# Paint and Lights Bldg 102 & Bldg 110

Canonical: https://abierto.us/opportunities/w50s6t26qa027

- Solicitation number: W50S6T26QA027
- Notice type: Solicitation
- Status: Closed. Deadline was July 22, 2026 at 5:00 PM EDT
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W7MX Uspfo Activity Caang 144 (W50S6T)
- NAICS: 238320 Painting and Wall Covering Contractors
- Product or service code: N080 Installation of Equipment: Brushes, Paints, Sealers, and Adhesives
- Set-aside: Total small business set-aside
- Place of performance: Fresno, California
- County: Fresno County (FIPS 06019). https://abierto.us/counties/fresno-county-ca-06019
- City: Fresno. https://abierto.us/cities/fresno-ca-0627000
- First posted: June 16, 2026
- Last posted: July 16, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/147aba8605734310b08ca2435c0409d2/view

## Description

This requirement is for painting interior surfaces and upgrade lighting in office space and two vehicle workshops. Preparatory work will include repairing walls, sanding, and priming. Approximately 2,000 square feet of office space, and 5,500 square feet of production areas will be painted. The contractor will not be responsible for moving furniture nor equipment, but they must ensure it is protected.

The contractor will also be responsible for replacing all interior incandescent light bulbs with LED bulbs Request for Quote (RFQ) details are provided on the attached solicitation. This requirement is being solicited as a small business set-aside. Review the RFQ solicitation instructions for quote submission criteria. Quotes shall be submitted electronically to the following email addresses: jarrod.sanchez@us.af.mil; justin.scales.1@us.af.mil A site visit is tentatively scheduled for Wednesday 24 June at 0900 PDT.

The designated rally point will be the west gate visitor parking lot. Parking space is limited therefore carpooling is strongly advised. To be granted base access, Offerors must complete Defense Biometric Identification System (DBIDS) Prequalification and submit a base access form. Complete all fields under the CONTRACTOR/VENDOR/VISITOR INFORMATION section consisting of attendee names, citizenship, and DBIDS code (6-digit code). The base access form must be provided before the site visit.

Refer to Attachment, Base Access Request, for additional instructions. Questions will be accepted until seven days prior to solicitation response deadline. The site visit is not mandatory but strongly recommended. Offerors are responsible for verifying conditions at the project site. As required by 15 U.S.C. § 644(w), implemented by RFO FAR 36.101-4, the following information is provided to interested small businesses: (A).

The National Guard Bureau (NGB) has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts, other than those described at FAR 43.204, DFARS 243.204 and Army FAR Supplement (AFARS) 5143.204. (B).

Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the NGB is currently unavailable, however data for Department of the Army (which NGB reports to) is listed below:

**Selected Agency:** DEPT OF THE ARMY Time to definitize after receipt of an adequate Change Order Definitization Proposal under Construction Contracts: Number of Change Order Proposals definitized under Construction Contracts 30 days or less: 0 31 to 60 days: 1 61 to 90 days: 0 91 to 180 days: 0 181 to 365 days: 1 Greater than 365 days: 1 After completion of contract performance via a contract modification addressing all un-definitized equitable adjustments received during contract performance 2 Amendment 1 Issued: Updates have been made to the solicitation.

Amendment 0001 must be acknowledged to be considered for award. The SF30 must be acknowledged by completing signature fields at 15a, b, c. Submit the SF30 with your quote.

**Update 1:** RFI questions have been updated to conform to the SOW. Question one (1) was updated. The following attachment provides current responses: RFI Question and Answers for Bldg. 102, 110, 1-11 (b)

## Publications

- June 16, 2026: Solicitation, due July 17, 2026 at 5:00 PM EDT. Notice 6ae7afa5a44648238910eb848e8ec732. https://sam.gov/workspace/contract/opp/6ae7afa5a44648238910eb848e8ec732/view
- June 16, 2026: Solicitation, due July 17, 2026 at 5:00 PM EDT. Notice b073123db8794bda98213a5f1498fe95. https://sam.gov/workspace/contract/opp/b073123db8794bda98213a5f1498fe95/view
- July 15, 2026: Solicitation, due July 22, 2026 at 5:00 PM EDT. Notice 8c8c4d0811614807b5d3b9fa0854dfc6. https://sam.gov/workspace/contract/opp/8c8c4d0811614807b5d3b9fa0854dfc6/view
- July 16, 2026: Solicitation, due July 22, 2026 at 5:00 PM EDT. Notice 147aba8605734310b08ca2435c0409d2. https://sam.gov/workspace/contract/opp/147aba8605734310b08ca2435c0409d2/view

## Points of contact

- Justin Scales, justin.scales.1@us.af.mil, 5594545129
- Jarrod Sanchez, jarrod.sanchez@us.af.mil, 5594545129

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/w50s6t26qa027.