# Rubb Shelter Inspections

Canonical: https://abierto.us/opportunities/w50s7725q0002

- Solicitation number: W50S77-25-Q-0002
- Notice type: Special notice (first published as combined synopsis and solicitation)
- Status: Closed. Deadline was August 28, 2025 at 3:00 PM EDT
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W7N2 Uspfo Activity Txang 147 (W50S77)
- NAICS: 332311 Prefabricated Metal Building and Component Manufacturing
- Product or service code: 5410 Prefabricated and Portable Buildings
- Set-aside: Total small business set-aside
- Place of performance: Houston, Texas
- County: Harris County (FIPS 48201). https://abierto.us/counties/harris-county-tx-48201
- City: Houston. https://abierto.us/cities/houston-tx-4835000
- First posted: July 9, 2025
- Last posted: August 5, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/cfd2be081447407b8351d3668686cf0f/view

## Description

The 147th ATKW, Texas Air National Guard, intends to sole source inspection services of currently owned Aircraft Shelters. The repairs will consist of:

The contractor shall provide all management, tools, supplies,equipment, and labor necessary to operate and maintain the required inspections. Structures aredesigned to require a minimal amount of maintenance over the life of the structures. The inspectionshould be performed bi-annually or after the structures are exposed to winds or snow loads closeto the designed limit of the structure. 2.1. INSPECTION REQUIREMENTS 2.1.1.

Check fabric tension around perimeter by pushing out fabric by hand from the inside of the structure at shoulder height. PVC should snap back sharply when released if correctly tensioned. Tighten as required. Removal of bird netting may be required. 2.1.2. Check tension rods along foundation for equal tension and lock nuts set. Tighten as required as required to equal tension in all rods in each bay area. Tighten any loose lock nuts as needed. Removal of bird netting may be required. 2.1.3.

Check shackles connecting tension rods to foundation for loose pins or missing safety wire. Tighten pins as required and replace missing safety wire. Removal of bird netting may be required. 2.1.4. Check that the PVC covering is tensioned around the entire perimeter, Doors and vents. Reattach any loose PVC. Removal of bird netting may be required. 2.1.5. Check for any holes or rips in the PVC cover. Damage should be repaired according to the PVC repair procedure. Removal of bird netting may be required.

2.1.6 Check for areas of damaged galvanization or corrosion. Remove any corrosion and cover with a zinc rich coating. Removal of bird netting may be required. 2.1.7. Spot check a sample of various bolts for tightness. Tighten as required. A325 bolts are tightened according to the turn-of –the-nut method given in the A.I.S.C steel manual, 16th edition.This states that A325 bolts less than 4 diameters in length must be tightened an additional 1/3 turn past snug tight.

Note A325 bolts in structure are less then 4 diameters long. All non A325 bolts are snug tight. Removal of bird netting may be required. 2.1.8. Check wind bracing cables for proper tensioning. They should be sag free. If cables arefound to have sag, tighten a minimum of two full turns past the point where all the slack has been taken out of the cable. Removal of bird netting may be required. 2.1.9. Check node restraint cables for proper tension. Node restraint cables should be free of sagand snug tight.

Removal of bird netting may be required. 2.1.10. STEELWORK INSPECTION - Check steelwork for missing or damagedcomponents. Replace or repair any damaged components found. Removal of bird netting may be required. The 147th ATKW, Texas Air National Guard, intends to sole source the inspections as the current assets were purchased from Rubb Inc. and must be repaired, inspected, and maintained by the company to ensure the warranty for the shelters stays intact. Work by any other vendor would void any warranty for the shelters. FAR 13.106-1(b)(1) soliciting from one responsible source.

## Publications

- July 9, 2025: Combined synopsis and solicitation, due July 23, 2025 at 3:00 PM EDT. Notice 8a75c691c9824a5cbc657de87d005c39. https://sam.gov/workspace/contract/opp/8a75c691c9824a5cbc657de87d005c39/view
- July 23, 2025: Combined synopsis and solicitation, due July 29, 2025 at 3:00 PM EDT. Notice a2f7654425804b99aa8fe1fa33f63b00. https://sam.gov/workspace/contract/opp/a2f7654425804b99aa8fe1fa33f63b00/view
- July 31, 2025: Combined synopsis and solicitation, due August 28, 2025 at 3:00 PM EDT. Notice 6e172f2066294073a3560dee6adb7942. https://sam.gov/workspace/contract/opp/6e172f2066294073a3560dee6adb7942/view
- August 5, 2025: Special notice, due August 19, 2025 at 5:00 PM EDT. Notice cfd2be081447407b8351d3668686cf0f. https://sam.gov/workspace/contract/opp/cfd2be081447407b8351d3668686cf0f/view

## Points of contact

- SMSgt Shawn T. Stewart, shawn.stewart.4@us.af.mil
- MSgt Buddy Ciemiengo, buddy.ciemiengo.1@us.af.mil

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/w50s7725q0002.