6e5a4cc905f9c2dcfc4e69ab823b324a0c4b3c9b9","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-16T07:50:12.777658Z","first_seen_at":"2026-09-16T00:55:28.845070Z"},"description":{"text":"Constructed in the 1940s, Radford Army Ammunition Plant (RFAAP) is a critical national security asset, serving as the last remaining CONUS Government-owned facility capable of manufacturing nitrocellulose (NC), nitroglycerin (NG), single-base, multi-base, and solventless propellants. The industrial wastewater generated by these manufacturing processes contains complex chemical components—including solvents and propellant residues (solid, dissolved, or suspended energetic materials)—which must be rigorously treated prior to discharge into the New River. The legacy RFAAP Bioplant, constructed in the 1980s, is significantly past its useful service life and acts as a single point of failure for plant operations. Crucially, the facility is located within the 100-year floodplain, exposing it to severe operational risks, as demonstrated by an emergency shutdown during Hurricane Helene in 2024. Due to these critical vulnerabilities, project funding has been accelerated to FY26. Furthermore, the aging facility is increasingly incapable of consistently treating the plant's evolving wastewater streams. RFAAP discharge is strictly regulated by the Virginia Department of Environmental Quality (VDEQ) via a Virginia Pollutant Discharge Elimination System (VPDES) permit under the Clean Water Act. Recently, the legacy plant has suffered a high rate of compliance failure, registering 14 permit violations across three separate incidents within a 16-month period. These violations primarily resulted from an inability to adequately process Biochemical Oxygen Demand (BOD), Chemical The overarching goal is for the offeror(s) to develop design and construction of a wastewater treatment process and deliver a completed solution to the Government. Follow-On Contracts or Transactions (Phase II): In accordance with the authority of 10 U.S.C. § 2808a, the potential award of a future Other Transaction may result in the award of a follow-on contract or transaction for site preparation and construction without the use of competitive procedures, provided that the initial transaction was competitively awarded, the participant(s) successfully completed the project, and the follow-on is for the same or similar scope of work. Therefore, upon determination that the participant(s) in the transaction successfully completed the design project provided for in the transaction, or in the event that a particularly favorable or unexpected result is accomplished that justifies transition to production, this design project may result in the award of a follow-on contract for advancement to Issue for Construction (IFC) status, site preparation, construction, commissioning, and transition without the use of competitive procedures. This RFS is for a contemplated OTA that, if awarded, will be awarded in accordance with 10 U.S.C. § 2028a, Facility construction or repair: transactions other than contracts and grants. Interest & Question Submittal Deadline: 7 AUG 2026 / 1500CDT Proposal Due Date/Time: 20 August 2026 / 1600CT","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"W519TC-26-R-BIOR","place_of_performance":{"zip":"24141","city":{"name":"Radford"},"state":{"code":"VA"},"country":{"code":"USA"}},"product_service_code":"M1EA"},{"dates":{"posted":"2026-08-12","response_deadline":{"raw":"2026-08-20T16:00:00-05:00","utc":"2026-08-20T21:00:00Z","date":"2026-08-20","time":"16:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/e80f7ac7a739498dac5796fe4d511c9a/view"},"naics":{"codes":["325920"],"primary":"325920"},"title":"Design and Construction of a Modernized Industrial Wastewater Treatment Facility (Bioplant) at Radford Army Ammunition Plant (RFAAP)","agency":{"office":{"code":"W519TC","name":"W6QK ACC-RI"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"61299-0000","city":"ROCK ISLAND","state":"IL","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"archive_date":"2026-09-30","archive_type":"auto_custom"},"contacts":[{"name":"Steffanie L. Adams","role":"primary","email":"steffanie.l.adams.civ@army.mil","phone":"5206930043"},{"name":"Mallory Schmitt","role":"secondary","email":"mallory.d.schmitt.civ@army.mil","phone":"5206929882"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"e80f7ac7a739498dac5796fe4d511c9a","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T07:50:12.777658Z","row_sha256":"694e8b24a0b6bbeb35a46ed54fc3991044860e654bec2a8ab5e36b6237e4bef4","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-16T07:50:12.777658Z","first_seen_at":"2026-09-16T00:55:28.845070Z"},"description":{"text":"Constructed in the 1940s, Radford Army Ammunition Plant (RFAAP) is a critical national security asset, serving as the last remaining CONUS Government-owned facility capable of manufacturing nitrocellulose (NC), nitroglycerin (NG), single-base, multi-base, and solventless propellants. The industrial wastewater generated by these manufacturing processes contains complex chemical components—including solvents and propellant residues (solid, dissolved, or suspended energetic materials)—which must be rigorously treated prior to discharge into the New River. The legacy RFAAP Bioplant, constructed in the 1980s, is significantly past its useful service life and acts as a single point of failure for plant operations. Crucially, the facility is located within the 100-year floodplain, exposing it to severe operational risks, as demonstrated by an emergency shutdown during Hurricane Helene in 2024. Due to these critical vulnerabilities, project funding has been accelerated to FY26. Furthermore, the aging facility is increasingly incapable of consistently treating the plant's evolving wastewater streams. RFAAP discharge is strictly regulated by the Virginia Department of Environmental Quality (VDEQ) via a Virginia Pollutant Discharge Elimination System (VPDES) permit under the Clean Water Act. Recently, the legacy plant has suffered a high rate of compliance failure, registering 14 permit violations across three separate incidents within a 16-month period. These violations primarily resulted from an inability to adequately process Biochemical Oxygen Demand (BOD), Chemical The overarching goal is for the offeror(s) to develop design and construction of a wastewater treatment process and deliver a completed solution to the Government. Follow-On Contracts or Transactions (Phase II): In accordance with the authority of 10 U.S.C. § 2808a, the potential award of a future Other Transaction may result in the award of a follow-on contract or transaction for site preparation and construction without the use of competitive procedures, provided that the initial transaction was competitively awarded, the participant(s) successfully completed the project, and the follow-on is for the same or similar scope of work. Therefore, upon determination that the participant(s) in the transaction successfully completed the design project provided for in the transaction, or in the event that a particularly favorable or unexpected result is accomplished that justifies transition to production, this design project may result in the award of a follow-on contract for advancement to Issue for Construction (IFC) status, site preparation, construction, commissioning, and transition without the use of competitive procedures. This RFS is for a contemplated OTA that, if awarded, will be awarded in accordance with 10 U.S.C. § 2028a, Facility construction or repair: transactions other than contracts and grants. Interest & Question Submittal Deadline: 7 AUG 2026 / 1500CDT Proposal Due Date/Time: 20 August 2026 / 1600CT","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"W519TC-26-R-BIOR","place_of_performance":{"zip":"24141","city":{"name":"Radford"},"state":{"code":"VA"},"country":{"code":"USA"}},"product_service_code":"M1EA"},{"dates":{"posted":"2026-08-14","response_deadline":{"raw":"2026-08-20T16:00:00-05:00","utc":"2026-08-20T21:00:00Z","date":"2026-08-20","time":"16:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/39a7721fd0ef41d9bee77cfd21607c72/view"},"naics":{"codes":["325920"],"primary":"325920"},"title":"Design and Construction of a Modernized Industrial Wastewater Treatment Facility (Bioplant) at Radford Army Ammunition Plant (RFAAP)","agency":{"office":{"code":"W519TC","name":"W6QK ACC-RI"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"61299-0000","city":"ROCK ISLAND","state":"IL","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"archive_date":"2026-09-30","archive_type":"auto_custom"},"contacts":[{"name":"Steffanie L. Adams","role":"primary","email":"steffanie.l.adams.civ@army.mil","phone":"5206930043"},{"name":"Mallory Schmitt","role":"secondary","email":"mallory.d.schmitt.civ@army.mil","phone":"5206929882"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"39a7721fd0ef41d9bee77cfd21607c72","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T07:50:12.777658Z","row_sha256":"caf34e123c438fd6801b9b9f6b1b882521fde0ef278ad480c63834e87841f3a2","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-16T07:50:12.777658Z","first_seen_at":"2026-09-16T00:55:28.845070Z"},"description":{"text":"Constructed in the 1940s, Radford Army Ammunition Plant (RFAAP) is a critical national security asset, serving as the last remaining CONUS Government-owned facility capable of manufacturing nitrocellulose (NC), nitroglycerin (NG), single-base, multi-base, and solventless propellants. The industrial wastewater generated by these manufacturing processes contains complex chemical components—including solvents and propellant residues (solid, dissolved, or suspended energetic materials)—which must be rigorously treated prior to discharge into the New River. The legacy RFAAP Bioplant, constructed in the 1980s, is significantly past its useful service life and acts as a single point of failure for plant operations. Crucially, the facility is located within the 100-year floodplain, exposing it to severe operational risks, as demonstrated by an emergency shutdown during Hurricane Helene in 2024. Due to these critical vulnerabilities, project funding has been accelerated to FY26. Furthermore, the aging facility is increasingly incapable of consistently treating the plant's evolving wastewater streams. RFAAP discharge is strictly regulated by the Virginia Department of Environmental Quality (VDEQ) via a Virginia Pollutant Discharge Elimination System (VPDES) permit under the Clean Water Act. Recently, the legacy plant has suffered a high rate of compliance failure, registering 14 permit violations across three separate incidents within a 16-month period. These violations primarily resulted from an inability to adequately process Biochemical Oxygen Demand (BOD), Chemical The overarching goal is for the offeror(s) to develop design and construction of a wastewater treatment process and deliver a completed solution to the Government. Follow-On Contracts or Transactions (Phase II): In accordance with the authority of 10 U.S.C. § 2808a, the potential award of a future Other Transaction may result in the award of a follow-on contract or transaction for site preparation and construction without the use of competitive procedures, provided that the initial transaction was competitively awarded, the participant(s) successfully completed the project, and the follow-on is for the same or similar scope of work. Therefore, upon determination that the participant(s) in the transaction successfully completed the design project provided for in the transaction, or in the event that a particularly favorable or unexpected result is accomplished that justifies transition to production, this design project may result in the award of a follow-on contract for advancement to Issue for Construction (IFC) status, site preparation, construction, commissioning, and transition without the use of competitive procedures. This RFS is for a contemplated OTA that, if awarded, will be awarded in accordance with 10 U.S.C. § 2028a, Facility construction or repair: transactions other than contracts and grants. Interest & Question Submittal Deadline: 7 AUG 2026 / 1500CDT Proposal Due Date/Time: 20 August 2026 / 1600CT","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"W519TC-26-R-BIOR","place_of_performance":{"zip":"24141","city":{"name":"Radford"},"state":{"code":"VA"},"country":{"code":"USA"}},"product_service_code":"M1EA"},{"dates":{"posted":"2026-08-17","response_deadline":{"raw":"2026-08-28T12:00:00-05:00","utc":"2026-08-28T17:00:00Z","date":"2026-08-28","time":"12:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/fdbd1b2eab304eff9cf0435c7c3c1b22/view"},"naics":{"codes":["325920"],"primary":"325920"},"title":"Design and Construction of a Modernized Industrial Wastewater Treatment Facility (Bioplant) at Radford Army Ammunition Plant (RFAAP)","agency":{"office":{"code":"W519TC","name":"W6QK ACC-RI"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"61299-0000","city":"ROCK ISLAND","state":"IL","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"archive_date":"2026-09-30","archive_type":"auto_custom"},"contacts":[{"name":"Steffanie L. Adams","role":"primary","email":"steffanie.l.adams.civ@army.mil","phone":"5206930043"},{"name":"Mallory Schmitt","role":"secondary","email":"mallory.d.schmitt.civ@army.mil","phone":"5206929882"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"fdbd1b2eab304eff9cf0435c7c3c1b22","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T07:50:12.777658Z","row_sha256":"9d70db9369cc59511cb8bf4b72caa9d93596b38ad66bd546c1258dec2f6695a7","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-16T07:50:12.777658Z","first_seen_at":"2026-09-15T22:52:52.472456Z"},"description":{"text":"Constructed in the 1940s, Radford Army Ammunition Plant (RFAAP) is a critical national security asset, serving as the last remaining CONUS Government-owned facility capable of manufacturing nitrocellulose (NC), nitroglycerin (NG), single-base, multi-base, and solventless propellants. The industrial wastewater generated by these manufacturing processes contains complex chemical components—including solvents and propellant residues (solid, dissolved, or suspended energetic materials)—which must be rigorously treated prior to discharge into the New River. The legacy RFAAP Bioplant, constructed in the 1980s, is significantly past its useful service life and acts as a single point of failure for plant operations. Crucially, the facility is located within the 100-year floodplain, exposing it to severe operational risks, as demonstrated by an emergency shutdown during Hurricane Helene in 2024. Due to these critical vulnerabilities, project funding has been accelerated to FY26. Furthermore, the aging facility is increasingly incapable of consistently treating the plant's evolving wastewater streams. RFAAP discharge is strictly regulated by the Virginia Department of Environmental Quality (VDEQ) via a Virginia Pollutant Discharge Elimination System (VPDES) permit under the Clean Water Act. Recently, the legacy plant has suffered a high rate of compliance failure, registering 14 permit violations across three separate incidents within a 16-month period. These violations primarily resulted from an inability to adequately process Biochemical Oxygen Demand (BOD), Chemical The overarching goal is for the offeror(s) to develop design and construction of a wastewater treatment process and deliver a completed solution to the Government. Follow-On Contracts or Transactions (Phase II): In accordance with the authority of 10 U.S.C. § 2808a, the potential award of a future Other Transaction may result in the award of a follow-on contract or transaction for site preparation and construction without the use of competitive procedures, provided that the initial transaction was competitively awarded, the participant(s) successfully completed the project, and the follow-on is for the same or similar scope of work. Therefore, upon determination that the participant(s) in the transaction successfully completed the design project provided for in the transaction, or in the event that a particularly favorable or unexpected result is accomplished that justifies transition to production, this design project may result in the award of a follow-on contract for advancement to Issue for Construction (IFC) status, site preparation, construction, commissioning, and transition without the use of competitive procedures. This RFS is for a contemplated OTA that, if awarded, will be awarded in accordance with 10 U.S.C. § 2028a, Facility construction or repair: transactions other than contracts and grants. Interest & Question Submittal Deadline: 7 AUG 2026 / 1500CDT Proposal Due Date/Time: 20 August 2026 / 1600CT","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"W519TC-26-R-BIOR","place_of_performance":{"zip":"24141","city":{"name":"Radford"},"state":{"code":"VA"},"country":{"code":"USA"}},"product_service_code":"M1EA"},{"dates":{"posted":"2026-08-18","response_deadline":{"raw":"2026-08-28T12:00:00-05:00","utc":"2026-08-28T17:00:00Z","date":"2026-08-28","time":"12:00:00","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/54b92fa570db4fdea97e0d89d5ab36ff/view"},"naics":{"codes":["325920"],"primary":"325920"},"title":"Design and Construction of a Modernized Industrial Wastewater Treatment Facility (Bioplant) at Radford Army Ammunition Plant (RFAAP)","agency":{"office":{"code":"W519TC","name":"W6QK ACC-RI"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"61299-0000","city":"ROCK ISLAND","state":"IL","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"archive_date":"2026-09-30","archive_type":"auto_custom"},"contacts":[{"name":"Steffanie L. Adams","role":"primary","email":"steffanie.l.adams.civ@army.mil","phone":"5206930043"},{"name":"Mallory Schmitt","role":"secondary","email":"mallory.d.schmitt.civ@army.mil","phone":"5206929882"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"54b92fa570db4fdea97e0d89d5ab36ff","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T07:50:12.777658Z","row_sha256":"75881c50d2e1c047db3c3fc51be4431510b78fe6c2731fd1faa49b6da5841bd8","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-16T07:50:12.777658Z","first_seen_at":"2026-09-15T22:52:52.472456Z"},"description":{"text":"Constructed in the 1940s, Radford Army Ammunition Plant (RFAAP) is a critical national security asset, serving as the last remaining CONUS Government-owned facility capable of manufacturing nitrocellulose (NC), nitroglycerin (NG), single-base, multi-base, and solventless propellants. The industrial wastewater generated by these manufacturing processes contains complex chemical components—including solvents and propellant residues (solid, dissolved, or suspended energetic materials)—which must be rigorously treated prior to discharge into the New River. The legacy RFAAP Bioplant, constructed in the 1980s, is significantly past its useful service life and acts as a single point of failure for plant operations. Crucially, the facility is located within the 100-year floodplain, exposing it to severe operational risks, as demonstrated by an emergency shutdown during Hurricane Helene in 2024. Due to these critical vulnerabilities, project funding has been accelerated to FY26. Furthermore, the aging facility is increasingly incapable of consistently treating the plant's evolving wastewater streams. RFAAP discharge is strictly regulated by the Virginia Department of Environmental Quality (VDEQ) via a Virginia Pollutant Discharge Elimination System (VPDES) permit under the Clean Water Act. Recently, the legacy plant has suffered a high rate of compliance failure, registering 14 permit violations across three separate incidents within a 16-month period. These violations primarily resulted from an inability to adequately process Biochemical Oxygen Demand (BOD), Chemical The overarching goal is for the offeror(s) to develop design and construction of a wastewater treatment process and deliver a completed solution to the Government. Follow-On Contracts or Transactions (Phase II): In accordance with the authority of 10 U.S.C. § 2808a, the potential award of a future Other Transaction may result in the award of a follow-on contract or transaction for site preparation and construction without the use of competitive procedures, provided that the initial transaction was competitively awarded, the participant(s) successfully completed the project, and the follow-on is for the same or similar scope of work. Therefore, upon determination that the participant(s) in the transaction successfully completed the design project provided for in the transaction, or in the event that a particularly favorable or unexpected result is accomplished that justifies transition to production, this design project may result in the award of a follow-on contract for advancement to Issue for Construction (IFC) status, site preparation, construction, commissioning, and transition without the use of competitive procedures. This RFS is for a contemplated OTA that, if awarded, will be awarded in accordance with 10 U.S.C. § 2028a, Facility construction or repair: transactions other than contracts and grants. Interest & Question Submittal Deadline: 7 AUG 2026 / 1500CDT 18 August 2026: Update has been made to the .pdf attachment RFS to correct typographical errors wherein an incorrect citation was used (10 U.S.C. 2028a). Those errors have been corrected to 10 U.S.C. 2808a. Proposal Due Date/Time: extended to 28 August 2026 / 1600CT","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"W519TC-26-R-BIOR","place_of_performance":{"zip":"24141","city":{"name":"Radford"},"state":{"code":"VA"},"country":{"code":"USA"}},"product_service_code":"M1EA"}],"due_at":"2026-08-28T17:00:00Z","due_date":"2026-08-28","closes_at":"2026-08-28T17:00:00Z","awardable":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W519TC","office_name":"W6QK ACC-RI","state":"VA","country":"USA","winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T07:31:38.954589Z","principal_notice_id":"54b92fa570db4fdea97e0d89d5ab36ff","description":{"text":"Constructed in the 1940s, Radford Army Ammunition Plant (RFAAP) is a critical national security asset, serving as the last remaining CONUS Government-owned facility capable of manufacturing nitrocellulose (NC), nitroglycerin (NG), single-base, multi-base, and solventless propellants. The industrial wastewater generated by these manufacturing processes contains complex chemical components—including solvents and propellant residues (solid, dissolved, or suspended energetic materials)—which must be rigorously treated prior to discharge into the New River. The legacy RFAAP Bioplant, constructed in the 1980s, is significantly past its useful service life and acts as a single point of failure for plant operations. Crucially, the facility is located within the 100-year floodplain, exposing it to severe operational risks, as demonstrated by an emergency shutdown during Hurricane Helene in 2024. Due to these critical vulnerabilities, project funding has been accelerated to FY26. Furthermore, the aging facility is increasingly incapable of consistently treating the plant's evolving wastewater streams. RFAAP discharge is strictly regulated by the Virginia Department of Environmental Quality (VDEQ) via a Virginia Pollutant Discharge Elimination System (VPDES) permit under the Clean Water Act. Recently, the legacy plant has suffered a high rate of compliance failure, registering 14 permit violations across three separate incidents within a 16-month period. These violations primarily resulted from an inability to adequately process Biochemical Oxygen Demand (BOD), Chemical The overarching goal is for the offeror(s) to develop design and construction of a wastewater treatment process and deliver a completed solution to the Government. Follow-On Contracts or Transactions (Phase II): In accordance with the authority of 10 U.S.C. § 2808a, the potential award of a future Other Transaction may result in the award of a follow-on contract or transaction for site preparation and construction without the use of competitive procedures, provided that the initial transaction was competitively awarded, the participant(s) successfully completed the project, and the follow-on is for the same or similar scope of work. Therefore, upon determination that the participant(s) in the transaction successfully completed the design project provided for in the transaction, or in the event that a particularly favorable or unexpected result is accomplished that justifies transition to production, this design project may result in the award of a follow-on contract for advancement to Issue for Construction (IFC) status, site preparation, construction, commissioning, and transition without the use of competitive procedures. This RFS is for a contemplated OTA that, if awarded, will be awarded in accordance with 10 U.S.C. § 2028a, Facility construction or repair: transactions other than contracts and grants. Interest & Question Submittal Deadline: 7 AUG 2026 / 1500CDT 18 August 2026: Update has been made to the .pdf attachment RFS to correct typographical errors wherein an incorrect citation was used (10 U.S.C. 2028a). Those errors have been corrected to 10 U.S.C. 2808a. Proposal Due Date/Time: extended to 28 August 2026 / 1600CT","html":null,"origin":"extract"},"contacts":[{"name":"Steffanie L. Adams","role":"primary","email":"steffanie.l.adams.civ@army.mil","phone":"5206930043"},{"name":"Mallory Schmitt","role":"secondary","email":"mallory.d.schmitt.civ@army.mil","phone":"5206929882"}],"place_of_performance":{"zip":"24141","city":{"name":"Radford"},"state":{"code":"VA"},"country":{"code":"USA"}},"office_address":{"zip":"61299-0000","city":"ROCK ISLAND","state":"IL","country":"USA"},"naics_codes":["325920"],"award":null,"attachments":[],"awards":[],"related":[{"key":"W519TC26RCHRA","latest_notice_id":"8148f284b02543f381d4a4c8bb147620","title":"Sources Sought: Commercial Low-Code Automation Platform Licenses & Services (Appian EA)","solicitation_number":"W519TC26RCHRA","notice_type":"r","first_type":"r","first_posted":"2026-09-15","last_posted":"2026-09-15","notices":2,"due_at":"2026-09-16T20:30:00Z","due_date":"2026-09-16","closes_at":"2026-09-16T20:30:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W519TC","office_name":"W6QK ACC-RI","naics":null,"psc":"7A21","set_aside":null,"state":"MD","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T07:50:43.959643Z"},{"key":"W519TC26QSP01","latest_notice_id":"a95dd0460d8e4673801d83c2a6541278","title":"Spotter Global C40-EXT Radar System","solicitation_number":"W519TC-26-Q-SP01","notice_type":"k","first_type":"k","first_posted":"2026-09-10","last_posted":"2026-09-10","notices":1,"due_at":"2026-09-17T15:00:00Z","due_date":"2026-09-17","closes_at":"2026-09-17T15:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W519TC","office_name":"W6QK ACC-RI","naics":"334511","psc":"5840","set_aside":null,"state":"IL","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T07:31:38.954589Z"},{"key":"W519TC26RA071","latest_notice_id":"3cd110dcfa16453c9784d8913d03352a","title":"Repair Quarters 1 - Driveways and Sidewalks (Amendment 0003)","solicitation_number":"W519TC-26-R-A071","notice_type":"o","first_type":"o","first_posted":"2026-08-27","last_posted":"2026-09-15","notices":4,"due_at":"2026-09-17T15:00:00Z","due_date":"2026-09-17","closes_at":"2026-09-17T15:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W519TC","office_name":"W6QK ACC-RI","naics":"237310","psc":"Z2LB","set_aside":"SBA","state":"IL","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T07:50:43.959643Z"},{"key":"W519TC26QUL26","latest_notice_id":"9b1b171b8b09454b83bafd646a06a705","title":"Ultralytics Commercial Software License","solicitation_number":"W519TC-26-Q-UL26","notice_type":"k","first_type":"k","first_posted":"2026-09-10","last_posted":"2026-09-10","notices":1,"due_at":"2026-09-17T17:00:00Z","due_date":"2026-09-17","closes_at":"2026-09-17T17:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W519TC","office_name":"W6QK ACC-RI","naics":"513210","psc":"7A21","set_aside":null,"state":"IL","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T07:31:38.954589Z"},{"key":"W519TC26QA181","latest_notice_id":"b21491d86e06437faeb13130e3d804bf","title":"Cincinnati Lathe MO Retrofit","solicitation_number":"W519TC-26-Q-A181","notice_type":"o","first_type":"o","first_posted":"2026-08-21","last_posted":"2026-09-11","notices":4,"due_at":"2026-09-17T23:00:00Z","due_date":"2026-09-17","closes_at":"2026-09-17T23:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W519TC","office_name":"W6QK ACC-RI","naics":"333517","psc":"3416","set_aside":"SBA","state":"IL","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T07:31:38.954589Z"}]}