# Marley NC 9200 / 8310 Cooling Towers

Canonical: https://abierto.us/opportunities/sj446871

- Solicitation number: SJ446871
- Notice type: Solicitation
- Status: Closed. Deadline was May 24, 2024 at 2:00 PM EDT
- Department: Department of Energy
- Contracting office: Brookhaven Natl Lab -Doe Contractor (899033)
- NAICS: 333415 Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing
- Product or service code: 4130 Refrigeration and Air Conditioning Components
- Place of performance: Upton, New York
- County: Suffolk County (FIPS 36103). https://abierto.us/counties/suffolk-county-ny-36103
- First posted: May 6, 2024
- Last posted: May 6, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/ad2cbb41c1ba460c9c57ab6771123697/view

## Description

BSA will make award(s) to the responsive and responsible offeror(s) who submits the lowest total price and who meets all of BSA’s technical requirements, as stated herein. Multiple Awards may be made if in the best interest of BSA.

**Qty2:** Tower Model (box size) NC8310, TU12X Eliminator replacement (top section only) includes packs and stainless steel hardware to re-install bottom retainer, per cell.

**Qty2:** Tower Model (box size) NC8310, TU12X Eliminator replacement (bottom section only) includes packs only, per cell.

**Qty2:**

**GEAREDUCER 2250 5.50 CC2 Qty6:** Oil Synthetic, ISO 150, 1 Gallon container Qty2 : Tower Model NC8310, 20mil MX75 fill replacement includes fill sheets, splice tubes(to splice cut tubes back together) and all hardware to install, per cell, for stainless steel tower.

**Qty2:** Tower Model (box size) NC9200, TU12X Eliminator replacement (top section only) includes packs and stainless steel hardware to re-install bottom retainer, per cell.

**Qty2:** Tower Model (box size) NC9200, TU12X Eliminator replacement (bottom section only) includes packs only, per cell.

**Qty2:**

**GEAREDUCER 2250 4.56 CC2 Qty6:** Oil Synthetic, ISO 150, 1 Gallon container Qty2 : Tower Model NC9200, 20mil MX75 fill replacement includes fill sheets, splice tubes(to splice cut tubes back together) and all hardware to install, per cell, for stainless steel tower. FOB ORIGIN Collect

## Publications

- May 6, 2024: Solicitation, due May 24, 2024 at 2:00 PM EDT. Notice ad2cbb41c1ba460c9c57ab6771123697. https://sam.gov/workspace/contract/opp/ad2cbb41c1ba460c9c57ab6771123697/view

## Points of contact

- Stephen Johnston, sjohnston@bnl.gov

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/sj446871.
